Bridges/Flyovers
 1. Technical Excellence in Areas of Activities   

IRCON has got wide range of experience in constructing Bridges & Flyovers:
  • With pre-stressed Concrete using the most modern type of launching truss –
           Pre-stressed pre-cast continuous box girders
           on curve, bridges Viaducts (RCC /
           Pre-Stressed conc.), Elevated portion for the
           MRTS.
  • Bridge works on open foundation in rocky strata –
           Major and Important perennial rivers, viaducts
           and ocean creeks by foundations such as open
           foundations in rocky strata.
  • Bridges on Well Foundation etc., caissons with /without Pneumatic sinking.
  • Construction of viaducts with 70 M height.
  • Construction of flyovers on busy intersections in India and Abroad.
  • Construction of Bridges in very high terrain of Jammu & Kashmir
  • Cable Stayed Bridge.  
 2. Salient features of Completed Projects

ABROAD
  • Senen Flyover Project, Jakarta Indonesia INDONESIA – Jan 1993 – Mar 1995 – US$ 11 million
  • Pramuka - Matraman Flyover Project Jakarta, Indonesia – Feb 1993 – Mar 1995 – US$ 5 million
  • Improvement of 11 Intersections at Dhaka, Bangladesh (Contract Package No. (W) (C3) – Aug 2002 – Apr 2004 – US$ 3 million

INDIA
  • Superstructure Box Grider for Metro Railway/ Kolkatta between Dum Dum Cant & NSCBI Airport Sep 2003 to May 2005 - Rs. 122 Million.

  • Design & Construction of Doubling Project upto formation Level (Second Bridge on River Mahanadi) - Rajatgarh - Barang Section of RVNL - Rs. 700 Mn.

  • Construction of Bridge between Kopria & Mansi Stations of Mansi - Saharsa Section of Gauge Conversion work and Bridge.

  • Bridge No.14 at Ch. 220040 double track B.G. 2x13.25M 2x10.6M span centre to centre of bearing RCC continuous slab) at Ch. 22715 near kamothe – May 1991 – Oct 1994 – Rs. 35 million

  • Bridge No. 28 at ch.26538 2 end span if 9.1 M and 1 central span of 10.6 M (Centre to centre of bearing RCC slab bridge in M35 concrete – May 1991 – Oct 1994 – Rs. 16 million

  • Construction of High level Road bridge across Arpa River at Bilaspur(MP) INDIA – Mar 1993 – Mar 1995 – Rs. 60 million

  • Construction of foundation either open with piles & pile caps and superstruc- ture with RCC framed piers, pier caps, pedestals neoprine bearings, RCC girder and decking for two spans as  Road over Bridge across Railway track at Ch. 1768 between tunnel and Belapur Railway station – Apr 1991 - June 1995 – Rs. 20 million

  • Construction of 3 Lane ROB by the side of Bridge No. 4 near Park Circus Rly. Station – Mar 1995 – Aug 1996 – Rs. 20 million

  • Construction & Lunching of PSC Box Girder on the already constructed sub structured on RTS alignment section -D of MRTS Project Chennai – Jun 1994 – Jul 1997 – Rs. 150 million

  • Construction of ROB over main line of S. E. Railway connecting Howrah to Kharagpur at Santragachi Yard for Kona Expressway – March 1993 to August 1998 – Rs. 28 million

  • Construction  of Western Approach Viaduct (Package-III) for KONA Expressway – Mar 1995 – Sept 1998 – Rs. 160 million

  • Construction of Eastern Approach viaduct of ROB at Prince Anwar Shah Road connector of C.M.D.A – June 1997 to Sept 1998 – Rs. 23 million

  • Construction of ROB adjacent to Dhakuria station of suburban line of Eastern Railway at Prince Anwar Shah connector – June 1997 to Sept 1998 – Rs. 5 million

  • Construction of Road Bridges across river Kewai and Joginala for M/s SECL at Kotma – Jan 1996 – Aug 1999 – Rs. 37 million

  • Construction of RUB at Khejuriaghat for NTPC (FSTPP) – Jul 1995 – Sept 1999 – Rs. 34 million

  • Flyover at JVLR - Jai Coach Junction, Mumbai – Apr 1998 – Dec 1999 – Rs. 270 million

  • Construction of ROB across Sealdah-Baruipur Section of Eastern Rly. – Aug 1999 – June 2001 – Rs. 22 million

  • Construction of Road over Bridge at Sonarpur for E-Rly. – Jan 2000 – Jul 2001 – Rs. 11 million

  • Construction of 4 No. Road over Bridges near Tiruchirapalli for Southern Railway.  - May 1999 – Aug 2001 – Rs. 27 million

  • Execution of superstructure with PSC Box girders over already completed substructure for sections 'G', 'H' & 'J' for MRTS Phase-II, Tirumalai (Luz), Velacheri – Jul 1999 – Aug 2001 – Rs. 150 million

  • Construction/Re-construction of 4 Nos. Bridges on Turnkey Basis (Pkg-VI) in Cuddalore District, Tamilnadu – Feb 1999 – Jan 2002 – Rs. 190 million

  • Gandak Road Bridge on River Gandak for N-E Rly. – Jan 1998 – May 2002 – Rs. 102 million

  • ROBs over Railway Lines on deferred payment for MSRDC (Phase-I) – Mar 1997 – May 2002 – Rs. 900 million

  • ROB at Fatuha for E-Rly (Bridge portion & Approaches) – Sept 1998 – May 2002 – Rs. 82 million

  • ROBs over Railway Lines on deferred payment for MSRDC (Phase-II) – Mar 1997 – Sept 2002 – Rs. 850 million

  • Flyover for outer ring road at white field, Bangalore – Nov 2000 – Sept 2002 – Rs. 59 million

  • Construction of Cable stayed bridge and approaches at Bangalore – Aug 1998 – Jan 2003 – Rs. 397 million

  • Construction of 7.10 M wide and 4.50 M wide  each 45.0 M long underpasses by Jack Pushing Method along Dum Dum Road near Bridge No. 27 at Dum Dum Railway Station of Eastern Railway.Dum Dum Underpass for CMDA, Kolkata – Jul 2001 – Mar 2004 – Rs. 73 million

  • Dum Dum Underpass for CMDA, Kolkata - July 2001 - Dec 2004 - Rs. 85 Mn.

  • Construction of Approaches at Sonarpur for CMDA, Kolkata - Rs. 92 Mn.

 3. Salient features of On-going Projects

INDIA

  • Mansi - Saharsa Railway Bridge Project, Khagaria (Bihar) – Rs. 350 million

  • Construction of Elevated structure for single line track consisting of superstructure with RCC girders over the completed sub-structure (piers) between Ch. 1040 M to 3810 M in connection with extension of circular Railway from Dum Dum contonment to NSCBI Airport – Rs. 122 million.

  • Construction of Cable Stayed Road Over Bridge at Cheriya Tand. Patna Station Yard Limit in lieu of existing ROB No. 127 – A at a cost of Rs. 140 million  

  • Design & Construction of Doubling Project upto formation Level (Second Bridge on River Kuakhai) - Cuttack - Barang Section of RVNL - Rs. 380 Mn.

  • Major Bridges and Tunnels for Construction of Qazigund - Srinagar - Baramulla New B.G. Railway Line.

  • Major Bridges and Tunnels for Laole - Quazigund New BG Rail line Project.

  • Tunneling & Other structual work for Delhi Metro Rail Corporation - MC 1 B Project.

  • Construction of ROBs (Road Over Bridges) in the State of Bihar.

  • Construction of elevated structure for Double line track consisting of superstructure with prestressed Concrete box girders (Casting & Launching) over the already completed sub structure (Trestles) in connection with the Extension of Metro Railway from Tollygunge to Garia at a cost of Rs. 180 Million.

  • Construction of ROBs including approaches on National Highways under MOU signed with NHAI, Northern Zone, (Punjab and J & K) - Rs. 756 Million.

  • Construction of ROBs in Madurai - Kanyakumari section of NH-7 including approaches and culverts in the State of Tamil Nadu - Rs. 1427.50

Domestic

  • National Highway Authority of India  

  • CIDCO, Mumbai

  • Indian Railways (Various Zones)

  • Public Work Department / Development Authority (Various State Govt.)

  • NTPC

  • Coalfields Limited (Various Zones)

  • CMDA (Kolkata Municipal Development Authority)

  • Electricity Board (Various States)

  • MSRDC (Maharashtra State Road Development Corporation)

  • Metropolitan Transport Project (Railways), Chennai

  • Tamilnadu Agriculture Development Project SCRDS, Govt. of Tamilnadu

  • Damodar Valley Corporation (DVC)

  • Port Trust of India

  • DMRC (Delhi Metro Rail Corporation)

  • RVNL (Rail Vikas Nigam Limited)

  • Metro Railway, Kolkata

International

  • Govt. of Indonesia

  • Ministry of Communication Roads & Highway Department (RHD), Bangladesh.

  • KTMB (Malaysian Railways)

 