IRCON
has executed a large number
of SSI and Relay based Interlocking
Signalling installations in
India, Iraq, Malaysia
and Bangladesh. It has also
successfully executed
Telecommunication works for
Nigeria, Turkish, Malaysia and
Zambian Railways.
Currently
it is executing No. of projects
with M/s. Atkins for the
design, installation, testing
& commissioning in
U.K Railways. Also
executing
a signalling project in Iran.
Details
of some of the important Signalling
& Telecommunication projects
executed by IRCONare enclosed.
With
in house design, execution,
project management capabilities,
IRCON
provides turnkey solutions for
all types of signalling &
communication projects for both
Railway and Non-Railway clients
worldwide.IRCON
can design and provide systems
to suit varying needs of the
client, from:
Mechanical
Signalling to Solid State
Interlocking, CTC, AFTC, Axle
Counter etc.
From-O/H
land line Communication System
to Fibre Opticbased CommunicationSystem
Mechanical
Telephone exchange to Digital
switching system
Electrical Signalling
system for 25 stations of
Iraqi Railways, (1982-85)
& (1985-88),US$ 30 million.
Radio based CTC and Axle
Counter based Block working
for Zambian Railways, covering 850Km
(1988-90) US$ 7.7millon.
Relay Interlocking at
6 stations for Bangladesh
Railways
(1996-98) US$ 2 millon.
Model Room for Bangladesh
Railways (1991-92) US$ 0.7
million.
Solid State Interlocking
with CTC, AFTC, Axle Counter
for 3 stations for MalaysianRailways
(1999-2001) US$ 7.26 million.
Solid State Interlocking
at 4 stations, & modification
of existing Mechanical Signalling
at 25 stations and modification
of existing Relay Interlocking
at 2 stations for Bangladesh
Railways (2003-04) USD$
3.16 million.
Telecom
Telecommunication
work as turnkey contract for
Iraqi Railways (1985-87) US$
4 million
Telecommunication
system for Railway electrification
for Turkish Railways (1989-91)US$
3.6 million.
Optical
Fibre Communication System,IT requirements and
PABX for MalaysianRailways
(1999-2001) - US$ 1. 7 million.
INDIA
Signalling
Interlocking at 60 stations, more than 70%
of them on 25 KV electrified
route Rs.606million
(US$ 18.9 million)
AxleCounterbasedBlocksignallingfor26stationsonelectrifiedroute,a developmental
project, (1990-94) Rs 37
million (US$ 1.2 million)
Relay Interlocking at 32 stations for Captive
Railway networks (1997-2002)
Rs.335million
(US$9.2 million)
Solid
state Interlocking System
at Simhadri for 2 stations
of Power Generation Company
(NTPC) (2001-2002) US$ 1.6
million.
Panel
Interlocking System at Talcher
for 5 stations of Power
Generation Company (NTPC)
US$ 0.96 million.
Telecom
Optical
Fibre based communication
along electrified route
on Indian Railways 432 Kms.
(1999-2000)
Rs.215 million. US$ 5.6
million)
Optical
Fibre indoor equipment along
electrified route of Indian
Railways 1200 Kms. (1996-2002)
Rs.300 million. (US$7.5 million)
Telecommunication
facilities for Gas pipeline
Authorities (1999-01) Rs.
39 million. (US$ 0.9 million)
OFC Communication on Ahmedabad-Baroda-Surat section
of Indian Railways for commercial
exploitation - 300 Kms (1999-2001)
Rs. 150 million (US$ 3.75 million)
Indoor
equipment for Indian Railways
along East- Coast mainline
for 600 Kms, 67 stations Rs.88.4
million (US$ 2.2 million).
OFC
based communication system
in Jaipur - Ahmedabad section
of 690 Kms of Indian Railways
US$ 2.56 million.
OFC
based communication system
on Salem-Bangalore Section
of South West Railway, Ballarshah-Kazipet-Bibi
Nagar Section of South Central
Railway, Hajipur-Muzaffarpur-Barauni
Section of East Coast Railways,
Malda-Rajgram Section of
Eastern Railways
Total cost
US $ 4.06 Million
Design, supply and supervision of installation
of Relay Interlocking system
for 25 stations on Iranian Railways 1999-2002, US $ 25 million. This also includes Cables,
Centralized Traffic Control
(CTC), Hot Box Detector
and Flat Wheel Detector.
All the supplies have been
completed, client is currently
doing the installation which
is being supervised by IRCON.
The project is being done
on deferred payment basis.
The progress on date in
98%.
Design
supports
for re-signalling of Rail
System in U.K.. Rail Track,
U.K. is spending 60 billion
Pounds Sterling in the development
and modernization of the
Rail infrastructure. IRCON
is associated with W.S.
Atkins who is carrying out
the Signalling works on
West-Coast mainline. IRCON
is not only associated in
the design of the system
for which an office has
been set up at Sharjah,
UAE but is also involved
in the testing & commissioning
of the systems being installed
for which it has a technical
team in U. K.
Solid State
Interlocking based Modern
Signalling System including
Design, Supply,
Installation, Testing &
Commissioning and
maintenance of signaling
system on Turnkey basis at
Laskarpur, Rashidpur Satgaon,
Srimangal, Bhanugach,
Shamshernagar, Tilagaon,
Langla, Baramchal, Bhatera
Bazar, Maijgaon & Mogla
Bazar Station of Banladesh
Railway situated on Akhaura
- Sylhet section of East
Zone. Total cost of US $7,48
million.