IRCON
has executed a large number
of Electronic (Solid State) Interlocking
and Relay based Interlocking Signalling installations in
Iraq, Malaysia
and Bangladesh and India. It has also
successfully executed
Telecommunication works for
Nigeria, Turkish, Malaysian and
Zambian & Indian Railways.
Currently Ircon is executing
projects in Malaysia, Iran,
Sharjah (UAE) and India.
With
in house design, execution,
project management capabilities,
IRCON
provides turnkey solutions for
all types of Signalling &
Communication projects for both
Railway and Non-Railway clients
worldwide.IRCON
can design and provide systems
to suit varying needs of the
client, from:
Mechanical
Signalling to Solid State
Interlocking, CTC, AFTC, Axle
Counter etc.
From-O/H
land line Communication System
to Fibre Opticbased CommunicationSystem
Mechanical
Telephone exchange to Digital
switching system
Electrical Signalling
system for 25 stations of
Iraqi Railways, (1982-85)
& (1985-88),USD 30 million.
Radio based CTC and Axle
Counter based Block working
for Zambian Railways, covering 850Km
(1988-90), Project Cost: USD 7.7millon.
Relay Interlocking at
6 stations for Bangladesh
Railways
(1996-98) Project
Cost: USD 2 million.
Model Room for Bangladesh
Railways (1991-92) Project Cost: USD 0.7
million.
Solid State Interlocking
with CTC, AFTC, Axle Counter
for 3 stations for MalaysianRailways
(1999-2001) Project Cost: USD 7.26 million.
Solid State Interlocking
at 4 stations, & modification
of existing Mechanical Signalling
at 25 stations and modification
of existing Relay Interlocking
at 2 stations for Bangladesh
Railways (2003-04) Project Cost: USD
3.83 million.
Design, supply and
supervision of installation
of Relay Interlocking system
with CTC for 25 stations on
Iranian Railways 2000-2006,
Project Cost : USD 25
million.
Solid State Interlocking
based Modern Signalling
System including Design,
Supply, Installation,
Testing & Commissioning and
maintenance of signaling
system on Turnkey basis at
12 Stations of Bangladesh
Railway situated on Akhaura
- Sylhet section of East
Zone. (2005-08) Project cost
: USD 7.48 million.
Telecom
Telecommunication
work as turnkey contract for
Iraqi Railways (1985-87) Project Cost: USD
4 million
Telecommunication
system for Railway electrification
for Turkish Railways (1989-91) Project Cost: USD
3.6 million.
Optical
Fibre Communication System,IT requirements and
PABX for MalaysianRailways
(1999-2001) Project Cost: USD 1. 7 million.
INDIA
Signalling
Interlocking at 60 stations, more than 70%
of them on 25 KV electrified
route Rs.606million
(USD 18.9 million)
AxleCounterbasedBlocksignallingfor26stationsonelectrifiedroute,a developmental
project, (1990-94) Rs 37
million (USD 1.2 million)
Relay Interlocking at 32 stations for Captive
Railway networks (1997-2002)
Rs.335million
(USD9.2 million)
Solid
state Interlocking System
at Simhadri for 2 stations
of Power Generation Company
(NTPC) (2001-2002) USD 1.6
million.
Panel
Interlocking System at Talcher
for 5 stations of Power
Generation Company (NTPC)
USD 0.96 million.
Telecom
Optical
Fibre based communication
along electrified route
on Indian Railways 432 Kms.
(1999-2000)
Rs.215 million. USD 5.6
million)
Optical
Fibre indoor equipment along
electrified route of Indian
Railways 1200 Kms. (1996-2002)
Rs.300 million. (USD 7.5 million)
Telecommunication
facilities for Gas pipeline
Authorities (1999-01) Rs.
39 million. (USD 0.9 million)
OFC Communication on Ahmedabad-Baroda-Surat section
of Indian Railways for commercial
exploitation - 300 Kms (1999-2001)
Rs. 150 million (USD 3.75 million)
Indoor
equipment for Indian Railways
along East- Coast mainline
for 600 Kms, 67 stations Rs.88.4
million (USD 2.2 million).
OFC
based communication system
in Jaipur - Ahmedabad section
of 690 Kms of Indian Railways
USD 2.56 million.
OFC
based communication system
on Salem-Bangalore Section
of South West Railway, Ballarshah-Kazipet-Bibi
Nagar Section of South Central
Railway, Hajipur-Muzaffarpur-Barauni
Section of East Coast Railways,
Malda-Rajgram Section of
Eastern Railways
Total cost
US D 4.06 Million
Design, Supply, Erection, Testing and Commissioning
of Signalling and
Communication system for
Electrified Double Track
Project between Seremban to
Gemas for KTMB, Malasia.
Total Cost: USD 116 Million.
Signalling system comprises
of :
i. Electronic Interlocking based Automatic
Signalling system.
ii. Automatic Train Protection
iii. CTC for Train Management System
including Train Describer
System, Train Timetable
System, Automatic Route
Setting and Automatic Train
Reporting
facility at
two locations.
Communication system
comprises of:
i. Fibre Optic based
communication system.
ii. Automatic Telephone
Switching equipment.
iii. Pax type Signal Post Telephone
system.
iv. Passenger Information system.
v. Automatic Fare Collection
system.
vi. CCTV and SCADA
vii. STAR & SPOT systems
Design
supports
for re-signalling of Rail
System in U.K. Network
Rail,
U.K. is spending 60 billion
Pounds Sterling in the development
and modernization of the
Rail infrastructure.
IRCON
is associated with W.S.
Atkins who is carrying out
the Signalling works on
West-Coast mainline.
IRCON
is associated in
the design of the system
and is also involved in
the testing & commissioning
of the systems being
installed by W S Atkins.
Design,
Supply, Erection, Testing
and Commissioning of
Signalling &
Telecommunication system to
suit 25KV, AC, 50 Hz, Single
Phase RE in
Mugalsarai-Sultanpur-Utratia
section of Northern Railway.
Total Cost Rs. 25.5 Crores.
Design,
Supply, Erection, Testing
and Commissioning of
Electronic Interlocking
based Signalling system &
Telecommunication system in
Quazigund - Baramulla
section of Northern Railway.
Total Cost USD 22 Million.