| Nit No. | Name of Work (Click to view/download tenders) | Notification Date | Download Date | Submission Date | Opening Date | EMD(Rs.) | Corrigendum(if any) |
|
IRCON/1014/J&K-DQ/ Girder Launching /Br-11
|
Assembly, Erection & Launching of 3 x 45.7M Open Web Girders by Cantilever Launching by Coupling the Spans Method including Fabrication and Supply of Span Coupling Structures for Super Structure on Bridge No: 147 Near Banihal (Distt. Ramban J&K) for USBRL Project
|
18.05.11
|
24.05.11
|
27.06.2011 up to 15:30 hrs.
|
27.06.2011 up to 15:30 hrs.
|
2,30,000
|
|
|
IRCON/2036/TSTPP/TENDER/L.C/06/12 Dtd: 16.03.2012
|
Regradation of NH 200 in connection with construction of 3.5 Km Railway track connecting the existing MGR of NTPC Kaniha to Kaniha mines of MCL
|
16.03.12
|
16.03.12
|
09.04.2012 up to 15.00 hrs.
|
09.04.2012 at 15.30 hrs.
|
Rs. 3,49,390.00
|
|
|
IRCON/2036/TSTPS/TENDER/TRACK LINKING /05/12 Date: 18.01.2012
|
Assembling, laying & linking of broad gauge railway track from Kaniha Mines to Talcher Super Thermal Power Station with 52Kg rails including loop lines, siding, sand humps, Trap points and points & Crossings, Ballasting, Transportation of rail/ Rail panels, Transportation of sleepers, spreading and packing of ballast, linking BG Track to make it fit for rail traffic, fixing of guard rails and other miscellaneous works including supply of combination GFN Liners and supply and erection of level cr
|
18.01.12
|
18.01.12
|
09.02.2012 up to 15.00 hrs.
|
09.02.2012 at 15.30 hrs.
|
Rs. 50,250.00
|
|
|
IRCON/2048/ISC-BEHALA/TENDER/ROOF/04/11
|
Architectural Design & Drawings, Structural Design & Drawings of Space Frame/Roof Truss and its sheeting, Supply, Fabrication, Delivery, Hoisting & Fixing of suitable Space Frame/Truss arrangement for Roof along with fixing of Roof Sheeting (Aluminium Sheeting with insulating layers) (on constructed supporting structures) complete in all respect and made ready to use for the Roof of Indoor Stadium and Cricket Gallery for New Sports Complex at Gholsapur (Behala), Kolkata (W.B.)
|
14.09.11
|
19.09.11
|
12.10.2011 up to 15.00 hrs. Changed to 19.10.2011 up to 15.00 hrs.
|
12.10.2011 at 15.30 hrs. Changed to 19.10.2011 at 15.30 hrs.
|
Rs.1.75 Lacs
|
|
|
IRCON/3015/TN/ROB-RAJ/IFB/12/14 DT. 04.01.2012
|
Prequalification for construction of Road Over Bridges in the cluster of 3 to 5 ROBs under Rajasthan ROB Project of IRCON in various parts of Rajasthan
|
04.01.12
|
05.01.12
|
25.01.2012 up to 15.00 hrs.
|
25.01.2012 at 15.30 hrs.
|
00
|
|
|
IRCON/4003/SZ/Chennai-Flats / Sale/01
|
Sale of three (03)unfurnished 2BHK Residential Flats in Chennai on “as is what is basis”
|
03.03.11
|
03.03.11
|
24.03.2011 up to 15:00 hrs.
|
24.03.2011 up to 15:30 hrs.
|
Rs.4.51 Lakhs
|
|
|
. IRCON/CC/TN/SR-2046/Sivok-Rangpo/ Geotech/616 Dt.:30.12.2010
|
Geotechnical investigation including drilling of Boreholes, testing of sample etc for construction of Sivok-Rangpo New BG Rail line Project.
|
31.12.10
|
06.01.11
|
25.01.2011 up to 15.00 hrs. Changed to 28.01.2011 up to 15.00 hrs.
|
25.01.2011 at 15.00 hrs. Changed to 28.01.2011 at 15.30 hrs.
|
Rs 115,500.00
|
|
|
.: IRCON/J&K Cell/JAT/14/1014/D-Q/Support Services-M-16 /198
|
Providing support services in the Site works pertaining to execution, GT works, Survey works, Quality Control & Sampling and other miscellaneous jobs for areas from Zone-II to Zone-V in connection with Dharam – Qazigund Section of USBRL Project (Package M-16)
|
28.10.11
|
03.11.11
|
23.11.2011 up to 15.00 hrs.
|
23.11.2011 at 15.30 hrs.
|
107000
|
|
|
EOI No.IRCON/MECH/1029/RCF-RBL/EOI/01
|
Expression of Interest for "Setting up of Complete Shell Sub-Assembly and Shell assembly shop for Rail Coach Factory, Rae Bareli, UP, India
|
29.07.11
|
29.07.11
|
19.08.2011 up to 15.00 hrs. Changed to 09.09.2011 up to 15.00 hrs. Changed to 20.09.2011 up to 15.00 hrs.
|
19.08.2011 at 15.30 hrs. Changed to 09.09.2011 at 15.30 hrs. Changed to 20.09.2011 at 15.30 hrs.
|
Rs.0
|
|
|
IRCON/ 1008/ J&K-SGR/ SS for Office/ 1316 Date: 24.06.2011
|
Providing supporting service for office work for the period of Aug 2011 to July 2012 on Qazigund - Baramulla New BG Rail Line Project. (Pkg SS-01)
|
24.06.11
|
24.06.11
|
15.07.2011 up to 15.00 hrs.
|
15.07.2011 at 15.30 hrs.
|
Rs 28000/-
|
|
|
IRCON/ CC/ TN/JBNRL-2051/12/650
|
Construction of Embankment, Side Drains,
Retaining Walls and Blanketing Work, Bridges (Minor and Major) and other
ancillary items for “Construction of New B. G. Railway Line From Jogbani
To Biratnagar (Nepal)’ in Nepal portion from Km 5+445 to Km 18+601”.
|
31.01.12
|
01.02.12
|
27.02.2012 up to 15.00 hrs. Changed to 28.03.2012 up to 15.00 hrs. Changed to 30.04.2012 up to 15.00 hrs.
|
27.02.2012 at 15.30 hrs. Changed to 28.03.2012 at 15.30 hrs. Changed to 30.04.2012 at 15.30 hrs.
|
10 Lacs.
|
|
|
IRCON/ ELECT/1029/RCF-RBL/POWER TRANFO/20
|
Supply of 3-Phase 12.5/16 MVA, 132/11kV, Outdoor type power transformers with RTCC panels. All accessories and fittings complete for RCF, Rae bareli (UP).
|
01.08.11
|
01.08.11
|
22.08.2011 up to 15.00 hrs. Changed to 30.08.2011 up to 15.00 hrs.
|
22.08.2011 at 15.30 hrs. Changed to 30.08.2011 at 15.30 hrs.
|
Rs. 130,000/-
|
|
|
IRCON/.S&T/3014/RRUVNL.TENDER/367
|
Design, Supply, Installation, Testing and Commissioning of Electronic Interlocking System at Kalisindh Thermal Power Plant Yard, Jhalawar, Rajasthan for RRVUNL.
|
04.01.12
|
04.01.12
|
27.01.2012 up to 15.00 hrs.
|
27.01.2012 at 15.30 hrs.
|
Rs 5,00,000.00
|
|
|
IRCON/1008/ J&K-SGR/ Misc work of P.Way / 1316 Date: 24.06.2011
|
Executing of Misc P-Way Works and watch & Ward of P-Way Materials, track Machiniers etc for the period of July 2011 to Dec 2011 on Qazigund - Baramulla New BG Rail Line Project.
|
24.06.11
|
24.06.11
|
15.07.2011 up to 15.00 hrs.
|
15.07.2011 at 15.30 hrs.
|
Rs 19000/-
|
|
|
IRCON/1008/J&K-Cell/JAT/ GRP Barracks-Awantipora/
|
Construction of 111 Bedded GRP Barracks and other
miscellaneous works such as Compound wall, Chain Link
Fencing etc., at Awantipora Railway Station Yard (GRP-
19R) on Qazigund - Baramulla New BG Rail Line Project
(J&K).
|
03.11.11
|
09.11.11
|
25.11.2011 up to 15.00 hrs.
|
25.11.2011 at 15.30 hrs.
|
Rs 3.05 Lacs
|
|
|
IRCON/1008/J&K-DLI/ GRP Barracks -Anantnag/GRP-18R-1/
|
Construction Of 111 Bedded GRP Barracks and other miscellaneous works such as Compound wall and Chain Link Fencing etc., at Anantnag Railway Station Yard (GRP-18R-1) on Qazigund - Baramulla New BG Rail Line Project (J&K) (Package: GRP-18R-1)
|
22.11.10
|
26.11.10
|
14.12.2010 up to 15.00 hrs.
|
14.12.2010 at 15.30 hrs.
|
327000
|
|
|
IRCON/1008/J&K-DLI/ Quarters-Budgam/Q-7R Date: 02.05.2011
|
Construction Of RPF Quarters Type-II, III and IV units at Budgam Railway Station on Qazigund - Baramulla New BG Rail Line Project(J&K) (Package: Q – 7R)
|
03.05.11
|
04.05.11
|
18.05.2011 up to 15.00 hrs.
|
18.05.2011 at 15.30 hrs.
|
405000
|
|
|
IRCON/1008/J&K-DLI/ RPF&GRP Barracks -Sadura/RPF&GRP-8A
|
Construction of 42 Bedded RPF and GRP Barracks and other Miscellaneous works such as compound wall, chain link fencing, etc at Sadura Railway Station Yardon Qazigund-Baramulla New BG Rail Line Project (J&K) (Package: RPF/GRP-8A)
|
24.11.10
|
26.11.10
|
16.12.2010 up to 15.00 hrs.
|
16.12.2010 at 15.30 hrs.
|
328000
|
|
|
IRCON/1008/J&K-SGR/ barbed wire at Budgam/411 Date: 24.02.2011
|
Providing barbed wire fencing over boundary wall at Budgam Yard on Qazigund - Baramulla New BG Rail Line Project (J&K).
|
24.02.11
|
24.02.11
|
18.03.2011 up to 15.00 hrs.
|
18.03.2011 at 15.30 hrs.
|
52,000/-
|
|
|
IRCON/1008/J&K-SGR/ Chain Link Fencing at Qazigund/871 Date: 23.04.2011
|
Construction of Chain Link Fencing at Qazigund Station yard on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
23.04.11
|
25.04.11
|
18.05.2011 up to 15.00 hrs.
|
18.05.2011 at 15.30 hrs.
|
Rs 165000/-
|
|
|
IRCON/1008/J&K-SGR/ Fish Plate & MS Clamp/ OT/ 483/ 176 Date:19.01.2011
|
Manufacturing and supply of Joggled Fish Plates & MS Clamp for Joggled Fish Plates as per RDSO drawing with latest alterations including loading, leading and unloading at IRCON’s Godown at Budgam/Srinagar station yard on Qazigund-Baramulla New B.G.New rail line project. (J&k)
|
19.01.11
|
20.01.11
|
17.02.2011 up to 15.00 hrs.
|
17.02.2011 at 15.30 hrs.
|
34000/-
|
|
|
IRCON/1008/J&K-SGR/ Gabion bet Km 44.79 to 45.05/1317 Date: 24.06.2011
|
Construction of Gabion between Km 44.79 to Km 45.05 at LHS of track On Qazigund-Baramulla New BG Rail Line Project.(J&K)
|
24.06.11
|
24.06.11
|
15.07.2011 up to 15.00 hrs.
|
15.07.2011 at 15.30 hrs.
|
Rs 128000/-
|
|
|
IRCON/1008/J&K-SGR/ Hiring Vehicle-Srinagar/ VH-08/450 Date: 03.08.2011
|
Hiring of vehicles for Ircon Officer & Staff for project work of Qazigund-Baramulla New BG Rail Line Project(J&K) (Pkg VH-08)
|
03.08.11
|
03.08.11
|
24.08.2011 up to 15.00 hrs.
|
24.08.2011 at 15.30 hrs.
|
Rs 1,46,000/-
|
|
|
IRCON/1008/J&K-SGR/ House Keeping Services/2843 Date: 27.12.2011
|
Providing House keeping facilities at Ircon’s Guest Houses on Qazigund-Baramulla New BG Rail Line Project (J&K).
|
27.12.11
|
27.12.11
|
17.01.2012 up to 15.00 hrs.
|
17.01.2012 at 15.30 hrs.
|
Rs 69000/-
|
|
|
IRCON/1008/J&K-SGR/ Misc work of Br. Mech & Crusher/587/873
|
Executing the Misc work of Bridge Section, Mechanical and Crusher plant including watch & ward of stores on Qazigund - Baramulla New BG Rail Line Project.(J&K)
|
23.04.11
|
25.04.11
|
18.05.2011 up to 15.00 hrs.
|
18.05.2011 at 15.30 hrs.
|
Rs 35000/-
|
|
|
IRCON/1008/J&K-SGR/ Misc/Utility/ 587 Date: 15.02.2011
|
Providing supporting service for IRCON laboratory of Qazigund - Baramulla New BG Rail Line Project
|
15.02.11
|
21.02.11
|
09.03.2011 up to 15.00 hrs.
|
09.03.2011 at 15.30 hrs.
|
25000/-
|
|
|
IRCON/1008/J&K-SGR/ Misc/Utility/587 Date: 15.02.2011
|
Providing Utility & Support Service for office of Qazigund - Baramulla New BG Rail Line Project. (Package UL/11-12/01).
|
15.02.11
|
21.02.11
|
09.03.2011 up to 15.00 hrs.
|
09.03.2011 at 15.30 hrs.
|
25000/-
|
|
|
IRCON/1008/J&K-SGR/ Misc/Utility/587/571 Date: 11.03.2011
|
Providing Utility & Supporting Services (Bridge Section, Mechanical, Crusher and Misc work) for the balance work between Qazigund - Baramulla New BG Rail Line Project
|
11.03.11
|
12.03.11
|
02.04.2011 up to 15.00 hrs.
|
02.04.2011 at 15.30 hrs.
|
35000/-
|
|
|
IRCON/1008/J&K-SGR/ Support Service for Elect Works/ 253 Date: 01.02.2011
|
Providing Utility and Support Service for Various Electrical Works on Qazigund - Baramulla New BG Rail Line Project (J&K)
|
01.02.11
|
01.02.11
|
23.02.2011 up to 15.00 hrs.
|
23.02.2011 at 15.30 hrs.
|
22000/-
|
|
|
IRCON/1008/J&K-SGR/ Supporting Service / Date: 10.02.2012
|
Providing supporting service for site work on Qazigund - Baramulla New BG Rail Line Project.
|
10.02.12
|
11.02.12
|
05.03.2012 up to 15.00 hrs.
|
05.03.2012 at 15.30 hrs.
|
Rs 56000/-
|
|
|
IRCON/1008/J&K-SGR/ supporting Service /587/ 1171 Date: 06.06.2011
|
Providing supporting service for site work for the period of July-Dec 2011 on Qazigund - Baramulla New BG Rail Line Project (J&K)
|
06.06.11
|
06.06.11
|
28.06.2011 up to 15.00 hrs.
|
28.06.2011 at 15.30 hrs.
|
Rs 48000/-
|
|
|
IRCON/1008/J&K-SGR/ supporting service for lab/3457 Date: 19.03.2012
|
Providing utility and supporting service for Ircon Laboratory on Qazigund - Baramulla New BG Rail Line Project
|
19.03.12
|
19.03.12
|
10.04.2012 up to 15.00 hrs.
|
10.04.2012 at 15.30 hrs.
|
Rs 12500/-
|
|
|
IRCON/1008/J&K-SGR/Fish Plate & MS Clamp/OT/483/410 Date:24.02.2011
|
Manufacturing and supply of Joggled Fish Plates & MS Clamp for Joggled Fish Plates as per RDSO drawing with latest alterations including loading, leading and unloading at IRCON’s Godown at Budgam/Srinagar station yard on Qazigund-Baramulla New B.G.New rail line project. (J&k)
|
24.02.11
|
24.02.11
|
18.03.2011 up to 15.00 hrs.
|
18.03.2011 at 15.30 hrs.
|
34000/-
|
|
|
IRCON/1008/J&K-SGR/StructuralStrengthROB161
|
Carrying Out Structural strengthening of Road over Bridge No.161 at Km 82/015 on Qazigund- Baramulla New BG Rail Line project near village Russu, (J&K)
|
04.12.10
|
07.12.10
|
28.12.2010 up to 15.00 hrs.
|
28.12.2010 at 15.30 hrs.
|
1,71,000
|
|
|
IRCON/1014/J&K - DQ/ BLT - T80 / 181 Dt. 03.11.11
|
Design & Construction of B.G. Ballast-less Track (Approx. 11.30KM) in Tunnel T-80 between Banihal - Quazigund Sec. of Udhampur-Srinagar-Baramula Rail Link Project in the State of J & K (USBRL Project)
|
03.11.11
|
10.11.11
|
29.11.2011 up to 15:30 hrs. Changed to 07.12.2011 up to 15.30 hrs.
|
29.11.2011 up to 15:30 hrs. Changed to 07.12.2011 at 15.30 hrs.
|
Rs. 27 Lakh
|
|
|
IRCON/1014/J&K -DQ/GT/Zone-III/14/ 163
|
Geotechnical investigation including drilling of Boreholes upto maximum 200 mtr. depth, testing of samples (Lab tests), in-situ testing comprising Hydro-fracture (stress orientation Impression), BHTV (Borehole tele-viewer), & Dilatometer testing in different Boreholes of Tunnels, Bridges between Higni to Arpinchala in connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project.(PAKAGE-TI-4)
|
10.08.11
|
10.08.11
|
02.09.2011 up to 15.00 hrs.
|
02.09.2011 at 15.30 hrs.
|
Rs. 3.10 Lacs
|
|
|
IRCON/1014/J&K- DQ/ GT/ Zone-II &III/14/ 164
|
Geotechnical investigation including drilling of Boreholes up-to maximum 400 mtr. depth, testing of samples (Lab tests), in-situ testing comprising Hydro-fracture (stress orientation Impression), BHTV (Borehole tele-viewer) & Dilatometer testing in different Boreholes of Tunnels, Station Yard, Bridges between Urnihal (Km. 115) to Higni (Km. 120) in connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project (Package TI-4)
|
23.01.12
|
23.01.12
|
15.02.2012 up to 15.00 hrs.
|
15.02.2012 at 15.30 hrs.
|
304000
|
|
|
IRCON/1014/J&K- DQ/ GT/ Zone-II&III /14/164
|
Geotechnical investigation including drilling of Boreholes upto maximum 400 mtr. depth, testing of samples (Lab tests), in-situ testing comprising Hydro-fracture (stress orientation Impression), BHTV (Borehole tele-viewer) & Dilatometer testing in different Boreholes of Tunnels, Station Yard, Bridges between Sumber (Km. 110) to Urnihal (Km. 115) in connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project (Package TI-3)
|
23.01.12
|
23.01.12
|
15.02.2012 up to 15.00 hrs.
|
15.02.2012 at 15.30 hrs.
|
303000
|
|
|
IRCON/1014/J&K- DQ/BLT-T80/181 Dt. 03.11.11
|
Design & Construction of B.G. Ballast-less Track (Approx. 11.3KM in Tunnel T-80 between Banihal - Quazigund Section of Udhampur - Srinaagr - Baramula Rail Link Project, in the State of J&K (USBRL Project)
|
03.11.11
|
09.11.11
|
29.11.2011 up to 15:30 hrs.
|
29.11.2011 up to 15:30 hrs.
|
27,00,000/-
|
|
|
IRCON/1014/J&K-CELL/T-80 Circulating Area/ Date: 02.01.2012
|
Construction of Infrastructure Facilities consisting of Duty Hut, Morchas, Parking Space, Access roads and Helipad, Water Tank for Fire Fighting and all other ancillary works at tunnel T-80 portals in Zone-V of D-Q section in connection with Udhampur-Srinagar-Baramulla Rail Link Project in the state of J&K. (Package-T-80 Circulating Area)”.
|
02.01.12
|
04.01.12
|
24.01.2012 up to 15.00 hrs. Changed to 02.02.2012 up to 15.00 hrs. Changed to 14.02.2012 up to 15.00 hrs.
|
24.01.2012 at 15.30 hrs. Changed to 02.02.2012 at 15.30 hrs. Changed to 14.02.2012 at 15.30 hrs.
|
Rs. 7.90lacs
|
|
|
IRCON/1014/J&K-DQ-Banihal / GT -TI-1A/T-74R
|
Geotechnical Investigation Including in-situ testing comprising of Hydro-fracture(stress-orientation & Impression), BHTV ( Borehole Tele-viewer), testing in different boreholes of Tunnel T-74R between Arpinchala Station to Banihal Station in Connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project.
|
11.01.11
|
14.01.11
|
01.02.2011 up to 15.00 hrs.
|
01.02.2011 at 15.30 hrs.
|
95200
|
|
|
IRCON/1014/J&K-DQ/ Addl. Qtrs, GRPB, Misc-Banihal /SQ-3
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of Additional Type II &III Quarters and 111 Bedded GRP Barrack and other miscellaneous works at Banihal yard (Package SQ-3)
|
22.03.11
|
25.03.11
|
20.04.2011 up to 15.00 hrs.
|
20.04.2011 at 15.30 hrs.
|
914000
|
|
|
IRCON/1014/J&K-DQ/ Consult. Proj. Office-Jammu/M-11
|
J&K Rail Link Project – Dharam – Qazigund Section. Consultancy Services for Architectural, Structural, and Other related services for the construction of Proposed USBRL Project Office (G+3 Storied) at Galadni, Jammu (Package M-11)
|
19.05.11
|
31.05.11
|
21.06.2011 up to 15.00 hrs.
|
21.06.2011 at 15.30 hrs.
|
37000
|
|
|
IRCON/1014/J&K-DQ/ Consult. Proj. Office-Jammu/M-11(R -1)
|
J&K Rail Link Project – Dharam – Qazigund Section. Consultancy Services for Architectural, Structural, and Other related services for the construction of Proposed USBRL Project Office (G+3 Storied) at Galadni, Jammu (Package M-11(R-1)
|
19.08.11
|
20.08.11
|
06.09.2011 up to 15.00 hrs.
|
06.09.2011 at 15.30 hrs.
|
37000
|
|
|
IRCON/1014/J&K-DQ/ Consult. Proj. Office-Jammu/M-11R
|
“J&K Rail Link Project – Dharam – Qazigund Section. Consultancy Services for Architectural, Structural, and Other related services for the construction of Proposed USBRL Project Office (G+3 Storied) at Galadni, Jammu (Package M-11R)”
|
04.07.11
|
06.07.11
|
22.07.2011 up to 15.00 hrs.
|
22.07.2011 at 15.30 hrs.
|
37000
|
|
|
IRCON/1014/J&K-DQ/ Consultancy Tunnels Km 110-125/186 dated 09.09.2011
|
Detailed Design Consultancy of all structures including Tunnels, bridges/viaducts, Station Yards and associated works and Construction Supervision of Tunnels between km 110 & km 125 in connection with Construction of Dharam-Qazigund Section of Udhampur-Srinagar- Baramulla New BG Railway Line Project
|
09.09.11
|
14.09.11
|
17.10.2011 up to 15.30 hrs. Changed to 02.11.2011 up to 15.30 hrs.
|
17.10.2011 at 15.30 hrs. Changed to 02.11.2011 at 15.30 hrs.
|
INR 26 lacs
|
|
|
IRCON/1014/J&K-DQ/ Equip. Room S-Portal-T-80/OB-7
|
“J&K Rail Link Project – Dharam – Qazigund Section. Construction of one Equipment Room at South Portal of Pir Panjal tunnel (T-80) on USBRL project (J&K) (Package OB-7)”
|
27.06.11
|
04.07.11
|
25.07.2011 up to 15.00 hrs.
|
25.07.2011 at 15.30 hrs.
|
219000
|
|
|
IRCON/1014/J&K-DQ/ Equip. Room S-Portal-T-80/OB-7R
|
“J&K Rail Link Project – Dharam – Qazigund Section. Construction of one Equipment Room at South Portal of Pir Panjal tunnel (T-80) on USBRL project (J&K) (Package OB-7R)”
|
29.08.11
|
06.09.11
|
20.09.2011 up to 15.00 hrs.
|
20.09.2011 at 15.30 hrs.
|
219000
|
|
|
IRCON/1014/J&K-DQ/ Est. Sangaldan Camp/OB-6
|
J&K Rail Link Project – Dharam – Qazigund Section. Providing Design, Drawings, and Construction of prefabricated houses, roads and landscape development works for IRCON/NR Camp Office Complex including water supply, drainage, sanitary, internal electrical and related external electrification works and other allied works/facilities at Sangaldan of Udhampur – Srinagar – Baramulla Rail Line Project (Package OB-6)
|
22.06.11
|
01.07.11
|
26.07.2011 up to 15.00 hrs.
|
26.07.2011 at 15.30 hrs.
|
538000
|
|
|
IRCON/1014/J&K-DQ/ GT/ Zone- II&III /14/ 164
|
Geotechnical investigation including drilling of boreholes up-to maximum 300 mtr. depth, testing of samples (Lab tests), in-situ testing comprising Hydro-fracture (stress orientation Impression), BHTV (Borehole tele-viewer) & Dilatometer testing in different Boreholes of Tunnels, Station Yard, Bridges between Higni (Km. 120) to Arpinchala (Km. 125) in connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project (Package TI-5)
|
23.01.12
|
23.01.12
|
15.02.2012 up to 15.00 hrs.
|
15.02.2012 at 15.30 hrs.
|
311000
|
|
|
IRCON/1014/J&K-DQ/ GT/ Zone-II /14/162/
|
Geotechnical investigation including drilling of Boreholes upto maximum 400 mtr. depth, testing of samples (Lab tests), in-situ testing comprising Hydro-fracture (stress orientation Impression), BHTV (Borehole tele-viewer) & Dilatometer testing in different Boreholes of Tunnels, Station Yard, Bridges between Sumber (Km. 110) to Higni (Km. 120) in connection with Construction of Dharam-Qazigund Section of J&K Rail Link Project(PAKAGE-TI-3)
|
10.08.11
|
10.08.11
|
02.09.2011 up to 15.00 hrs.
|
02.09.2011 at 15.30 hrs.
|
Rs. 4.55 Lacs
|
|
|
IRCON/1014/J&K-DQ/ Hiring Vehicle-Jammu/VH-02
|
J&K Rail Link Project – Dharam – Qazigund Section. Hiring of vehicles for IRCON Officers & Staff for USBRL Project Work, Jammu (Package VH-02)
|
07.06.11
|
10.06.11
|
05.07.2011 up to 15.00 hrs.
|
05.07.2011 at 15.30 hrs.
|
14000
|
|
|
IRCON/1014/J&K-DQ/ PF, PFS & FOB-Banihal/PF-1
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of Platforms, Platform Shelters, Water booths, Foot-over Bridge and other miscellaneous works at Banihal Station (Package PF-1)
|
23.11.10
|
01.12.10
|
22.12.2010 up to 15.00 hrs.
|
22.12.2010 at 15.30 hrs.
|
455000
|
|
|
IRCON/1014/J&K-DQ/ POT-PTFE /45.7M O.W.G./BR-9
|
J&K Rail Link Project – Dharam – Qazigund
Section. Manufacturing & Supplying of POT/POT-PTFE Bearings for
47.5m span open web Girder including Packing plates, etc., complete as
per BOQ and approved drawings including loading, Transportation,
Stacking and unloading at Consignee Depot / IRCON’s Godown at Banihal
(Package BR-9)
|
17.12.10
|
21.12.10
|
12.01.2011 up to 15.00 hrs.
|
12.01.2011 at 15.30 hrs.
|
20000
|
|
|
IRCON/1014/J&K-DQ/ RCC OHT Tank-Banihal/OHT-1R
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of balance works of RCC Overhead Water Tank at Banihal station yard (Package OHT-1R).
|
07.09.10
|
10.09.10
|
04.01.2011 up to 15.00 hrs. Changed to 18.02.2011 up to 15.00 hrs. Changed to 16.03.2011 up to 15.00 hrs. Changed to 06.04.2011 up to 15.00 hrs.
|
04.01.2011 at 15.30 hrs. Changed to 18.02.2011 at 15.30 hrs. Changed to 16.03.2011 at 15.30 hrs. Changed to 06.04.2011 at 15.30 hrs.
|
128000
|
|
|
IRCON/1014/J&K-DQ/ T-74R/185
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of Tunnel T-74R (between Km 125 & 134) on Dharam-Qazigund Section of Udhampur-Srinagar-Baramulla New BG Railway Line Project (Package T-74R).
|
10.02.11
|
15.02.11
|
22.03.2011 up to 15.30 hrs. Changed to 21.04.2011 up to 15.30 hrs.
|
22.03.2011 at 15.30 hrs. Changed to 21.04.2011 at 15.30 hrs.
|
38300000
|
|
|
IRCON/1014/J&K-DQ/ UG Drainage pipe jacking-Zone VI/ M-12
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of underground drainage system from collecting chambers to disposal points at various locations with pipe thrusting (trenchless pipe jacking-pipe pushing method) and laying of pipes (1200mm in diameter) in open excavation and other allied works in Zone VI (Package M-12)
|
23.05.11
|
01.06.11
|
22.06.2011 up to 15.00 hrs.
|
22.06.2011 at 15.30 hrs.
|
623000
|
|
|
IRCON/1014/J&K-DQ/ UG Drainage pipe jacking-Zone VI/ M-12R
|
“J&K Rail Link Project – Dharam – Qazigund Section. Construction of underground drainage system from collecting chambers to disposal points at various locations with pipe thrusting (trenchless pipe jacking-pipe pushing method) and laying of pipes (1200mm in diameter) in open excavation and other allied works in Zone VI (Package M-12R)”
|
29.06.11
|
04.07.11
|
29.07.2011 up to 15.00 hrs.
|
29.07.2011 at 15.30 hrs.
|
623000
|
|
|
IRCON/1014/J&K-DQ/ Utility Services-Banihal/M-10R
|
J&K Rail Link Project – Dharam – Qazigund Section. Providing Utilities services for Office upkeep, various Office /Field Technical Assistance, Cleaning, etc. Maintenance of Offices and IRCON's residential Camps & Site Offices at various locations (Package M-10R)
|
04.05.11
|
06.05.11
|
19.05.2011 up to 15.00 hrs. Changed to 07.06.2011 up to 15.00 hrs.
|
19.05.2011 at 15.30 hrs. Changed to 07.06.2011 at 15.30 hrs.
|
96000
|
|
|
IRCON/1014/J&K-DQ/ Utility Services-Banihal/M-10R-1
|
J&K Rail Link Project – Dharam – Qazigund Section. Providing Utilities services for Office upkeep, various Office /Field Technical Assistance, Cleaning, etc. Maintenance of Offices and IRCON's residential Camps & Site Offices at various locations (Package M-10R-1)
|
01.06.11
|
06.06.11
|
20.06.2011 up to 15.00 hrs.
|
20.06.2011 at 15.30 hrs.
|
96000
|
|
|
IRCON/1014/J&K-DQ/ Vehicles Hiring-Banihal/VH-01
|
J&K Rail Link Project – Dharam – Qazigund
Section. Hiring of vehicles for IRCON and N. Railway - Officers & Staff for
Project work
|
21.12.10
|
23.12.10
|
14.01.2011 up to 15.00 hrs.
|
14.01.2011 at 15.30 hrs.
|
295000
|
|
|
IRCON/1014/J&K-DQ/ Washing_Apron-Banihal/M-13
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of Washable Apron for platform and other allied works at Banihal Yard on USBRL Project (Package M-13)
|
30.05.11
|
06.06.11
|
23.06.2011 up to 15.00 hrs.
|
23.06.2011 at 15.30 hrs.
|
206000
|
|
|
IRCON/1014/J&K-DQ// Km 149.76-149.83, 150.02-150.375, S.Passg./ BR-8
|
J&K Rail Link Project – Dharam – Qazigund Section. Construction of Cut & Cover with provision of RCC Box at Km 149/760 to Km 149/ 830) & Km 150/020 to Km 150/375 including Super Passage and other miscellaneous works (Package BR-8).
|
09.12.10
|
13.12.10
|
05.01.2011 up to 15.00 hrs.
|
05.01.2011 at 15.30 hrs.
|
1109000
|
|
|
IRCON/1014/J&K-DQ/14/156/T-74R/Instrumentation, Dated 23-5-11
|
Supply,Installation and Monitoring of instrumentation work during the construction of Tunnel T-74R & Tunnel T-77B,C in Zone-IVA&IV in Dharam-Quazigund Section of Udhampur-Srinager-Baramulla New BG Railway line Project.
|
23.05.11
|
27.05.11
|
20.06.2011 up to 15.00 hrs.
|
20.06.2011 at 15.30 hrs.
|
2,84,000/-
|
|
|
IRCON/1014/J&K-DQ/BLT-1/ 181
|
Design of Broad Gauge Ballastless Track and Construction of Ballastless Track (Approx. 11.3KM) in Tunnel T-80 across Pir Panjal Range between Banihal – Quazigund Section of Udhampur- Srinagar- Baramula Rail Link Project (USBRL Project)
|
04.04.11
|
15.04.11
|
20.05.2011 up to 15.30 hrs. Changed to 03.06.2011 up to 15.30 hrs. Changed to 17.06.2011 up to 15.30 hrs. Changed to 08.07.2011 up to 15.30 hrs. Changed to 25.07.2011 up to 15.30 hrs.
|
20.05.2011 at 15.30 hrs. Changed to 03.06.2011 at 15.30 hrs. Changed to 17.06.2011 at 15.30 hrs. Changed to 08.07.2011 at 15.30 hrs. Changed to 25.07.2011 at 15.30 hrs.
|
25,00,000
|
|
|
IRCON/1014/J&K-DQ/Bridge/Pkg-10
|
Fabrication and Supply of Steel Girders (Composite Type) for Super Structures of Bridge No: 139 & 145B for USBRL Project.
|
18.05.11
|
23.05.11
|
24.06.2011 up to 15:30 hrs.
|
24.06.2011 up to 15:30 hrs.
|
3,50,000
|
|
|
IRCON/1014/J&K-DQ/Electrification - Banihal/IE-II/
|
J&K Rail Link Project – Dharam – Qazigund Section: Internal & External Electrification works of Senior Subordinate Office complex (SSOC), Community Hall, Railway Station Building, 80-bedded RPF Barrack, GRP Office, P.F lighting and Yard lighting at Banihal Railway Station. (Package – IE-II).
|
23.11.10
|
24.11.10
|
14.12.2010 up to 15.00 hrs.
|
14.12.2010 at 15.30 hrs.
|
298000
|
|
|
IRCON/1014/J&K-DQ/Khari-Kundan-Khora Acc.Rd./Zone-III/M-9/
|
“J&K Rail Link
Project – Dharam – Qazigund Section. Protection and Upgradation
works of existing Khari – Kundan Access Road originating from
Nachalana Khari road and Construction of Kundan-Khora road up to
T-51P2 & T-52P1 at Khari and Sub-structures for the Bridges across
Mohumangat and Kote Nalas at Khari village and other miscellaneous
works (Package M-9).
|
11.12.10
|
20.12.10
|
06.01.2011 up to 15.00 hrs.
|
06.01.2011 at 15.30 hrs.
|
692000
|
|
|
IRCON/1014/J&K-DQ/Pedest. FOB-Zone-VI/FOB-2
|
“Construction of One Foot-Over- Bridge for pedestrians crossing at Km 164/820 in Zone-VI, Distt. Anantnag, on Dharam–Qazigund Section of USBRL Project (J&K) (Package FOB-2)”
|
07.07.11
|
11.07.11
|
28.07.2011 up to 15.00 hrs.
|
28.07.2011 at 15.30 hrs.
|
144000
|
|
|
IRCON/1014/J&K-DQ/S&T/ Epabx _System
|
- Supply, Installation, Testing and Commissioning of 300 Ports EPABX System at station Banihal on Dharam –Qazigund J&K Rail Link Project
|
11.01.11
|
11.01.11
|
01.02.2011 up to 15.00 hrs.
|
01.02.2011 at 15.30 hrs.
|
39000
|
|
|
IRCON/1014/J&K-DQ/S&T/ Telecom
|
J&K Rail Link Project – Dharam – Qazigund Section for “System Design, Supply, Installation, Testing and Commissioning of STM-1 systems & Digital Primary Mux’s, Control /Emergency Communications Systems, Power Supply Systems & OFC Indoor & Outdoor Telecom work at Banihal Station
|
10.06.11
|
11.06.11
|
05.07.2011 up to 15.00 hrs.
|
05.07.2011 at 15.30 hrs.
|
216000
|
|
|
IRCON/1014/J&K-DQ/S&T/ Telecom Dated: 29.11.2011
|
Dharam – Qazigund Section in connection with “Design, Manufacture, Supply, Installation, Testing and Commissioning of complete Telecommunication System consisting Emergency Call & Service Telephone, CCTV, Tunnel Radio & PA System in Tunnel T-80”.
|
29.11.11
|
05.12.11
|
10.01.2012 up to 15.00 hrs. Changed to 17.01.2012 up to 15.00 hrs. Changed to 24.01.2012 up to 15.00 hrs.
|
10.01.2012 at 15.30 hrs. Changed to 17.01.2012 at 15.30 hrs. Changed to 24.01.2012 at 15.30 hrs.
|
19.10 Lacs
|
|
|
IRCON/1014/J&K-DQ/S&T//LSZHCables/02 Date:02.03.2012
|
Supply of Armoured,
Underground, 24 Fiber
Monomode Optical Fiber
Cable as per RDSO Spec.no. IRS: TC: 55-2006 Rev. 1 with Amendment No.1.1 or latest with add on specifications regarding outer
sheathing conforming to International standards ISO 4589-2-1999 OR LATEST & NFPA 270 to cater for Low Smoke Zero Halogen features at Banihal Station on Dharam-Qazigund New BG Rail Line Project.
|
02.03.12
|
03.03.12
|
23.03.2012 up to 15.00 hrs.
|
23.03.2012 at 15.30 hrs.
|
Rs. 39,000/-
|
|
|
IRCON/1014/J&K-DQ/S&T/Epabx System Dt. 15.02.11
|
J&K Rail Link Project – “Supply, Installation, Testing and Commissioning of 300 Ports EPABX System at station Banihal on Dharam – Qazigund J&K Rail Link Project
|
15.02.11
|
15.02.11
|
08.03.2011 up to 15.00 hrs.
|
08.03.2011 at 15.30 hrs.
|
39000
|
|
|
IRCON/1014/J&K-DQ/S&T/Outdoor Signalling Dated: 25.05.2011
|
Supply, Installation, Testing and Commissioning of Outdoor Signalling gears (in connection with Electronic Interlocking) at Banihal Station on Dharam-Qazigund New BG Rail Line Project.
|
25.05.11
|
25.05.11
|
15.06.2011 up to 15.00 hrs.
|
15.06.2011 at 15.30 hrs.
|
Rs 2.05 Lacs
|
|
|
IRCON/1014/J&K-DQ/S&T/Signalling Cables /S-02
|
J&K Rail Link Project – Dharam – Qazigund Section for “Supply of PVC Insulated Armoured, Unscreened, Underground Power Cable 2 Core x 25 Sq. mm Aluminium Conductor as per RDSO Spec. no. IRS: S-63/2007 (Amd.-2) & IS: 1554 (Part-1) or latest at Banihal Station
|
31.10.11
|
31.10.11
|
22.11.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs.
|
8000
|
|
|
IRCON/1014/J&K-DQ/S&T/Signalling Cables/S-01
|
J&K Rail Link Project – Dharam – Qazigund Section for “Supply of PVC Insulated Armoured, Unscreened, Underground Railway Signalling Cables, 12 Core x 1.5 Sq. mm & 2 Core X 2.5 Sq. mm Copper Conductor as per RDSO Spec. no. IRS: S-63/2007 (Amd.-2) or latest at Banihal Station
|
31.10.11
|
31.10.11
|
22.11.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs.
|
68000
|
|
|
IRCON/1014/J&K-DQ/S&T/SSI Dated: 16.05.2011
|
Design, Manufacture, Supply, Installation, Testing and Commissioning of Solid State Interlocking System (Indoor Equipment), Integrated Power Supply System, Datalogger System, Block Instrument, BPAC, SSDAC (Track Circuit), Earth Leakage Detector Etc. at Banihal Station
|
16.05.11
|
16.05.11
|
07.06.2011 up to 15.00 hrs. Changed to 28.06.2011 up to 15.00 hrs.
|
07.06.2011 at 15.30 hrs. Changed to 28.06.2011 at 15.30 hrs.
|
Rs 2.59 Lakhs
|
|
|
IRCON/1014/J&K-DQ/S&T/Telecom Cables/T-01
|
J&K Rail Link Project – Dharam – Qazigund Section for “Supply of Armoured, Underground, 24 Fibre Monomode Optical Fibre Cable as per RDSO Spec. no. IRS: TC: 55-2006 Rev. 1 with Amendment No.1.1 or latest at Banihal Station
|
31.10.11
|
31.10.11
|
22.11.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs.
|
26000
|
|
|
IRCON/1014/J&K-DQ/S&T/Telecom Cables/T-02 Date: 29.12.2011
|
Supply of Underground Railway Jelly Filled 4 Quad Cables 0.9 mm dia Copper Conductor as per RDSO Spec. no. IRS: TC-30/2005 (Ver.-1) with Amd. No. 4 or latest & 6 Quad Cables 1.4 mm dia Copper Conductor as per RDSO Spec. No. RDSO/SPN/TC 72/2007 with Amd. No. 1 or latest at Banihal Station on Dharam-Qazigund New BG Rail Line Project.
|
29.12.11
|
29.12.11
|
20.01.2012 up to 15.00 hrs.
|
20.01.2012 at 15.30 hrs.
|
2.03 lacs
|
|
|
IRCON/1014/J&K-DQ/Utility Services-Banihal/M-10/
|
J&K Rail Link Project – Dharam – Qazigund Section. Providing utility services for office upkeep, various offices /fields’ technical assistance, cleaning, sanitation, etc. Maintenance of offices and IRCON’s residential /site camps / offices at various locations. (Package M-10)
|
11.04.11
|
14.04.11
|
03.05.2011 up to 15.00 hrs.
|
03.05.2011 at 15.30 hrs.
|
96000
|
|
|
IRCON/1020/NHAI/UP-05/NIT/182
|
Suppu of Suitable Backfilling/Selected Soil for Backfilling in RE Wall Work at VC-1 approaches Km 175+811 at Pirona.
|
31.03.11
|
01.04.11
|
15.04.2011 up to 15.00 hrs.
|
15.04.2011 at 15.30 hrs.
|
Rs 71,000
|
|
|
IRCON/1020/NHAI/UP-05/NIT/185
|
Construction of balance works of Pirona Canal Br.No-174/3 and Rath Road grade Seperator Bridge No.210/1 on NH-25.
|
06.06.11
|
07.06.11
|
21.06.2011 up to 15.00 hrs.
|
21.06.2011 at 15.30 hrs.
|
38,000/-
|
|
|
IRCON/1029/RCF-RBL/S&T/01
|
Provision of Railway Telephones and execution of associated works such as open trenching & HDD, supply & laying of telecom cables, supply & installation of Location Boxes and PORTA Hut etc. in Rail Coach Factory, Lalganj, Raebareli.
|
17.03.11
|
06.04.11
|
07.04.2011 up to 15.00 hrs.
|
07.04.2011 at 15.30 hrs.
|
13000.00
|
|
|
IRCON/1029/RCF-RBL/Tender (Risk and Cost) /C&R/11/3/OT/01 Dt. 15.02.2011
|
“BALANCE WORK OF CONSTRUCTION OF RCC BOX CULVERTS AND CEMENT CONCRETE ROADS WITH RELATED WORKS AT RAIL COACH FACTORY, RAEBARELI AT LALGANJ (Risk and Cost)”
|
16.02.11
|
08.03.11
|
09.03.2011 up to 15.00 hrs.
|
09.03.2011 at 15.30 hrs.
|
394000
|
|
|
IRCON/2034/ROB- Bihar/Tender/2011/04
|
Tender for execution of 40mm thick wearing course including fixing of impregnated aggregate with Mastic asphalt at LC-33B at Dehri-on-sone and LC-43B at Sasaram in the state of Bihar .
|
18.02.11
|
18.02.11
|
11.03.2011 up to 15.00 hrs.
|
11.03.2011 at 15.30 hrs.
|
Rs.48,000/-
|
|
|
IRCON/2034/ROB-BIHAR/TENDER/2011/01
|
Supply, fabrication, assembly , erection and painting of steel girder in Railway portion in connection to Construction of ROB at LC-102 between Jeeradei – Mairaw station, at LC No.23B ( Khagaria)and at LC-53A( Bihia)in state of Bihar.
|
16.01.11
|
17.01.11
|
10.02.2011 up to 15.00 hrs.
|
10.02.2011 at 15.30 hrs.
|
Rs.10,000/-
|
|
|
IRCON/2034/ROB-BIHAR/TENDER/2011/08 DATED 05-04-2011
|
Risk and Cost Tender for providing and installation of Mastic Asphalt bridge deck waterprofing membrane 25mm thick at LC-79, Mithapur, Patna in the state of Bihar
|
06.04.11
|
06.04.11
|
27.04.2011 up to 15.00 hrs.
|
27.04.2011 at 15.30 hrs.
|
Rs.15,500/-
|
|
|
IRCON/2036/TSTPS/TENDER/BALLAST/03/11 Dtd: 26.12.2011
|
Supply and Stacking of machine crushed 65mm gauge hard and durable stone ballast along the alignment on the cess/toe of the bank or at the designated place nearer to site as per specifications for the construction of additional railway track (about 3.5Km length) line (Rail track) for coal transportation from Kaniha mines to TSTPP, joining at KM: 5/483 (old) KM: 0/000 (New) of present Rly. Track of NTPC.
|
26.12.11
|
29.12.11
|
20.01.2012 up to 15:00 hrs.
|
20.01.2012 up to 15:30 hrs.
|
Rs. 64,220.00
|
|
|
IRCON/2036/TSTPS/TENDER/PSC Sleeper /04/11 Dtd: 04.01.2012
|
Manufacture, Supply & Stacking of 60 Kg prestressed monoblock concrete Sleeper (pre-Tension type) for Broad Gauge, 60 Kg Special PSC sleepers for level crossing, 60 Kg PSC Sleepers for 1 in 8½ Points & Crossings, 60 Kg PSC Sleepers for 1 in 12 Points & Crossings, 60 Kg PSC Sleepers for Derailing switches to suit to 52 kg rails as per latest RDSO drawings & specifications for constructions of additional Rly Track (About 3.5 KM long length) from Kaniha Mines to Talcher Super Thermal Power Station
|
04.01.12
|
04.01.12
|
27.01.2012 up to 15.00 hrs.
|
27.01.2012 at 15.30 hrs.
|
Rs. 76,050.00
|
|
|
IRCON/2040/NHAI.WB-7/Tender-Disposal of Scrap/1067
|
DISPOSAL OF OLD / USED STEEL SCRAP, SHUTTERING PLATES; SCAFFOLDING MATERIALS ETC. (ON AS IS WHERE IS BASIS)
|
19.07.11
|
06.08.11
|
08.08.2011 up to 15.00 hrs.
|
08.08.2011 at 15.30 hrs.
|
10% (Ten percent) of value of each quoted item
|
|
|
IRCON/2040/NHAI.WB-7/Tender/Flexible Pavement/ 1065
|
Construction of Flexible pavement (Bituminous Pavement) comprising of BM, DBM, BC and SDBC and road kerb & road marking between Km. 519.870 to Km.522.433 of NH-31
|
08.04.11
|
08.04.11
|
28.04.2011 up to 15.00 hrs.
|
28.04.2011 at 15.30 hrs.
|
1,45,000.00
|
|
|
IRCON/2048/ISC-BEHALA/TENDER/ROOF/05/11
|
Architectural Design & Drawings, Structural Design & Drawings and Construction of Space Frame / Truss for Roof and its sheeting ; Supply, Fabrication, Delivery, Hoisting & Fixing of suitable Space Frame / Truss arrangement for roof along with fixing Roof Sheeting for the roof of Indoor Stadium and Cricket Gallery for New Sports Complex at Gholsapur (Behala), Kolkata.
|
10.11.11
|
11.11.11
|
14.12.2011 up to 15.00 hrs.
|
14.12.2011 at 15.30 hrs.
|
Rs. 1.75 Lacs
|
|
|
IRCON/2049/ROB- II-Bihar/Tender/2011/02 Dated: 01/02/2011
|
Supply, fabrication, assembly , erection and painting of steel girder in Railway portion in connection to Construction of ROB at LC-102 between Jeeradei – Mairaw station, at LC No.23B ( Khagaria) and at LC-53A(Bihia)in state of Bihar .
|
01.02.11
|
02.02.11
|
23.02.2011 up to 15.00 hrs.
|
23.02.2011 at 15.30 hrs.
|
Rs.3,50,000/-
|
|
|
IRCON/2049/ROB-II-BIHAR/TENDER/2011/23
|
Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC-53 A at Km 613/19-21 between section Bihiya and Kauria , Bihar.
|
31.10.11
|
03.11.11
|
24.11.2011 up to 15.00 hrs.
|
24.11.2011 at 15.30 hrs.
|
Rs.10.00 Lacs
|
|
|
IRCON/2049/ROB-II-BIHAR/TENDER/2011/25
|
Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC-47 B at Km 163/7-8 between section Begusarai and Tilrath , Bihar
|
14.11.11
|
16.11.11
|
07.12.2011 up to 15.00 hrs.
|
07.12.2011 at 15.30 hrs.
|
Rs. 10.00 Lacs
|
|
|
IRCON/2049/ROB-II-BIHAR/TENDER/2011/26
|
Construction of Road over Bridge both railway span and adjacent approaches span including Reinforced Earth wall/ Retaining wall in lieu of LC-31 at Km 261/4-5 between section Narkatiagunj and Harinagar, Bihar
|
19.11.11
|
19.11.11
|
13.12.2011 up to 15.00 hrs.
|
13.12.2011 at 15.30 hrs.
|
Rs.10.00 Lakhs
|
|
|
IRCON/2051/JBNRL/DESIGN & DRAWING/01
|
Architectural and Structural design, and Other consultancy Services Related to the Construction of Station Building, Staff Quarters, Guest House, OH Water Tank, miscellaneous structures including detailing for electrical works etc. and any other items required to complete the above works in connection “Construction of New Broad Gauge Railway Line From Jogbani (India) To Biratnagar (Nepal) Km.0.000 to Km.18.601”
|
15.11.11
|
21.11.11
|
14.12.2011 up to 15.00 hrs.
|
14.12.2011 at 15.30 hrs.
|
10000.00
|
|
|
IRCON/2051/JBNRL/Tender-Shifting of Elec. Poles/01
|
Relocation of existing Railway Electric pole and HT/LT Line as well as Bihar State Electricity Board’s Electric poles and HT/LT Line from Railway land within 2.7 Km. length from Bathnaha Railway Station towards Jogbani in Araria Dist., Bihar.
|
17.04.11
|
20.04.11
|
09.05.2011 up to 15.00 hrs.
|
09.05.2011 at 15.30 hrs.
|
15,000/-
|
|
|
IRCON/3014/RRVUNL.RS/RETENDER/Buildings/
|
Design and Construction of various type of Buildings, Electrical works within the buildings and other related works in connection with Railway siding work of Kalisindh Thermal Power Project of RRVUNL
|
23.07.11
|
23.07.11
|
17.08.2011 up to 15.00 hrs.
|
17.08.2011 at 15.30 hrs.
|
Rs. 83,700.00
|
|
|
IRCON/3014/RRVUNL.RS/TENDER/Bridge/Balance work/
|
Design and Construction of Major and Minor Bridges along the alignment of Railway Track from proposed Jhalawar station to Kalisindh Thermal Power plant in connection with Railway siding work of Kalisindh Thermal Power Project of RRVUNL - Balance Work.
|
09.01.12
|
10.01.12
|
30.01.2012 up to 15.00 hrs.
|
30.01.2012 at 15.30 hrs.
|
500000
|
|
|
IRCON/3014/RRVUNL.RS/TENDER/Buildings/
|
Design and Construction of various type of Buildings, Electrical works within the buildings and other related works in connection with Railway siding work of Kalisindh Thermal Power Project of RRVUNL
|
09.05.11
|
09.05.11
|
02.06.2011 up to 15.00 hrs. Changed to 09.06.2011 up to 15.00 hrs.
|
02.06.2011 at 15.30 hrs. Changed to 09.06.2011 at 15.30 hrs.
|
83,700/-
|
|
|
IRCON/3014/RRVUNL.RS/TENDER/Yard Buildings/
|
Design and Construction of Yard Buildings, Electrical works within the buildings and other related works in connection with Railway siding work of Kalisindh Thermal Power Project of RRVUNL
|
02.12.11
|
02.12.11
|
23.12.2011 up to 15.00 hrs.
|
23.12.2011 at 15.30 hrs.
|
91500
|
|
|
IRCON/3015/TN/ROB-KOTA-Foundation/11/5
|
Carrying out pile foundation, bored cast-in-situ RCC piles of 1.2 meter dia, using pilling rig for execution of via-duct spans of road over bridge of kota in lieu of LC No. 108, including load testing of piles as per codal provisions.
|
02.08.11
|
08.08.11
|
19.08.2011 up to 15.00 hrs.
|
19.08.2011 at 15.30 hrs.
|
150000
|
|
|
IRCON/3015/TN/ROB-RAJ/BIKANER/11/06 DATED 11.08.2011
|
Construction of Road Over Bridge (ROB) and its approaches as per Specifications, Drawings & Design, Maintaining all Quality Control Standards complete at Km 322.30 at LC No.139 on Lalgarh Bikaner Section of NW Railways Near Chokhunthi on Old Gajner Road at Bikaner in Rajasthan State.
|
11.08.11
|
18.08.11
|
05.09.2011 up to 15.00 hrs.
|
05.09.2011 at 15.30 hrs.
|
10,00,000.00
|
|
|
IRCON/3015/TN/ROB-RAJ/Bikaner/11/6
|
Construction of Road over Bridge (ROB) as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete at Km. 322.30 at LC no. 139 on Lalgarh Bikaner Section of NW Railways near Chokhunthi on Old Gajner Road at Bikaner in Rajasthan State
|
11.08.11
|
18.08.11
|
05.09.2011 up to 15.00 hrs. Changed to 12.09.2011 up to 15.00 hrs.
|
05.09.2011 at 15.30 hrs. Changed to 12.09.2011 at 15.30 hrs.
|
10.00 lacs
|
|
|
IRCON/3015/TN/ROB-RAJ/CHITTORGARH/11/07, DT. 11.08.2011
|
Construction of Road Over Bridge (ROB)& its approaches as per specifications, Drawing & Design, Maintaining all quality control standard complete at KM 184/13-14 at LC no.88 B on Chittorgarh Udaipur section of Western Railways near Khumbha Nagar at Chittorgarh in Rajasthan State.
|
11.08.11
|
28.08.11
|
05.09.2011 up to 15.00 hrs.
|
05.09.2011 at 15.30 hrs.
|
5,00,000
|
|
|
IRCON/3015/TN/ROB-RAJ/Chittorgarh/11/7
|
“Construction of Road over Bridge (ROB) as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete at Km. 184/13-14 on LC no. 88-B, in Chittor Udaipur Section of Western Railway near Kumbha Nagar at Chittorgarh in Rajasthan State
|
11.08.11
|
18.08.11
|
05.09.2011 up to 15:00 hrs. Changed to 12.09.2011 up to 15.00 hrs.
|
05.09.2011 up to 15:30 hrs. Changed to 12.09.2011 at 15.30 hrs.
|
5.00 lacs
|
|
|
IRCON/3015/TN/ROB-RAJ/HINDAUN/11/13 Date: 10.11.2011
|
“Construction of Road over Bridge (ROB) & it’s approaches as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete, in Lieu of LC No. 201-B at Railway Km 136/9-10, in Hindaun Town in Rajasthan state” ( Package– HND 201/01)
|
10.11.11
|
21.11.11
|
05.12.2011 up to 15.00 hrs. Changed to 12.12.2011 up to 15.00 hrs.
|
05.12.2011 at 15.30 hrs. Changed to 12.12.2011 at 15.30 hrs.
|
10,00,000
|
|
|
IRCON/3015/TN/ROB-RAJ/HINDAUN/12/17 Date: 28.01.2012
|
“Construction of Road over Bridge (ROB) along with it’s approaches, service road & diversion Road as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete, in Lieu of LC No. 201-B at Railway Km 136/9-10, in Hindaun City in Rajasthan state” ( Package– HND 201/03)
|
28.01.12
|
31.01.12
|
21.02.2012 up to 15.00 hrs.
|
21.02.2012 at 15.30 hrs.
|
10,00,000
|
|
|
IRCON/3015/TN/ROB-RAJ/JDPR-RUB-71B-KPR/12/15, DT. 04.01.2012
|
Construction of Two Lane Road Under Bridge (RUB) by Cut & Cover Technique comprising Two Boxes of approximate opening size of 5.75 x 3.60 m each along with it's approaches, Design of box & box segmetns, Casting & placing arrangement complete near existing underpass bridge 71 B at Khatarnak Puliya on Jodhpur Pali Section of NW Railways, near DRM Office, Jodhpur in Rajasthan State.
|
04.01.12
|
06.01.12
|
25.01.2012 up to 15.00 hrs.
|
25.01.2012 at 15.30 hrs.
|
500000
|
|
|
IRCON/3015/TN/ROB-RAJ/JDPR-RUB-71B/11/08
|
Construction of Four lane Road under Bridge (RUB) by Box pushing technique comprising twin box of opening size 1x 10.0 x 3.65 m each with it’s approaches, alongwith design of box, box pushing arrangement, Thrust Bed, pushing scheme and drainage plan etc. complete, as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete near bridge 71B at Khatarnak Puliya on Jodhpur Pali Section of NW Railways, near DRM Office, Jodhpur in Rajasthan State.
|
26.08.11
|
06.09.11
|
23.09.2011 up to 15.00 hrs. Changed to 10.10.2011 up to 15.00 hrs. Changed to 02.11.2011 up to 15.00 hrs. Changed to 23.11.2011 up to 15.00 hrs. Changed to 14.12.2011 up to 15.00 hrs. Changed to 2
|
23.09.2011 at 15.30 hrs. Changed to 10.10.2011 at 15.30 hrs. Changed to 02.11.2011 at 15.30 hrs. Changed to 23.11.2011 at 15.30 hrs. Changed to 14.12.2011 at 15.30 hrs. Changed to 29.12.2011 at 15.30
|
500000
|
|
|
IRCON/3015/TN/ROB-RAJ/SGUR/11/12 dated 01.11.2011
|
Carrying out consultancy work for Road Over Bridge Including detail design, estimate, BOQ working drawing as desired in scope of work for ROB at LC No.C-95 at Suratgarh, Rajasthan
|
01.11.11
|
11.11.11
|
22.11.2011 up to 15.00 hrs. Changed to 28.11.2011 up to 15.00 hrs. Changed to 14.12.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs. Changed to 28.11.2011 at 15.30 hrs. Changed to 14.12.2011 at 15.30 hrs.
|
15000
|
|
|
IRCON/3015/TN/ROB/RAJ/KOTA/11/11 Date: 16.09.2011
|
“Construction of Road over Bridge (ROB) & it’s approaches (Excluding pile foundation) as per Specifications, Drawing & Design, Maintaining all Quality Control Standards complete at LC No. 108-B at KM 918/1-2 at Kota in West Central Railway in Rajasthan State”
|
16.09.11
|
03.10.11
|
10.10.2011 up to 15.00 hrs.
|
10.10.2011 at 15.30 hrs.
|
1000000
|
|
|
IRCON/3015/TN/ROB/RAJ/KOTA/11/11 Dt. 16.09.2011
|
Construction of Road Over Bridge (ROB) & its approaches (exclluding pile foundation) as per specifications, drawing & design, Maintaining all quality control standard complete at LC No. 108-B at Km 918/1-2 at Kota in West Central Railways in Rajasthan State
|
16.09.11
|
26.09.11
|
10.10.2011 up to 15.00 hrs. Changed to 17.10.2011 up to 15.00 hrs.
|
10.10.2011 at 15.30 hrs. Changed to 17.10.2011 at 15.30 hrs.
|
Rs. 10,00,000.00
|
|
|
IRCON/9031/SLR.COL.MAT/TENDER/CTR/Ph-II/119 Pkg-B
|
Complete Track renewal works between Galle - Kalutara South on Colombo - Matara Coastal Railway Line in Sri Lanka
|
24.05.11
|
24.05.11
|
10.06.2011 up to 15.00 hrs. Changed to 16.06.2011 up to 15.00 hrs.
|
10.06.2011 at 15.30 hrs. Changed to 16.06.2011 at 15.30 hrs.
|
$ 4000/INR 1,81,000/-
|
|
|
IRCON/9031/SLR.COL.MAT/Tender/CTR/Ph-II/119 Pkg-C
|
Complete Track renewal works between Galle - Kalutara South on Colombo - Matara Coastal Railway Line in Sri Lanka
|
24.05.11
|
24.05.11
|
10.06.2011 up to 15.00 hrs. Changed to 16.06.2011 up to 15.00 hrs.
|
10.06.2011 at 15.30 hrs. Changed to 16.06.2011 at 15.30 hrs.
|
$ 4500/INR 2,03,600/-
|
|
|
IRCON/9031/SLR.COL.MAT/TENDER/CTR/Ph-II/119/Pkg-A
|
Complete Track renewal works between Galle - Kalutara South on COlombo - Matara Coastal Railway Line in Sri Lanka
|
24.05.11
|
24.05.11
|
10.06.2011 up to 15.00 hrs. Changed to 16.06.2011 up to 15.00 hrs.
|
10.06.2011 at 15.30 hrs. Changed to 16.06.2011 at 15.30 hrs.
|
$ 3100/INR 1,40,300/-
|
|
|
IRCON/9035/NORTH LINE/FP/2010/SLEEPERS( EXPORT)
|
TENDER DOCUMENT FOR MANUFACTURE, SUPPLY, TRANSPORTATION AND DELIVERY OF PRE-STRESSED MONO-BLOCK CONCRETE SLEEPERS ( PLAIN TRACK & SPECIAL SLEEPERS) SUITABLE FOR 60 KG RAIL SECTION
|
23.11.10
|
06.12.10
|
21.12.2010 up to 15.00 hrs.
|
21.12.2010 at 15.30 hrs.
|
2500000
|
|
|
IRCON/9035/SL/NL/ TENDER/2012/1/ERC/(RT)/PKG-4-A
|
Manufacture, Supply, Transportation and
Delivery of elastic rail clips –Mk-III as per
RDSO specification and RDSO Drg. No. T-
3701 ( latest correction ), duly galvanized as
per the tender technical specifications, CIF
Colombo Port in Sri Lanka on LINER OUT
terms, for the restoration of various railway
lines in Northern Province of Sri Lanka.
|
05.03.12
|
07.03.12
|
22.03.2012 up to 15.00 hrs.
|
22.03.2012 at 15.30 hrs.
|
Rs.4,15,000.00
|
|
|
IRCON/9035/SL/NL/TENDER/2011/PSC SLEEPER/PKG-3
|
Manufacture, Supply,
Transportation and Delivery of Pre-stressed mono-block concrete sleepers
( Main Line Track and special sleepers for level crossing, gauge widening and
bridge approaches ), suitable for Broad Gauge Railway Track (Gauge -1676
mm) with 60 kg rail section, for the contracts of restoration of various railway
lines in Northern Province of Sri Lanka
|
09.12.11
|
19.12.11
|
03.01.2012 up to 15.00 hrs. Changed to 10.01.2012 up to 15.00 hrs.
|
03.01.2012 at 15.30 hrs. Changed to 10.01.2012 at 15.30 hrs.
|
Rs.25,00,000
|
|
|
IRCON/9035/SL/NL/TENDER/2012/2/GFNL/(RT)/PKG- 5A
|
Manufacture, Supply, Transportation and
Delivery of GFN-66 Liner as per RDSO
specifications and RDSO drawing No.T-
3706 ( latest amendment ), CIF Colombo
Port in Sri Lanka on LINER OUT terms, for
the restoration of various railway lines in
Northern Province of Sri Lanka
|
07.03.12
|
09.03.12
|
26.03.2012 up to 15.00 hrs.
|
26.03.2012 at 15.30 hrs.
|
Rs.95,700.00
|
|
|
IRCON/9035/SL/NL/TENDER/2012/2/GRSP/(RT)/PKG- 6A, Dt. 19.03.2012
|
Manufacture, Supply, Transportation and Delivery of 6 mm thick grooved rubber sole plates (GRSP) as per RDSO Drg No. T- 3711 ( latest amendment ), CIF Colombo Port in Sri Lanka on LINER OUT terms, for the restoration of various railway lines in Northern Province of Sri Lanka
|
19.03.12
|
20.03.12
|
04.04.2012 up to 15.00 hrs.
|
04.04.2012 at 15.30 hrs.
|
Rs. 62,500.00
|
|
|
IRCON/9035/SL/NL/TENDER/2012/2/SEJ SLPRS/PKG- 10, Dt. 16.04.2012
|
Manufacture, Supply, Transportation and Delivery of per-stressed mono-block concrete sleepers for switch expansion joints ( 80 mm gap ) suitable for broad gauge ( 1676 mm ) railway track with 60 kg rail section as per relevant RDSO drawing and specifications ( latest correction ), CIF Colombo Port in Sri Lanka on LINER OUT terms, for the restoration of various railway lines in Northern Province of Sri Lanka.
|
16.04.12
|
20.04.12
|
08.05.2012 up to 15.00 hrs.
|
08.05.2012 at 15.30 hrs.
|
Rs. 10,000.00
|
|
|
IRCON/9035/SL/NL/TENDER/2012/2/SEJ/PKG- 11, Dt. 02.04.2012
|
Manufacture, Supply, Transportation and
Delivery of Switch Expansion Joint ( 80 mm
gap ) for broad gauge ( 1676 mm ) railway
track with 60 kg rail section as per RDSO Drg.
No. 4165 and RDSO specification ( latest
correction ), including cost of rails and all
fittings, CIF Colombo Port in Sri Lanka on
LINER OUT terms, for the restoration of
various railway lines in Northern Province of
Sri Lanka.
|
02.04.12
|
10.04.12
|
24.04.2012 up to 15.00 hrs.
|
24.04.2012 at 15.30 hrs.
|
Rs. 60,000.00
|
|
|
IRCON/9035/SL/NL/TENDER/2012/BRIDGES /PKG-16
|
Construction Three major bridges, various types of box culverts and RCC Slab/Girder Bridges for the contracts for the restoration of various railway lines in Northern Province of Sri Lanka ( Medawachchiya- Madhu Road ,Madhu Road –Talai Mannar and Omanthai –Pallai ) under execution by IRCON
|
16.04.12
|
18.04.12
|
09.05.2012 up to 15.00 hrs. Changed to 16.05.2012 up to 15.00 hrs.
|
09.05.2012 at 15.30 hrs. Changed to 16.05.2012 at 15.30 hrs.
|
Rs. 10,00,000.00
|
|
|
IRCON/9038/ SLR.S&T/SIG.CABLES.PKG-VII/14
|
Supply of PVC, Insulated, Armoured, Unscreened, Underground Railway Signalling Cables of size 19x1.5 sq mm (Copper conductors) as per RDSO Specification no. IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railway from RDSO approved part-I vendors only. (Tender Document can be downloaded from 03.01.2012,10:00 hrs to
24.01.2012 upto 17:00 hrs)
|
02.01.12
|
03.01.12
|
25.01.2012 up to 15:00 hrs.
|
25.01.2012 up to 15:30 hrs.
|
US $ 800.00 or Rs 40,000.00
|
|
|
IRCON/9038/SLR.S&T /SIG.IPS.PKG-XIV/36
|
Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/SPN/165/2004 (Amd-5) or latest for 27 Stations of Sri Lanka Railways from RDSO approved part-I vendors only. (Tender Document can be downloaded from 28.02.2012 from 10:00 hrs to 12.03.2012 upto 14:30 hrs)
|
27.02.12
|
28.02.12
|
12.03.2012 up to 15.00 hrs.
|
12.03.2012 at 15.30 hrs.
|
US $ 2,900.00 or Rs 1,45,000.00
|
|
|
IRCON/9038/SLR.S&T/ OFC.CABLES.PKG-XII/20
|
Supply of 24 Fibre Armoured, Optic Fibre Cable as per RDSO specification No. IRS: TC-55-2006 Rev.1 with Amendment no. 1.1 or latest for Sri Lanka Railways from RDSO approved part-I vendors only. (Tender Document can be downloaded from 18.01.2012,10:00 hrs to 08.02.2012 upto 17:00 hrs)
|
18.01.12
|
18.01.12
|
09.02.2012 up to 15.00 hrs.
|
09.02.2012 at 15.30 hrs.
|
US $ 2,000.00 or Rs 1,00,000.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.CABLES.PKG-IX/16
|
Supply of
PVC, Insulated, Armoured, Unscreened, Underground Railway Signalling
Cables of size 6x1.5 sq mm (Copper conductors) as per RDSO specification no. IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railway from RDSO approved part-I vendors only. (Tender Document can be downloaded from 09.01.2012,10:00 hrs to
29.01.2012 upto 17:00 hrs)
|
05.01.12
|
09.01.12
|
30.01.2012 up to 15.00 hrs. changed to 03.02.2012 up to 15.00 hrs.
|
30.01.2012 at 15.30 hrs. changed to 03.02.2012 at 15.30 hrs.
|
US $ 150.00 or Rs 7,500.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.CABLES.PKG-VIII/15
|
Supply of
PVC, Insulated, Armoured, Unscreened, Underground Railway Signalling
Cables of size 12x1.5 sq mm (Copper conductors) as per RDSO
Specification no. IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railway from RDSO approved part-I vendors only. (Tender Document can be downloaded from 05.01.2012,10:00 hrs to
26.01.2012 upto 17:00 hrs)
|
05.01.12
|
05.01.12
|
27.01.2012 up to 15.00 hrs.
|
27.01.2012 at 15.30 hrs.
|
US $ 460.00 or Rs 23,000.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.CABLES.PKG-X/17
|
Supply of
PVC, Insulated, Armoured, Unscreened, Underground Railway Signalling
Cables of size 2x4 sq mm (Copper conductors) as per RDSO specification no. IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railway from RDSO approved part-I vendors only. (Tender Document can be downloaded from 10.01.2012,10:00 hrs to
30.01.2012 upto 17:00 hrs)
|
05.01.12
|
10.01.12
|
31.01.2012 up to 15.00 hrs.
|
31.01.2012 at 15.30 hrs.
|
US $ 130.00 or Rs 6,500.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.CABLES.PKG-XV/39
|
Supply of PVC, Insulated, Armoured, Unscreened, Underground Railway Signalling Cables of size 12x1.5 sq mm (Copper conductors) as per RDSO specification no. IRS: S-63/2007 (Amd-2) or latest for Sri Lanka Railways from RDSO approved part-I vendors. (Tender document can be downloaded from 26.03.2012,10:00 hrs to 09.04.2012 upto 14:30 hrs)
|
26.03.12
|
26.03.12
|
09.04.2012 up to 15.00 hrs.
|
09.04.2012 at 15.30 hrs.
|
US $ 1,010.00 or Rs 50,500.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.EPM.PKG-III/10
|
Supply of Electric Point Machines (Rotary locking Type) as Per RDSO Specification no. IRS: S-24/2002 (Amd-1) or latest for 27 Stations of Sri Lanka Railways from RDSO approved part-I vendors only. (Tender Document can be downloaded from 23.01.2012,10:00 hrs to 16.02.2012 upto 17:00 hrs)
|
21.01.12
|
23.01.12
|
17.02.2012 up to 15.00 hrs. Changed to 22.02.2012 up to 15.00 hrs.
|
17.02.2012 at 15.30 hrs. Changed to 22.02.2012 at 15.30 hrs.
|
US $ 2,500.00 or Rs 1,25,000.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.IPS.PKG-II/09
|
Supply of SMPS Based Integrated Power Supply System as per RDSO specification no. RDSO/SPN/165/2004 (Amd-5) or latest for 27 Stations of Sri Lanka Railwaysfrom RDSO approved part-I vendors only. (Tender Document can be downloaded from 23.01.2012,10:00 hrs to 13.02.2012 upto 17:00 hrs)
|
21.01.12
|
23.01.12
|
14.02.2012 up to 15.00 hrs. Changed to 23.02.2012 up to 15.00 hrs.
|
14.02.2012 at 15.30 hrs. Changed to 23.02.2012 at 15.30 hrs.
|
US $ 2,900.00 or Rs 1,45,000.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.WORKS.PKG-I/08
|
Design, Supply, Installation, Testing and Commissioning of Relay Based Panel Interlocking Signalling System at six stations (Anuradhapura, Mihintale, Parasangahawewa, Medawachchiya, Vavunia & Omanthai) of Sri Lanka Railways.
|
11.01.12
|
11.01.12
|
08.02.2012 up to 15.00 hrs. Changed to 16.02.2012 up to 15.00 hrs.
|
08.02.2012 at 15.30 hrs. Changed to 16.02.2012 at 15.30 hrs.
|
US $ 7,650.00 or Rs 3,82,500.00
|
|
|
IRCON/9038/SLR.S&T/ SIG.WORKS.PKG-I®/08
|
Design, Supply, Installation, Testing and Commissioning of Relay Based Panel Interlocking Signalling System at six stations of Sri Lanka Railways.
|
30.03.12
|
30.03.12
|
20.04.2012 up to 15.00 hrs.
|
20.04.2012 at 15.30 hrs.
|
US $7,650 or Rs 3,82,500
|
|
|
IRCON/9038/SLR.S&T/ TELE.WORKS.PKG-I/18
|
System design, supply, installation, testing & commissioning of STM-4, STM-1, ADMs systems, GPS clock, Public Address system, VHF system and trenching , laying, splicing / jointing, back filling, terminating, testing and commissioning of 24 Fiber Underground armoured OFC with 6 Quad /PIJF cable, provision of Emergency socket, Headquarter/Way Side Control Equipment and communication at L-Xing and important locations over section of Anuradhapura to Kankasthurei and Medawachchiya to Talaimannar Pie
|
11.01.12
|
11.01.12
|
15.02.2012 up to 15.00 hrs. Changed to 23.02.2012 up to 15.00 hrs.
|
15.02.2012 at 15.30 hrs. Changed to 23.02.2012 at 15.30 hrs.
|
USD 12,000.00 or Rs 6,00,000.00
|
|
|
IRCON/9038/SLR.S&T/SIG.CABLES.PKG - V/12
|
Supply of PVC, Insulated, Armoured, Unscreened, Underground Power Cables of size 2x25 sq mm (Aluminium) as per RDSO specification no. IRS: S-63/2007 (Amd-2) & IS 1554 (Part-I) or latest from RDSO approved part-I vendors only. (Tender document can be downloaded from 26.12.11 to 16.01.2012 upto 17:00 hrs)
|
26.12.11
|
26.12.11
|
17.01.2012 up to 11:00 hrs. Changed to 24.01.2012 up to 15.00 hrs.
|
17.01.2012 up to 11:30 hrs. Changed to 24.01.2012 at 15.30 hrs.
|
US $ 507 or Rs. 25,500.00
|
|
|
IRCON/9038/SLR.S&T/SIG.CABLES.PKG-IV/11
|
Supply of PVC, Insulated, Armoured, Unscreened, Underground Railway signalling Cables of size 30x1.5 sq mm (Copper conductors) as per RDSO Specification no. IRS: S-63/2007 (Amd-2) or latest from RDSO approved part-I vendors only. (Tender document can be downloaded from 28.12.2011, 10:00 Hrs to 18.01.2012 upto 17:00 Hrs)
|
27.12.11
|
28.12.11
|
19.01.2012 up to 15.00 hrs.
|
19.01.2012 at 15.30 hrs.
|
US $ 1440.00 or Rs 72,000.00
|
|
|
IRCON/9038/SLR.S&T/SIG.CABLES.PKG-VI/13
|
Supply of PVC, Insulated, Armoured, Unscreened, Underground Railway signalling
Cables of size 24x1.5 sq mm (Copper conductors) as per RDSO
Specification no. IRS: S-63/2007 (Amd-2) or latest from RDSO approved part-I vendors. (Tender document can be downloaded from 30.12.2011,10:00 hrs to 22.01.2012 upto 17:00 hrs)
|
28.12.11
|
30.12.11
|
23.01.2012 up to 15.00 hrs. Changed to 02.02.2012 up to 15.00 hrs.
|
23.01.2012 at 15.30 hrs. Changed to 02.02.2012 at 15.30 hrs.
|
US $ 755.00 or Rs 38,000.00
|
|
|
IRCON/9038/SLR.S&T/SIG.CABLES.PKG-XI/19
|
Supply of Underground Railway Jelly Filled 6-Quad Cables of size 0.9 mm diameter for Signaling & Telecom Installations as per RDSO specification No.IRS:TC-30/2005 (Vor.-1) with amend. No. 4 or latest for Sri Lanka Railway from RDSO approved part-I vendors only. (Tender Document can be downloaded from 18.01.2012,10:00 hrs to 09.02.2012 upto 17:00 hrs.)
|
18.01.12
|
18.01.12
|
10.02.2012 up to 15.00 hrs.
|
10.02.2012 at 15.30 hrs.
|
US $ 7,200.00 or Rs 3,60,000.00
|
|
|
IRCON/CC/ TN/JBNRL-2051/EMBANK/617
|
Construction of Embankment, Side Drains, Retaining Walls, and Blanketing Work, construction of Bridges (Minor and Major) and Other Ancillary Works on Indian Side of Alignment From Km.0+000 To Km.5+445 for New Broad Gauge Railway Line From Jogbani To Biratnagar (Nepal).
|
18.01.11
|
25.01.11
|
17.02.2011 up to 15.00 hrs.
|
17.02.2011 at 15.30 hrs.
|
5,00,000.00
|
|
|
IRCON/CC/GANGA BRIDGE-BIHAR- INSU POLICY/11/630
|
Providing Contractor's All Risk (CAR) Insurance Policy for Construction of Rail cum Road Bridge across river Ganga at Patna
|
23.06.11
|
23.06.11
|
14.07.2011 up to 15.00 hrs.
|
14.07.2011 at 15.30 hrs.
|
-
|
|
|
IRCON/CC/TN/HSRC/CBCE/11/632
|
Pre-feasibility study for High Speed
Rail Corridors between Chennai - Bengaluru – Coimbatore – Ernakulam
|
14.07.11
|
15.07.11
|
22.09.2011 up to 11:00 hrs. Changed to 31.10.2011 up to 15.00 hrs.
|
22.09.2011 up to 11:30 hrs. Changed to 31.10.2011 at 15.30 hrs.
|
500000 INR
|
|
|
IRCON/CC/TN/HSRC/HDVC/11/624
|
Pre-feasibility study for High Speed Rail Corridors
between Hyderabad-Doranakal-Vijaywada-Chennai
|
21.04.11
|
25.04.11
|
15.06.2011 up to 11:00 hrs. Changed to 30.06.2011 up to 11.00 hrs.
|
15.06.2011 up to 11:30 hrs. Changed to 30.06.2011 at 11.30 hrs.
|
5,00,000
|
|
|
IRCON/CC/TN/JBNRL/11/626 DT.10.05.2011
|
Construction of A) Station Buildings, Passenger and Goods Platform, PF Shelter/ sheds, Foot Over Bridge(FOB), tea stall, Goods Circulating Area/ roads works etc., B) Staff Quarters, Guest House, Pump House, Duty Huts, OH Water Tank, Garages, Trolley shed, miscellaneous ancillary works including internal Sanitary items, pipes etc. and any other items required to complete the above works in connection “Construction of New Broad Gauge Railway Line From Jogbani To Biratnagar (Nepal) in Indian port
|
10.05.11
|
11.05.11
|
31.05.2011 up to 15:00 hrs. Changed to 06.06.2011 up to 15.00 hrs.
|
31.05.2011 up to 15:30 hrs. Changed to 06.06.2011 at 15.30 hrs.
|
Rs.5,00,000/-
|
|
|
IRCON/CC/TN/JBRLP/11/618
|
Construction of Civil work including Embankment, Side Drains, Retaining Walls, Blanketing , Bridges and other ancillary works in JayNagar to Osrahi Section Ch.Km 0+000 to KM 2+975 (Indian side Alignment Portion) in Connection with Gauge Conversion & Construction of New Broad Gauge Railway Line from JAYNAGAR(INDIA) To BARDIBAS(NEPAL)
|
31.01.11
|
02.02.11
|
21.02.2011 up to 15.00 hrs.
|
21.02.2011 at 15.30 hrs.
|
406550.00
|
|
|
IRCON/CC/TN/JBRLP/11/619
|
Construction of Station Building and other associated miscellaneous works at Jaynagar Railway Station Yard in Connection with Gauge Conversion & Construction of New B.G. Railway Line from JAYNAGAR (INDIA) to BARDIBAS (NEPAL)
|
31.01.11
|
02.02.11
|
21.02.2011 up to 15.00 hrs.
|
21.02.2011 at 15.30 hrs.
|
49805.00
|
|
|
IRCON/CC/TN/ROB-Raj-CONSULT-II/3015/11/628 Date: 16.06.11
|
Carrying out Consultancy work for Road over Bridge/Road under Bridge including detail design, estimate, BOQ working drawing, quality control complete as desired in scope of work for 6 ROB of Rajasthan i.e ROB near Arts college Alwar, at LC No 201 Hindaun , at LC No.108 at Kota, at LC No. 113 at Alwar, at LC No.51 at Sangaria and RUB at LC No.71 at Jodhpur.
|
16.06.11
|
16.06.11
|
08.07.2011 up to 15.00 hrs.
|
08.07.2011 at 15.30 hrs.
|
Rs 2,00,000.00
|
|
|
IRCON/CC/TN/ROB-Raj-CONSULT/3015/11/627 Date: 26.05.2011
|
Carrying out Consultancy work for Road over Bridge including preparation of estimate, BOQ, technical specification, bid documents, detail design and preparation of all working /construction drawings, getting proof checked of design and drawings from IIT, Quality control complete as desired in scope of work for ROB at LC No. 88B at Chittorgarh and LC No. 139 at Bikaner.
|
26.05.11
|
31.05.11
|
17.06.2011 up to 15.00 hrs. changed to 20.06.2011 up to 15.00 hrs.
|
17.06.2011 at 15.30 hrs. changed to 20.06.2011 at 15.30 hrs.
|
Rs. 45,500.00
|
|
|
IRCON/CC/TN/ROB-RAJ./Consultancy/640
|
Consultancy work for preparation of GAD, GT investigation, design, estimate, working drawing etc. for 4- ROBs near Jaipur i.e. L.C. No. : 233 at Kanakpura, L.C. No.:89 at Dadi Ka Phatak, L.C. No.:228 at Khatipura and L.C. No.: 200 at Bassi
|
18.10.11
|
19.10.11
|
11.11.2011 up to 15.00 hrs.
|
11.11.2011 at 15.30 hrs.
|
100000.00
|
|
|
IRCON/CC/TN/ROB-RAJ./Consultancy/641
|
Consultancy work for design, estimate, working drawing etc. for 3- ROBs at L.C. No.:43/1 & 43 at Ajmer, L.C. No.:32 at Kishangarh and L.C. No.:34 at Makrana
|
18.10.11
|
18.10.11
|
11.11.2011 up to 15.00 hrs.
|
11.11.2011 at 15.30 hrs.
|
55000.00
|
|
|
IRCON/CC/TN/ROB-RAJ/CONSULT- V/3015/11/636 Date: 28.07.2011
|
Carrying out Consultancy work for Road over Bridge including Preparation of GAD, GT investigation, detail design, estimate, BOQ working drawing, quality control complete as desired in scope of work for 3 ROBs of Rajasthan i.e ROB at LC No.200 at Jaipur, ROB at LC No. 228 at Jaipur, ROB at LC No. 89 at Jaipur.
|
28.07.11
|
29.07.11
|
19.08.2011 up to 15.00 hrs. Changed to 25.08.2011 up to 15.00 hrs.
|
19.08.2011 at 15.30 hrs. Changed to 25.08.2011 at 15.30 hrs.
|
170000
|
|
|
IRCON/CC/TN/ROB-RAJ/CONSULT-IV/3015/11/635 Date: 21.07.2011
|
Carrying out Consultancy work for Road over Bridge/Road under Bridge including detail design, estimate, BOQ working drawing, quality control complete as desired in scope of work for 7 ROB of Rajasthan i.e ROB at LC No. 110 at Chomu,ROB at LC No. 233 at Kanakpura,ROB at LC No. 116 at Alwar, ROB at LC No. 108 at Ringus, ROB at LC No. 76 at Neemaka Thana, ROB at LC No. 43/1&43 at Ajmer, ROB at LC No. 32 at Krishnagarh.
|
21.07.11
|
21.07.11
|
12.08.2011 up to 15.00 hrs. Changed to 18.08.2011 up to 15.00 hrs.
|
12.08.2011 at 15.30 hrs. Changed to 18.08.2011 at 15.30 hrs.
|
3,25,000
|
|
|
IRCON/CC/TN/ROB-RAJ/CONSULT/638
|
Carrying out Consultancy work for Road over Bridge including detail design, estimate, BOQ, working drawing as desired in scope of work for 4 ROBs of Rajasthan i.e LC No. 116 at Alwar Yard, LC No. 110 at Chomu, LC No. 108 at Reengus and LC No. 76 at Neem ka Thana.
|
14.10.11
|
17.10.11
|
08-nov-2011 up to 15:00 hrs.
|
08-nov-2011 at 15:30 hrs.
|
65000.00
|
|
|
IRCON/CC/TN/ROB-RAJ/CONSULT/639
|
Carrying out Consultancy work for Road over Bridge including detail design, estimate, BOQ, working drawing as desired in scope of work for 3 ROBs and 1 RUB at Jodhpur, Rajasthan i.e ROBs at LC No.C-160,C-165, C-18 and RUB at LC No.C-2
|
14.10.11
|
17.10.11
|
08-nov-2011 up to 15:00 hrs.
|
08-nov-2011 at 15:30 hrs.
|
75000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/11/621
|
Construction of balance left over works of Box Culverts between PUPRI to BENIPATTI (Ch. 39.65 Km. to 14.72 Km.) of SH - 52 in Madhubani district of Bihar State under RSVY. PACKAGE-1D(i-a)
|
09.03.11
|
09.03.11
|
29.03.2011 up to 15.00 hrs.
|
29.03.2011 at 15.30 hrs.
|
207000
|
|
|
IRCON/CC/TN/RSVY-BIHAR/11/631
|
CONSTRUCTION OF BALANCE LEFT OVER WORKS OF BOX CULVERTS BETWEEN PUPRI TO BENIPATTI (CH:39.65 KM TO 14.72 KM) OF SH-52 IN MADHUBANI DISTRICT OF BIHAR STATE UNDER RSVY. PACKAGE-1D(i-a)
|
07.07.11
|
08.07.11
|
21.07.2011 up to 15.00 hrs.
|
21.07.2011 at 15.30 hrs.
|
207000
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/ 652
|
Road Connectivity between SH-52 and NH-57 at Kamla Balan Bund Near Mehat Dhala in Madhubani District Under Rashtriya Sam Vikas Yojana (RSVY) Project Bihar (Package – 1D (iii-a))
|
20.04.12
|
20.04.12
|
11.05.2012 up to 15.00 hrs.
|
11.05.2012 at 15.30 hrs.
|
5,00,000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/ 653
|
Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1A(i) & 1A(ii) in Vaishali & Samastipur District under RSVY Project Bihar (Package- 1A- Link Road)
|
20.04.12
|
20.04.12
|
11.05.2012 up to 15.00 hrs.
|
11.05.2012 at 15.30 hrs.
|
2,25,000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/651
|
ROAD CONNECTIVITY BETWEEN SH-52 AND NH-57 AT KAMLA BALAN BUND NEAR MEHAT DHALA IN MADHUBANI DISTRICT UNDER RASHTRIYA SAM VIKAS YOJANA (RASVY) PROJECT BIHAR (PACKAGE- 1D(III-a))
|
28.03.12
|
29.03.12
|
18.04.2012 up to 15.00 hrs.
|
18.04.2012 at 15.30 hrs.
|
500000
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/654
|
Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1B(ii-i), 1B(iii) & 1B(iv) in Samastipur District under RSVY Project Bihar (Package- 1B- Link Road)
|
20.04.12
|
20.04.12
|
11.05.2012 up to 15.00 hrs.
|
11.05.2012 at 15.30 hrs.
|
3,45,000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/655
|
Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1B(i), 1C(i) & 1C(ii) in Darbhanga District under RSVY Project Bihar (Package- 1C- Link Road)
|
20.04.12
|
20.04.12
|
11.05.2012 up to 15.00 hrs.
|
11.05.2012 at 15.30 hrs.
|
3,70,000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/12/656
|
Improvement/Upgradation of existing Branch/Link Road up to 25m. Length covering Package 1D(i), 1D(ii), 1D(iii) & 1D(Y) in Madhubani District under RSVY Project Bihar (Package- 1D- Link Road)
|
20.04.12
|
20.04.12
|
11.05.2012 up to 15.00 hrs.
|
11.05.2012 at 15.30 hrs.
|
3,85,000.00
|
|
|
IRCON/CC/TN/RSVY-BIHAR/646
|
Balance work of Improvement / Upgradation of State Highways – 56 from Shivnagar Ghat to Kusheshwar Asthan in Darbhanga district of Bihar State (PACKAGE-1C(ii) Road)
|
19.12.11
|
19.12.11
|
09.01.2012 up to 15.00 hrs.
|
09.01.2012 at 15.30 hrs.
|
500000
|
|
|
IRCON/CC/TN/SR-2046/DDC-RY/11/644
|
Detailed Design Consultancy for development of layout plan for Rangpo Yard for construction of Sivok – Rangpo new B.G. Rail Line project
|
08.11.11
|
09.11.11
|
30.11.2011 up to 15.00 hrs.
|
30.11.2011 at 15.30 hrs.
|
15000
|
|
|
IRCON/CC/TN/SR-2046/DDC-RY/11/645-RETENDER
|
Detailed Design Consultancy for development of
layout plan for Rangpo Yard for construction of Sivok – Rangpo new B.G. Rail
Line project
|
13.12.11
|
14.12.11
|
04.01.2012 up to 15.00 hrs.
|
04.01.2012 at 15.30 hrs.
|
Rs.15,000/
|
|
|
IRCON/CC/TN/SR-2046/DDC/11/647
|
Detailed Design Consultancy of all structures including Tunnels, Bridges/Viaducts, Station Yard and associated works and construction supervision of Tunnels between Km 26.570 to Km 33.530 for construction of Sivok (West Bengal)–Rangpo (Sikkim) new B.G. Rail Line project
|
21.12.11
|
21.12.11
|
19.01.2012 up to 15.00 hrs. Changed to 27.01.2012 up to 15.00 hrs.
|
19.01.2012 at 15.30 hrs. Changed to 27.01.2012 at 15.30 hrs.
|
Rs.10 Lacs
|
|
|
IRCON/CC/TN/SR-2046/SQ/11/643
|
Construction of 28 nos. type II and 04 nos type-III Staff quarters at SIVOK in connection with Sivok (West Bengal ) to Rangpo (Sikkim) Rail line Project
|
04.11.11
|
11.11.11
|
25.11.2011 up to 15.00 hrs.
|
25.11.2011 at 15.30 hrs.
|
82000
|
|
|
IRCON/CC/TN/SR/-2046/SQ/12/649 DT 24.1.12
|
Construction of 28 nos. type II and 04 nos type-III Staff quarters including internal Sanitary and related external works at SIVOK in connection with Sivok (West Bengal ) to Rangpo (Sikkim) new B.G.Rail line Project.
|
26.01.12
|
01.02.12
|
17.02.2012 up to 15.00 hrs.
|
17.02.2012 at 15.30 hrs.
|
RS 82000
|
|
|
IRCON/CC/TN/SR/11/620 date 03..03.2011
|
Carrying out traverse grid network through DGPS and terrestrial survey method along the identified corridor between Sivok in west Bengal to Rangpo in state of Sikkim for Sivok Rangpo New BG Rail Line Project. Approximate length of line is 45 Kms
|
03.03.11
|
08.03.11
|
25.03.2011 up to 15.00 hrs.
|
25.03.2011 at 15.30 hrs.
|
Rs 34000.00
|
|
|
IRCON/CC/TN/SR/11/642
|
Detailed Design Consultancy, 3D
Monitoring & Supervision of Tunnel T-14 (Between Km. 41+749 to Km.43+825) in connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) New Single
Line B.G. Railway Line Project
|
21.10.11
|
31.10.11
|
23.11.2011 up to 15.00 hrs. Changed to 28.11.2011 up to 15.00 hrs.
|
23.11.2011 at 15.30 hrs. Changed to 28.11.2011 at 15.30 hrs.
|
500000.00
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-16, Dt.17.03.20
|
Construction of Shell fabrication shop of RCF Raebareli including architectural, structural design, Fabrication, supply and erection of Pre-Engineered Steel Buildings
|
17.03.11
|
22.03.11
|
18.04.2011 up to 15.00 hrs.
|
18.04.2011 at 15.30 hrs.
|
2710000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-17, Dt.17.03.2011
|
Construction of Flooring, civil works in Shell fabrication shop and traverser track at RCF, Raebareli at Lalganj
|
17.03.11
|
22.03.11
|
18.04.2011 up to 12.00 hrs.
|
18.04.2011 at 12.30 hrs.
|
1336000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-18, Dt.26.07.2011
|
Construction of three Sewage Treatment Plants based on SBR technology of capacity (a) 1100 KL/day, (workshop) (b) 1100 KL/day (East colony) and (c) 400 KL/day (west colony) on turnkey basis at RCF-Raebareli including Design, Supplying, Installation, Testing and Commissioning including operation and maintenance for 36 months.
|
27.07.11
|
02.08.11
|
30.08.2011 up to 12.00 hrs. Changed to 22.09.2011 up to 12.00 hrs.
|
30.08.2011 at 12.30 hrs. Changed to 22.09.2011 at 12.30 hrs.
|
245000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-20 Dt.20.09.2011
|
Construction of Flooring, Foundations & other Civil works in Wheel shop, Bogie
Shop, Paint Shop, Garnet Blasting Shop,
Machine Shop, Transport Shop & Shell
Store of RCF Raebareli including traverser
track for RCF, Raebareli at Lalganj.
|
20.09.11
|
21.09.11
|
20.10.2011 up to 11.00 hrs.
|
20.10.2011 at 11.30 hrs.
|
1000000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-21, Dt.26.09.20
|
Construction of Officer's Club & Guest House, Supervisor & Worker's Club & Guest House, Senior Sec. & Primary Schools, Technical Trainee & Sports Hostel, Maintenance office (5 nos.), Hospital and Shopping Complex etc. , for RCF, Raebareli at Lalganj.
|
26.09.11
|
27.09.11
|
21.10.2011 up to 12.00 hrs. Changed to 25.10.2011 up to 12.00 hrs. Changed to 02.11.2011 up to 12.00 hrs.
|
21.10.2011 at 12.30 hrs. Changed to 25.10.2011 at 12.30 hrs. Changed to 02.11.2011 at 12.30 hrs.
|
2500000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-23 Dated 04.11.2011
|
Construction of External Sewerage, Drainage and Water supply works including Overhead Water Tanks for the Rail coach Factory Raebareli complex at Lalganj
|
04.11.11
|
08.11.11
|
30.11.2011 up to 12.00 hrs.
|
30.11.2011 at 12.30 hrs.
|
1000000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-24 Dt. 18.11.2011
|
Construction of Bituminous and concrete roads for the Rail Coach Factory Raebareli complex at Lalganj
|
18.11.11
|
21.11.11
|
20.12.2011 up to 12.00 hrs.
|
20.12.2011 at 12.30 hrs.
|
1000000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-25, Dt. 24.01.2012
|
Construction of Office Complex, Laboratory, Canteen, Office Cum Locker Blocks, Product Development Centre & TTC Workshops in PEB for RCF Raebareli at Lalganj (UP)
|
24.01.12
|
25.01.12
|
24.02.2012 up to 12.00 hrs. changed to 12.03.2012 up to 12.00 hrs.
|
24.02.2012 at 12.30 hrs. changed to 12.03.2012 at 12.30 hrs.
|
1000000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-26, Dt. 30.03.2012
|
Construction of Two no. Road Under Bridges (RUB) by Cut & Cover Technique comprising box of Approximate opening size 7.0 x 3.65m and 20m length along with it’s approaches, Drainage and Allied Road works etc. complete for RCF Raebareli at Lalganj (UP)
|
30.03.12
|
02.04.12
|
30.04.2012 up to 12.00 hrs.
|
30.04.2012 at 12.30 hrs.
|
500000
|
|
|
IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT/15
|
Tender Document
For
EARTHWORK IN FILLING, LEVELLING & COMPACTION WITH
RELATED WORKS INSIDE WORKSHOP AREA OF RCF,
RAEBARELI AT LALGANJ
|
13.12.10
|
14.12.10
|
05.01.2011 up to 15.00 hrs.
|
05.01.2011 at 15.30 hrs.
|
261000
|
|
|
IRCON/Civil/1029/RCF-RBL/ASS-CIVIL /OT/7000/05
|
Construction of Auxiliary
Sub-Station Buildings in
Factory Area in connection
with construction of Rail
Coach Factory Raebareli,at
Lalganj, Raebareli, (UP).
|
26.08.11
|
31.08.11
|
20.09.2011 up to 15.00 hrs.
|
20.09.2011 at 15.30 hrs.
|
2,90,000/-
|
|
|
IRCON/Civil/1029/RCF-RBL/MRS-CIVIL/7000/02
|
Construction of Main Receiving Substation Civil Works including Control Room Building, Service road,Yard and Equipment Foundations, Fencing,
Internal wiring of C.R. Building, cable
trenching etc.for Rail Coach Factory at
Lalganj, Raebareli, (UP).
|
12.07.11
|
15.07.11
|
05.08.2011 up to 15.00 hrs.
|
05.08.2011 at 15.30 hrs.
|
160000
|
|
|
IRCON/Civil/1029/RCF-RBL/Tender/7000/09 Dt.29.10.2011
|
Construction of RCC work in foundation, drain, cross drainage work and miscellaneous work etc. for Rail Coach Factory at Lalganj, Raebareli, (UP).
|
31.10.11
|
31.10.11
|
18.11.2011 up to 15.00 hrs.
|
18.11.2011 at 15.30 hrs.
|
1,21,000.00
|
|
|
IRCON/Civil/1029/RCFF-RBL/10/Tennder/3/OT-22 Dt.30.09.20011
|
Construction of Administrative Building & Technical Training Centre for RCF, Raebareli at Lalganj.
|
30.09.11
|
05.10.11
|
31.10.2011 up to 12.00 hrs. Changed to 04.11.2011 up to 12.00 hrs.
|
31.10.2011 at 12.30 hrs. Changed to 04.11.2011 at 12.30 hrs.
|
1000000
|
|
|
IRCON/CIVIL/7004/MFC/TENDER/PHASE-1/11/01
|
Construction of Multi-Functional Complex (MFC) at Indore Railway Station
|
24.06.11
|
28.06.11
|
18.07.2011 up to 15.00 hrs.
|
18.07.2011 at 15.30 hrs.
|
260000
|
|
|
IRCON/ELECT./1008/J&K- DLI/ESS:01-03
|
Tender for Upgradation of existing 33KV/0.433KV, 11KV/0.433KV, 1x63KVA sub-stations to 33KV/0.433KV, 11KV/0.433KV, 2x63KVA at Railway Station area at Sadura, Brijbehara, Panjgam, Awantipora, Kakapore, Pampore, Mazhom, Pattan, Hamre and Sopore (SS-O1), SITC of 33KV/0.433KV, (2X500KVA) Sub-station at Colony & RPF/GRP Barracks at Qazigund & Barramulla (SS-02) and 11KV/0.433KV, (1X150KVA) substation at RPF/GRP Barracks at Pattan (SS-03) on Qazigund – Barramulla Section of USBRL.
|
16.12.10
|
16.12.10
|
06.01.2011 up to 15.00 hrs.
|
06.01.2011 at 15.30 hrs.
|
343000
|
|
|
IRCON/Elect./1029/RCF-RBL/TOWNSHIP & CSS/17
|
Supply and erection of HT, LT Power supply distribution system, CSS, Cabling & street lighting etc. for RCF Township area, Rae Bareli (UP).
|
10.06.11
|
10.06.11
|
24.06.2011 up to 15.00 hrs.
|
24.06.2011 at 15.30 hrs.
|
Rs.75,000.00
|
|
|
IRCON/Elect./5016/RE.MGS.UTR
|
TENDER FOR OHE FOUNDATION WORKS OF SULTANPUR YARD RAILWAY STATIONS IN CONNECTION WITH RAILWAY ELECTRIFICATION WORKS IN MUGHALSARAI – SULTANPUR – UTRATIA SECTION (GR. 136 & 137) UNDER RE PROJECT, LUCKNOW
|
16.11.10
|
22.11.10
|
15.12.2010 up to 15.00 hrs.
|
15.12.2010 at 15.30 hrs.
|
23,300
|
|
|
IRCON/Elect./5016/RE.MGS.UTR/TSS/SLN/
|
TENDER FOR FOUNDATION, CABLE TRENCH & BAFFLE WALL WORKS OF 132/25 KV TSS AT SULTANPUR RAILWAY STATIONS IN CONNECTION WITH RAILWAY ELECTRIFICATION WORKS IN MUGHALSARAI – SULTANPUR – UTRATIA SECTION (GR. 136 & 137) UNDER RE PROJECT, LUCKNOW.
|
16.11.10
|
23.11.10
|
15.12.2010 up to 15.00 hrs.
|
15.12.2010 at 16.30 hrs.
|
17,500
|
|
|
IRCON/Elect./5016/RE.MGS.UTR/TSS/SYW/
|
TENDER FOR FOUNDATION & CABLE TRENCH WORKS OF 132/25 KV TSS AT SINDURWA RAILWAY STATIONS IN CONNECTION WITH RAILWAY ELECTRIFICATION WORKS IN MUGHALSARAI – SULTANPUR – UTRATIA SECTION (GR. 136 & 137) UNDER RE PROJECT, LUCKNOW.
|
16.11.10
|
22.11.10
|
15.12.2010 up to 15.00 hrs.
|
15.12.2010 at 16.00 hrs.
|
15,600
|
|
|
IRCON/ELECT/1029/RCF-RBL/1010KVA DG/34
|
DESIGN, SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ALL THE ELECTRICAL EQUIPMENTS RELATED TO 4 SETS OF STANDBY DIESEL GENERATOR SETS OF 1010KVA, 11kV WITH SYNCRONISING PANELS, UNDERGROUND FUEL STORAGE TANK, MINOR CIVIL WORKS AND ALL OTHER ASSOCIATED WORKS AT NEW RAIL COACH FACTORY, RAE BARELI (U.P.)
|
29.11.11
|
30.11.11
|
20.12.2011 up to 15.00 hrs. Changed to 22.12.2011 up to 15.00 hrs.
|
20.12.2011 at 15.30 hrs. changed to 22.12.2011 at 15.30 hrs.
|
Rs.5.0 Lakhs
|
|
|
IRCON/ELECT/1029/RCF-RBL/BAL ASS/33
|
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ELECTRICAL EQUIPMENTS RELATED TO POWER SUPPLY DISTRIBUTION FOR 08 NOS. 11/0.433kV AUXILIARY SUB STATIONS AT NEW RAIL COACH FACTORY, RAE BARELI (UP)
|
26.12.11
|
26.12.11
|
16.01.2012 up to 15:00 hrs. Changed to 23.01.2012 up to 15.00 hrs.
|
16.01.2012 up to 15:30 hrs. Changed to 23.01.2012 at 15.30 hrs.
|
Rs.4.62 Lakhs
|
|
|
IRCON/ELECT/1029/RCF-RBL/CSS-750/22
|
Supply, Installation, Testing and Commissioning of 750KVA 11/0.433kV Compact Substations at RCF, Raebareli (Uttar Pradesh).
|
27.09.11
|
27.09.11
|
18.10.2011 up to 15.00 hrs.
|
18.10.2011 at 15.30 hrs.
|
Rs. 1,70,000/-
|
|
|
IRCON/ELECT/1029/RCF-RBL/DG SET/18
|
Supply, Erection, Testing & Commissioning of One 380kVA, 415V Silent DG Set for RCF, Rae Bareli (UP).
|
21.06.11
|
21.06.11
|
11.07.2011 up to 15.00 hrs.
|
11.07.2011 at 15.30 hrs.
|
Rs.20,000/-
|
|
|
IRCON/ELECT/1029/RCF-RBL/INTERNAL ELECT GREEN BUILDING/42
|
Supply, Installation,Testing & Commissioning of Internal lighting distribution network system,inside Adminstrative Building,Technical Traing Centre,Technical Training Hostel and shopping Complex at New Rail Coach Factory, Rae Bareli(U.P.).
|
12.04.12
|
12.04.12
|
03.05.2012 up to 14.00 hrs.
|
03.05.2012 at 14.30 hrs.
|
Rs.3,16,500/-
|
|
|
IRCON/ELECT/1029/RCF-RBL/LIGHT FITTINGS & FANS/38
|
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF LIGHT FITTINGS AND FANS FOR RESIDENTIAL QUARTERS AT NEW RAIL COACH FACTORY, RAE BARELI (U.P.)
|
05.01.12
|
06.01.12
|
27.01.2012 up to 14.00 hrs.
|
27.01.2012 at 14.30 hrs.
|
Rs.92,000/-
|
|
|
IRCON/ELECT/1029/RCF-RBL/MISC SHOP/35
|
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ELECTRICAL POWER DISTRIBUTION SYTEM INCLUDING LIGHTING IN BOGIE, WHEEL, PAINT, MILL WRITE & TRANSPORT SHOPS AT NEW RAIL COACH FACTORY, RAE BARELI (U.P.)
|
01.12.11
|
01.12.11
|
21.12.2011 up to 15.00 hrs.
|
21.12.2011 at 15.30 hrs.
|
Rs.5.00 Lakhs
|
|
|
IRCON/ELECT/1029/RCF-RBL/MRS ELECT/33
|
Supply, Installation, Testing & Commissioning of all the Electrical equipments related to 132/11kV Main Receiving Substation including all associated works at New Rail Coach Factory, Rae Bareli (U.P.)
|
13.12.11
|
14.12.11
|
04.01.2012 up to 15.00 hrs. Changed to 11.01.2012 up to 15.00 hrs. Changed to 17.01.2012 up to 15.00 hrs.
|
04.01.2012 at 15.30 hrs. Changed to 11.01.2012 at 15.30 hrs. Changed to 17.01.2012 at 15.30 hrs.
|
3,64,000.00
|
|
|
IRCON/ELECT/1029/RCF-RBL/MRS-CIVIL/14
|
Construction of Main Receiving Substation – Civil Works related to Control Room Building, Yard and Equipment Foundations Fencing Internal wiring of C.R. Building etc. for Rail Coach Factory at Lalganj, Raebareli, (UP)
|
11.05.11
|
11.05.11
|
01.06.2011 up to 15.00 hrs.
|
01.06.2011 at 15.30 hrs.
|
Rs. 1.00 Lakh
|
|
|
IRCON/ELECT/1029/RCF-RBL/Shell Shop/28
|
Supply, installation, testing & commissioning of electrical power distribution system including Lighting in Shell Fabrication shop at New Rail Coach Factory, Rae Bareli (U.P.).
|
17.11.11
|
18.11.11
|
08.12.2011 up to 15.00 hrs.
|
08.12.2011 at 15.30 hrs.
|
Rs.5,00,000/-
|
|
|
IRCON/ELECT/1029/RCF-RBL/TOWNSHIP LIGHT & POWER/39
|
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF HT/LT POWER DISTRIBUTION NETWORK SYSTEM INCLUDING ROAD CUM OPEN SPACE LIGHTING IN TOWNSHIP AT NEW RAIL COACH FACTORY, RAE BARELI (U.P.).
|
13.01.12
|
13.01.12
|
02.02.2012 up to 14.00 hrs. changed to 07.02.2012 up to 14.00 hrs.
|
02.02.2012 at 14.30 hrs. changed to 07.02.2012 at 14.30 hrs.
|
Rs. 5.00 Lakhs
|
|
|
IRCON/ELECT/1029/RCF-RBL/UTILITY BUILD IN Workshop/41
|
SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF INTERNAL LIGHTING & POWER SUPPLY SYSTEM OF MISC. UTILITY BUILDINGS INSIDE THE WORKSHOP AREA AT NEW RAIL COACH FACTORY, RAE BARELI (U.P.).
|
13.02.12
|
13.02.12
|
05.03.2012 up to 15.00 hrs.
|
05.03.2012 at 15.30 hrs.
|
Rs.1.18Lakh
|
|
|
IRCON/ELECT/1029/RCF-RBL/WORSHOP STREET LIGHTING/40
|
SUPPLY,INSTALLATION,TESTING & COMMISSIONING OF ROAD CUM OPEN SPACE LIGHTING IN WORKSHOP AREA AT NEW RAIL COACH FACTORY, RAEBARELI,(UP).
|
20.01.12
|
20.01.12
|
10.02.2012 up to 15.00 hrs. Changed to 15.02.2012 up to 15.00 hrs.
|
10.02.2012 at 15.30 hrs. Changed to 15.02.2012 at 15.30 hrs.
|
Rs.1,21,000/-
|
|
|
IRCON/ELECT/1029/RCF.RBL/Test Eqpt/ 11A
|
Design, Supply, Erection,Testing & Commissioning including AMC of Testing equipments for testing the Railway's AC Coaches at New Rail Coach Factory, Rae Bareli(UP).
|
10.02.11
|
10.02.11
|
25.02.2011 up to 15.00 hrs.
|
25.02.2011 at 15.30 hrs.
|
Rs. 30,000
|
|
|
IRCON/Elect/3014/Jhalawar/Copper Conductor/3
|
Supply of Copper Conductors for Design Engineering, Manufacturing, Supply to Site, Construction, Installation, Commissioning of Railway Siding (Within the Railway Premises & Upto RVUN Power Plant Boundry And Also Within The RVUN’s Premises of Kalisindh TPS) for 2x 600 Mw Unit # 1 & 2, Kalisindh Thermal Power Project, Stage-1, Jhalawar.
|
30.12.11
|
03.01.12
|
23.01.2012 up to 15.00 hrs.
|
23.01.2012 at 15.30 hrs.
|
Rs.2,47,000/-
|
|
|
IRCON/Elect/3014/OHE Erection/01
|
Design, Supply, Erection, Testing & Commissioning of 25 kV Railway Electrification Works at RRVUNL Siding at Kalisindh Thermal Power Station, Jhalawar on Ramganjmandi – Jhalawar (New BG) Section
|
15.12.11
|
20.12.11
|
04.01.2012 up to 15.00 hrs. Changed to 10.01.2012 up to 15.00 hrs.
|
04.01.2012 at 15.30 hrs. Changed to 10.01.2012 at 15.30 hrs.
|
Rs. 5.35 Lakh
|
|
|
IRCON/ELECT/5013/ CUNCOLIM/ FIRE PROTECTION/36
|
PROCUREMENT OF FIRE PROTECTION SYSTEM FOR DESIGN, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF 220/33 KV 3X50 MVA SUBSTATION AT CUNCOLIM IN GOA FOR GOA ELECTRICITY DEPARTMENT (GED)
|
07.07.11
|
07.07.11
|
28.07.2011 up to 15.00 hrs. Changed to 08.08.2011 up to 15.00 hrs.
|
28.07.2011 at 15.30 hrs. Changed to 08.08.2011 at 15.30 hrs.
|
RS. 27,000/-
|
|
|
IRCON/ELECT/J&K- DQ/1014/T-80 PSS I&II DATE: 19/07/2011
|
“Supply, Erection, Testing & Commissioning of Electrical Sub-stations South & North Portal of T-80 Tunnel Consisting of 2X3150 KVA Transformer 33KV/11KV, 2X1500KVA,0.433KV/11KV Transformer,2X250KVA11KV/0.433KV Transformer, 2X1500 KVA Silent DG Set, along with GIS Panel Battery Charger and Other accessories at each Sub-station , Supply of Mandatory Spares including Annual Comprehensive Maintenance of the Installation on yearly basis after Expiry of defect Liability Period ( DLP) ( Package T-80
|
19.07.11
|
26.07.11
|
16.08.2011 up to 15.00 hrs. changed to 30.08.2011 up to 15.00 hrs. Changed to 12.09.2011 up to 15.00 hrs.
|
16.08.2011 at 15.00 hrs. changed to 30.08.2011 at 15.30 hrs. Changed to 12.09.2011 at 15.30 hrs.
|
8.95 lacs
|
|
|
IRCON/ELECT/J&K-DLI/1008/SS-03,04 & RM DATED 08.02.2011
|
Supply,Installation,Testing & Commissioning of 33/.433 KV, 2X1500 KVA(SS-03 & 04)Electric Sub Station, HT Cabling works & 33 KV Ring main System at Budgam, on Qazigund Baramulla Section of New BG Rail line Project (J&K)(Package: SS-03,04 & RM)
|
08.02.11
|
10.02.11
|
03.03.2011 up to 15.00 hrs.
|
03.03.2011 at 15.30 hrs.
|
642000
|
|
|
IRCON/IT/AMC/2011
|
Comprehensive AMC Services
for IT Infrastructure at
IRCON's Specified Locations at New Delhi/NCR
|
09.12.11
|
09.12.11
|
02.01.2012 up to 15:00 hrs.
|
02.01.2012 up to 15:30 hrs.
|
5000
|
|
|
IRCON/IT/SW/Purchase /135
|
Supply, installation of Micr osoft Office 2010 or latest
version
at
IRCON's Cor porate Office at New Delhi
|
28.03.12
|
29.03.12
|
18.04.2012 up to 15.00 hrs.
|
18.04.2012 at 15.30 hrs.
|
11,500
|
|
|
IRCON/IT/SW/PURCHASE/135
|
Supply and installation of Microsoft Office 2010 Professional/Standard INDIC MOLP including 2years software assurance.
|
23.05.11
|
24.05.11
|
14.06.2011 up to 15.00 hrs.
|
14.06.2011 at 15.30 hrs.
|
5500
|
|
|
IRCON/J&K Cell/JAT/14/1014/Support Works /195
|
Providing support services including assistance, surveying and other miscellaneous jobs in connection with the supervision and execution of ongoing works in Zone-VI of Dharam – Qazigund Section of USBRL Project (Package M-14)
|
21.10.11
|
28.10.11
|
18.11.2011 up to 15.00 hrs.
|
18.11.2011 at 15.30 hrs.
|
50000
|
|
|
IRCON/J&K Cell/JAT/14/1008/ TS-27/137
|
“J&K Rail Link Project – Qazigund – Baramulla Section. Transportation of DMU Power and Trailer Coaches by Road, duly conducting feasibility study, from Udhampur Railway Station to Budgam Railway Station of USBRL New BG Rail Link Project (Package TS-27)”
|
19.09.11
|
04.10.11
|
12.10.2011 up to 15.00 hrs. Changed to 18.10.2011 up to 11.00 hrs.
|
12.10.2011 at 15.30 hrs. Changed to 18.10.2011 at 11.30 hrs.
|
464000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/ AT Welding/TS-7
|
Providing and Carrying out A.T. (Alumino-Thermic) Welding 60 kg & UIC (110 UTS), 1080 grade Head Hardened Rails and 52 kg (90 UTS), 880 grade Rails including cutting of rails and allied works between Banihal and Qazigund Stations of Dharam-Qazigund Section of USBRL Project (J&K) (Package TS-7)
|
20.01.12
|
24.01.12
|
17.02.2012 up to 15.00 hrs.
|
17.02.2012 at 15.30 hrs.
|
32000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/ Circ. Ar. Stn. Bldg.- Banihal/M-18
|
Construction of circulating area and miscellaneous works including rigid pavements, RCC retaining / breast walls, Horticultural works, etc., at Banihal Station Yard in Dharma-Quazigund section of USBRL project (J&K) (Package M-18)
|
24.02.12
|
02.03.12
|
21.03.2012 up to 15.00 hrs.
|
21.03.2012 at 15.30 hrs.
|
286000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/ Sangaldan Qtrs-Office/SQ-4
|
Construction of Type-III & Type-IV Quarters cum temporary offices and other related works at Sangaldan Camp near proposed Sangaldan Railway Station on Dharma-Katra section of USBRL project (J&K) (Package: SQ-4)
|
05.03.12
|
12.03.12
|
27.03.2012 up to 15.00 hrs.
|
27.03.2012 at 15.30 hrs.
|
351000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/Ballast-BS-1
|
Supplying and Stacking of Machine Crushed 65 mm Gauge hard stone Railway Track Ballast confirming to latest RDSO Specifications of track ballast within railway boundary on formation and South & North Portal of T-80 Tunnel or Depots at Banihal Yard in Dharma-Qazigund section of USBRL project (J&K) (Package BS-1)
|
14.11.11
|
18.11.11
|
08.12.2011 up to 15.00 hrs.
|
08.12.2011 at 15.30 hrs.
|
206000
|
|
|
IRCON/J&K CELL/JAT/14/1014/D-Q/Hiring Veh-Bnhl-NR/VH-04/234
|
Hiring of vehicles for N. Railway & State Govt. Officers & Staff in connection with the Dharam-Qazigund section of USBRL Project (J&K) (Package no. VH-04)
|
09.04.12
|
13.04.12
|
02.05.2012 up to 15.00 hrs.
|
02.05.2012 at 15.30 hrs.
|
62000
|
|
|
IRCON/J&K CELL/JAT/14/1014/D-Q/Hiring Veh.-Jammu /VH-03
|
Hiring of vehicles for IRCON Officers & Staff for J&K Cell, Jammu in connection with USBRL Project Work (J&K)
|
16.01.12
|
19.01.12
|
14.02.2012 up to 15.00 hrs.
|
14.02.2012 at 15.30 hrs.
|
35000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/Misc. Works--M-17 /199
|
Construction of miscellaneous works including rigid pavements, RCC retaining / breast walls, Sewerage & Water Supply System, Drainage Works, Pathways, UG water tanks, Pump House and other related works at Banihal Yard in Dharma-Quazigund section of USBRL project (J&K) (Package M-17)
|
02.11.11
|
04.11.11
|
24.11.2011 up to 15.00 hrs.
|
24.11.2011 at 15.30 hrs.
|
760000
|
|
|
IRCON/J&K Cell/JAT/14/1014/D-Q/Support Services - M-15 /197
|
Providing support services including housekeeping, assistance /upkeep of IRCON’s Main residential camp-cum-office complex at Krawah, Cheril (T-80- South Portal) & Lower Munda (T-80-Gulab Bagh-North Portal) and Transit camps at different locations and other miscellaneous jobs in connection with Dharam – Qazigund Section of USBRL Project (Package M-15)
|
27.10.11
|
02.11.11
|
22.11.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs.
|
113000
|
|
|
IRCON/J&K Cell/JAT/14/1014/FBW/ Dt. 31.03.2012
|
Flash Butt Welding of 60 Kg UIC (1080 Gr) HH Rails 110 UTS and 52 Kg Rails (880 Gr.) 90 UTS Rails in Situ / Depot at Banihal – Qazigund Section, including Tunnel T-80, in connection with Dharam – Qazigund Project, J&K (Package FBW)
|
31.03.12
|
06.04.12
|
25.04.2012 up to 15.00 hrs. Changed to 02.05.2012 up to 15.00 hrs. Changed to 09.05.2012 up to 15.00 hrs.
|
25.04.2012 at 15.30 hrs. Changed to 02.05.2012 at 15.30 hrs. Changed to 09.05.2012 at 15.30 hrs.
|
2.07 lacs
|
|
|
IRCON/J&K CELL/JAT/14/1014/TS-1/188
|
“J&K Rail Link Project – Dharam – Qazigund Section. Manufacturing & supply of Insulated Glued Joints completed with fittings for 60 Kg (UIC-90 UTS) rails on 60 Kg PSC Sleepers as per relevant RDSO Drawings including Loading, Leading, unloading & proper stacking at Banihal Yard (Package TS-1)”
|
17.09.11
|
23.09.11
|
14.10.2011 up to 15.00 hrs. Changed to 20.10.2011 up to 15.00 hrs.
|
14.10.2011 at 15.30 hrs. Changed to 20.10.2011 at 15.30 hrs.
|
80000
|
|
|
IRCON/J&K CELL/JAT/14/1014/TS-2/189
|
“J&K Rail Link Project – Dharam – Qazigund Section. Manufacturing & supply of GFN Liners, Elastic Rail Clips, Metal Liners and Plate Screws for 60 Kg rails on 60 Kg Sleepers as per relevant RDSO Drawings including Loading, Leading, unloading & proper stacking at Banihal store yard (Package TS-2)”
|
19.09.11
|
28.09.11
|
18.10.2011 up to 15.00 hrs.
|
18.10.2011 at 15.30 hrs.
|
84000
|
|
|
IRCON/J&K CELL/JAT/14/1014/TS-3/209
|
Manufacturing & supply of Elastic Rail Clips for 60 Kg rails on 60 Kg Sleepers as per relevant RDSO Drawings including Loading, Leading, unloading & proper stacking at Banihal store yard on Dharam-Qazigund Section of USBRL Project (J&K) (Package TS-3)
|
01.12.11
|
02.12.11
|
21.12.2011 up to 15.00 hrs.
|
21.12.2011 at 15.30 hrs.
|
46000
|
|
|
IRCON/J&K-CELL/JAT/14/7004/02/
|
Construction of Multi Functional Complex (MFC) comprising of Rail Yatri Niwas & Passenger Amenities Center at Jammu Tawi Railway Station, Jammu & Kashmir
|
30.12.11
|
09.01.12
|
03.02.2012 up to 15.00 hrs.
|
03.02.2012 at 15.30 hrs.
|
527000
|
|
|
IRCON/J&K-SGR /1008/14/116/S&T/ Outdoor Work /3935
|
Supply, Installation, Testing and Commissioning of Outdoor Signalling gears (in connection with Electronic Interlocking) at Sopore Station on Qazigund- Baramulla New GB Rail Line project.
|
10.12.10
|
21.12.10
|
31.12.2010 up to 15.00 hrs.
|
31.12.2010 at 15.30 hrs.
|
126000
|
|
|
IRCON/J&K-SGR /1008/14/116/S&T/ Telecom /3934
|
System Design, Supply, Installation, Testing and Commissioning of STM-1 systems & Digital Primary Mux’s, Control/Emergency/LC Gate Communications systems, Power Supply System & OFC Indoor & Outdoor Telecom work at Sopore Station on Qazigund- Baramulla New GB Rail Line project.
|
10.12.10
|
21.12.10
|
31.12.2010 up to 15.00 hrs.
|
31.12.2010 at 15.30 hrs.
|
43000
|
|
|
IRCON/J&K-SGR-DLI/1008/OT/Dog Kennels/Bud, Ham, Bara/DK-B/955
|
Construction of Dog Kennels at Budgam, Hamre & Baramulla Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K) (Package DK-B)
|
26.03.11
|
28.03.11
|
19.04.2011 up to 15.00 hrs.
|
19.04.2011 at 15.30 hrs.
|
Rs 2.21 Lacs
|
|
|
IRCON/J&K-SGR-DLI/1008/OT/Dog Kennels/Qaz, Anant, Awant/ DK-A/ 955 Date: 26.03.2011
|
Construction of Dog Kennels at Qazigund, Anantnag & Awantipora Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K) (Package DK-A)
|
26.03.11
|
28.03.11
|
19.04.2011 up to 15:00 hrs.
|
19.04.2011 up to 15:30 hrs.
|
Rs 2.21 Lacs
|
|
|
IRCON/J&K-SGR-DLI/1008/OT/Quarters-Baramulla/Q-9/872 Date: 23.04.2011
|
Construction of RPF Quarters Type-II units, Modification of SORH to Type-III & Type-IV units at Baramulla Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K) (Package Q-9)
|
23.04.11
|
25.04.11
|
18.05.2011 up to 15.00 hrs.
|
18.05.2011 at 15.30 hrs.
|
Rs 2.15 Lacs
|
|
|
IRCON/J&K-SGR-DLI/1008/OT/SSP office/Srinagar/OB-25/1023 Date: 18.05.2011
|
Construction of SSP office and other allied works at Srinagar Railway Station Yard on Qazigund-Baramulla New BG Rail Line Project (J&K) (Package OB-25)
|
18.05.11
|
18.05.11
|
08.06.2011 up to 15.00 hrs.
|
08.06.2011 at 15.30 hrs.
|
Rs 2.13 Lacs
|
|
|
IRCON/J&K-SGR/1008/ Stone Aggregate/ 552 / 1437 Dt. 09.07.2011
|
Sale of by products i.e 20mm aggregates and 10mm aggregate with dust from the departmental crusher plant located at Pampore on Qazigund-Baramulla New BG Rail Line Project (J&K).
|
09.07.11
|
11.07.11
|
01.08.2011 up to 15.00 hrs. Changed to 17.08.2011 up to 15.00 hrs.
|
01.08.2011 at 15.30 hrs. Changed to 17.08.2011 at 15.30 hrs.
|
Rs 328000/-
|
|
|
IRCON/J&K-SGR/1008/14/116/S&T/ Services Date: 11.04.2011
|
Executing the misc. work of S&T for Supervision, Installation, Testing & Commissioning and Maintenance of Signal & Telecom gears and Upkeep of office/store on the Qazigund-Baramulla Section of Northern Railway for the period of 6 months.
|
11.04.11
|
11.04.11
|
02.05.2011 up to 15.00 hrs.
|
02.05.2011 at 15.30 hrs.
|
Rs 12500/-
|
|
|
IRCON/J&K-SGR/1008/14/116/S&T/GPS Clocks
|
Supply, Installation, Testing and Commissioning of GPS Based Digital Clocks with all necessary accessories as per RDSO Specification No. RDSO/SPN/TC/62/2008 (Rev.-3.0) or latest at 15 stations on Quazigund – Baramulla New BG Rail Line Project.
|
29.11.10
|
29.11.10
|
21.12.2010 up to 15.00 hrs.
|
21.12.2010 at 15.30 hrs.
|
35000
|
|
|
IRCON/J&K-SGR/1008/14/116/S&T/Services/2940 Date: 06.01.2012
|
Executing the misc. work of S&T for Supervision, Installation,
Testing & Commissioning and Maintenance of Signal &
Telecom gears and Upkeep of office/store on the Qazigund-
Baramulla Section of Northern Railway period for (06) six
months.
|
06.01.12
|
06.01.12
|
27.01.2012 up to 15.00 hrs.
|
27.01.2012 at 15.30 hrs.
|
Rs 11060/-
|
|
|
IRCON/J&K-SGR/1008/OT / Drain- Bathar / 1806 Date : 27.08.2011
|
Construction of Pucca drain from Budgam Yard to Batahar village on Qazigund-Baramulla New B.G Rail Line Project(J&k)
|
27.08.11
|
29.08.11
|
20.09.2011 up to 15.00 hrs.
|
20.09.2011 at 15.30 hrs.
|
Rs 43,000/-
|
|
|
IRCON/J&K-SGR/1008/OT/ Furniture for ORH at Srinagar/2146 Date: 03.10.2011
|
Supply of furniture for Officers' Rest House at Srinagar on Qazigund Baramulla New BG Rail Line Project(J&K)
|
03.10.11
|
03.10.11
|
25.10.2011 up to 15.00 hrs.
|
25.10.2011 at 15.30 hrs.
|
Rs 1.00 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/ Pointing, Painting & Misc Work at Budgam /1365
|
Providing Pointing, Painting of boundary wall, False Ceiling and miscellaneous works at Budgam yard on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
01.07.11
|
01.07.11
|
23.07.2011 up to 15.00 hrs.
|
23.07.2011 at 15.30 hrs.
|
Rs 60000/-
|
|
|
IRCON/J&K-SGR/1008/OT/ S&T Store Banihal/1836 Date : 03.09.2011
|
Construction of Store Godown for S&T at Banihal yard by the transporting structural steel material (released) from Ircon store, Srinagar and erecting the same with necessary foundation, flooring extra and other miscellaneous work on USBRL Project (J&K)
|
03.09.11
|
05.09.11
|
27.09.2011 up to 15.00 hrs.
|
27.09.2011 at 15.30 hrs.
|
Rs 57000/-
|
|
|
IRCON/J&K-SGR/1008/OT/ Stabilising Bank between Km 1.000 to Km 1.400 / 1806 Date : 27.08.2011
|
Stabilising Bank between Km 1.000 to Km 1.400 by providing Dry Stone Pitching and Perpendicular boulder drains on cess along with cascading & berm drains on top berm on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
27.08.11
|
29.08.11
|
20.09.2011 up to 15.00 hrs.
|
20.09.2011 at 15.30 hrs.
|
Rs 1.13 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/ Stabilising Bank between Km 1.000 to Km 1.400 /2261 Date : 16.10.2011
|
Stabilising Bank between Km 1.000 to Km 1.400 by providing Dry Stone Pitching and Perpendicular boulder drains on cess along with cascading & berm drains on top berm on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
16.10.11
|
17.10.11
|
31.10.2011 up to 15.00 hrs.
|
31.10.2011 at 15.30 hrs.
|
Rs 1.13 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/ Storage rack /2486 Date : 15.11.2011
|
Manufacturing & Supply of structural steel storage racks for store depot at Budgam Station Yard on Qazigund-Baramulla New BG Rail line project. (J&K)
|
15.11.11
|
16.11.11
|
07.12.2011 up to 15.00 hrs.
|
07.12.2011 at 15.30 hrs.
|
Rs 24000.00
|
|
|
IRCON/J&K-SGR/1008/OT/ Through FOB at Budgam Date: 08.03.2011
|
Illumination of Through FOB at Budgam Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
08.03.11
|
08.03.11
|
30.03.2011 up to 15.00 hrs.
|
30.03.2011 at 15.30 hrs.
|
30000/-
|
|
|
IRCON/J&K-SGR/1008/OT/Bal work Duty Hut/DH/02-1/1729 Date : 13.08.2011
|
Construction of balance work of duty hut for guard at major bridges between Kakapora-Budgam Section (Br No 81 to 125) including miscellaneous works on Qazigund-Baramulla New BG Rail Line Project (J&K) (Pkg DH/02-1)
|
13.08.11
|
16.08.11
|
06.09.2011 up to 15.00 hrs.
|
06.09.2011 at 15.30 hrs.
|
Rs 1.16 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/Bal work of load Box Shed-Budgam/1365
|
Construction of Balance work of Load Box Shed at Budgam Yard on Qazigund-Baramulla New BG Rail Line Project (J&K) ( Pkg OB-11R-1)
|
01.07.11
|
01.07.11
|
23.07.2011 up to 15.00 hrs.
|
23.07.2011 at 15.30 hrs.
|
Rs 1.20 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/DH/02-1R/2486 Date : 15.11.2011
|
Construction of balance work of duty hut for guard at major bridges between Kakapora-Budgam Section (Br No 81 to 125) including miscellaneous works on Qazigund-Baramulla New BG Rail Line Project (J&K) (Pkg DH/02-1R)
|
15.11.11
|
16.11.11
|
07.12.2011 up to 15.00 hrs.
|
07.12.2011 at 15.30 hrs.
|
Rs 1.16 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/Electrification of Qtrs/ 2770 Date : 19.12.2011
|
Electrification work of RPF/Staff Quarters at Baramulla, Budgam, Srinagar and Anantnag railway station yard on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
19.12.11
|
19.12.11
|
11.01.2012 up to 15.00 hrs.
|
11.01.2012 at 15.30 hrs.
|
Rs 1.04 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/Electrification of Qtrs/2060 Date : 29.10.2011
|
Electrification work of RPF/Staff Quarters at Baramulla, Budgam, Srinagar and Anantnag railway station yard on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
29.10.11
|
01.11.11
|
25.11.2011 up to 15.00 hrs.
|
25.11.2011 at 15.30 hrs.
|
Rs 1.04 Lacs
|
|
|
IRCON/J&K-SGR/1008/OT/Island Platform Shelter/ Pattan,Awant/951
|
Construction of Island Platform Shelters at Pattan & Awantipora Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
26.03.11
|
28.03.11
|
19.04.2011 up to 15.00 hrs.
|
19.04.2011 at 15.30 hrs.
|
Rs 77,000/-
|
|
|
IRCON/J&K-SGR/1008/OT/Side Drain/ Pam, Kaka/769 Date: 11.04.2011
|
Construction of side drain along the chain link fencing up to disposal point at Pampore & Kakapore Railway Station on Qazigund-Baramulla New BG Rail Line Project (J&K)
|
11.04.11
|
11.04.11
|
04.05.2011 up to 15.00 hrs.
|
04.05.2011 at 15.30 hrs.
|
Rs 26000/-
|
|
|
IRCON/J&K-SGR/1008/OT/supporting service for site/587/3754
|
Providing supporting service for site work of Qazigund - Baramulla New BG Rail Line Project.
|
18.11.10
|
23.11.10
|
04.12.2010 up to 15.00 hrs.
|
04.12.2010 at 15.30 hrs.
|
51000
|
|
|
IRCON/J&KCell/JAT/14/1014/T48/210 Dt. 05.03.2012
|
Construction of Tunnel T-48 between Km. 100 and Km. 110.2 (approx) on Dharam-Qazigund Section of USBRL New BG Rail Link Project. (Package – T48)
|
05.03.12
|
12.03.12
|
18.04.2012 up to 15.30 hrs. Changed to 10.05.2012 up to 15.30 hrs.
|
18.04.2012 at 15.30 hrs. Changed to 10.05.2012 at 15.30 hrs.
|
INR 433 lac
|
|
|
IRCON/K-RO/953A/DRM/RCC structure works /13
|
Construction of Sub structure (Pile foundation) & Super structure (Columns, Beams & Slab) of proposed New Divisional Railway Manager's office at Howrah for Eastern Railway,Kolkata.
|
15.12.10
|
21.12.10
|
17.01.2011 up to 15.00 hrs. Changed to 28.01.2011 up to 15.00 hrs.
|
17.01.2011 at 15.30 hrs. Changed to 28.01.2011 at 15.30 hrs.
|
463000
|
|
|
IRCON/MECH /1029 / RCF.RBL-II /Surface Table / 66 & 17.02.12
|
03 Nos. SURFACE TABLE for RCF RBL Project
|
17.02.12
|
17.02.12
|
16.03.2012 up to 11.00 hrs.
|
16.03.2012 at 11.30 hrs.
|
Rs.41,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/ Surface Grinding/89 & 17.02.12
|
01 No. CNC SURFACE GRINDING MACHINE for RCF RBL Project.
|
17.02.12
|
17.02.12
|
22.03.2012 up to 11:00 hrs.
|
22.03.2012 up to 11:30 hrs.
|
Rs.81,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/ Truck & Tipper/25 & 17.02.12
|
04 Nos. Truck (10 T) & 02 Nos. Tipper for RCF RBL Project.
|
17.02.12
|
17.02.12
|
19.03.2012 up to 11.00 hrs.
|
19.03.2012 at 11.30 hrs.
|
Rs.37,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/ Truck 1 Ton & 5 Ton/88 & 17.02.12
|
02 Nos. 1 Ton & 04 Nos. 5 Ton Truck for RCF RBL Project.
|
17.02.12
|
17.02.12
|
20.03.2012 up to 11.00 hrs.
|
20.03.2012 at 11.30 hrs.
|
Rs.22,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/1/CNC TOOL ROOM MILLING MACHINE/76 & 17.02.12
|
01 No. CNC TOOL ROOM MILLING MACHINE for RCF RBL Project.
|
17.02.12
|
17.02.12
|
21.03.2012 up to 11.00 hrs. Changed to 16.04.2012 up to 11.00 hrs.
|
21.03.2012 at 11.30 hrs. Changed to 16.04.2012 at 11.30 hrs.
|
Rs.2,75,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/C02 Welding sets/69 dtd. 17.12.11
|
60 Nos. Synergic Pulse MIG/MAG CO2 Welding Sets & 40 Nos. Synergic MIG/MAG CO2 Welding Sets
|
17.12.11
|
17.12.11
|
06.01.2012 up to 11.00 hrs.
|
06.01.2012 at 11.30 hrs.
|
Rs 2,42,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/CVSMM/46 dtd. 17.12.11
|
01 No. CNC Vertical Spindle Moulder Machine.
|
17.12.11
|
17.12.11
|
25.01.2012 up to 11.00 hrs.
|
25.01.2012 at 11.30 hrs.
|
Rs.1,19,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/Hyd Press/50 & dated 21.01.12
|
02 nos. (800 T) Four Column Hydraulic Press for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
24.02.2012 up to 11.00 hrs.
|
24.02.2012 at 11.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029 /RCF.RBL-II/Laser Cutting/06 dtd. 11.08.11
|
02 Nos. CNC Laser Cutting machines for RCF-RBL Project
|
11.08.11
|
11.08.11
|
05.09.2011 up to 11.00 hrs.
|
05.09.2011 at 11.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/HYDRAULIC LIFT/57 dtd. 17.12.11
|
15 Nos. Self-Propelled Hydraulic Lift.
|
17.12.11
|
17.12.11
|
19.01.2012 up to 11.00 hrs.
|
19.01.2012 at 11.30 hrs.
|
Rs.61,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/TRAVERSER/007 dtd. 11.08.11
|
03 Nos. (50MT) & 04 Nos. (80MT) Traversers for RCF-RBL Project
|
11.08.11
|
11.08.11
|
02.09.2011 up to 16.00 hrs. Changed to 12.09.2011 up to 16.00 hrs.
|
02.09.2011 at 16.30 hrs. Changed to 12.09.2011 at 16.30 hrs.
|
Rs.5,00,000.00
|
|
|
IRCON/MECH/1029/ RCF-RBL-II/Stretch Bend Forming/33 dated 08.10.11
|
01 No. Stretch Bend Forming machine for RCF-RBL Project.
|
08.10.11
|
08.10.11
|
08.11.2011 up to 11.00 hrs. Changed to 15.11.2011 up to 14.00 hrs. Changed to 29.11.2011 up to 14.00 hrs.
|
08.11.2011 at 11.30 hrs. Changed to 15.11.2011 at 14.30 hrs. Changed to 29.11.2011 at 14.30 hrs.
|
Rs.4,75,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ 3D CMM/56 dtd.17.12.11
|
01 No. 3D Co-ordinate Measuring Machine
|
17.12.11
|
17.12.11
|
18.01.2012 up to 11.00 hrs. Changed to 06.02.2012 up to 11.00 hrs.
|
18.01.2012 at 11.30 hrs. Changed to 06.02.2012 at 11.30 hrs.
|
Rs.2,25,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Ambulance/027 dtd. 11.08.11
|
01 No. Ambulance for RCF-RBL Project
|
11.08.11
|
11.08.11
|
01.09.2011 up to 16:00 hrs.
|
01.09.2011 up to 16:30 hrs.
|
Rs.4,100
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Bogie Frame Machining Centre/73 & 17.02.12
|
02 Nos. BOGIE FRAME MACHINING CENTRE for RCF RBL Project.
|
17.02.12
|
17.02.12
|
04.04.2012 up to 11.00 hrs. Changed to 17.04.2012 up to 11.00 hrs. Changed to 20.04.2012 up to 11.00 hrs.
|
04.04.2012 at 11.30 hrs. Changed to 17.04.2012 at 11.30 hrs. Changed to 20.04.2012 at 11.30 hrs.
|
Rs.25,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Bolster Machining/42 dtd.08.09.11
|
02 Nos. Bolster Machining Centre for RCF-RBL Project.
|
08.09.11
|
08.09.11
|
30.09.2011 up to 16.00 hrs. Changed to 11.10.2011 up to 16.00 hrs.
|
30.09.2011 at 16.30 hrs. Changed to 11.10.2011 at 16.30 hrs.
|
Rs.25,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Compressor/22 & 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 06 Nos. 1000 cfm Electric Screw Type Air Compressors
|
07.07.11
|
07.07.11
|
28.07.2011 up to 16.00 hrs.
|
28.07.2011 at 16.30 hrs.
|
Rs.81,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Compressor/RET/22 dtd.17.12.11
|
06 Nos. Electric Driven Screw Type Air Compressors
|
17.12.11
|
17.12.11
|
09.01.2012 up to 11.00 hrs. Changed to 17.01.2012 up to 11.00 hrs.
|
09.01.2012 at 11.30 hrs. Changed to 17.01.2012 at 11.30 hrs.
|
Rs.81,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Edge Milling/12
|
01 No. CNC Edge Milling Machine for RCF-RBL Project
|
11.08.11
|
11.08.11
|
02.09.2011 up to 14.00 hrs. Changed to 15.09.2011 up to 14.00 hrs.
|
02.09.2011 at 14.30 hrs. Changed to 15.09.2011 at 14.30 hrs.
|
Rs.5,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Fire Fighting Equipment/49 & 17.02.12
|
01 No. Water Mist Fire Fighting System Mounted on Four Wheeler, 01 No. Water Bowser Mounted on Four Wheeler, 01 No. Fire Pump mounted on Four Wheeler & 01 No. Multi-Purpose Water Tender for RCF RBL Project.
|
17.02.12
|
17.02.12
|
14.03.2012 up to 11:00 hrs. Changed to 26.03.2012 up to 11.00 hrs.
|
14.03.2012 up to 11:30 hrs. Changed to 26.03.2012 at 11.30 hrs.
|
Rs.65,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Folding/08
|
02 Nos. CNC Folding Machines for RCF-RBL Project
|
11.08.11
|
11.08.11
|
02.09.2011 up to 11:00 hrs.
|
02.09.2011 up to 11:30 hrs.
|
Rs.2,75,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Horizontal, Vertical Universal Milling Machine/48 dtd. 17.12.11
|
01 No. Horizontal, 01 No. Vertical & 02 Nos. Universal Milling Machine
|
17.12.11
|
17.12.11
|
16.01.2012 up to 11.00 hrs.
|
16.01.2012 at 11.30 hrs.
|
Rs.46,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Hyd. Press Brake/21 dtd.11.08.11
|
07 nos. CNC Hydraulic Press Brake Machines for RCF-RBL Project
|
11.08.11
|
11.08.11
|
05.09.2011 up to 14.00 hrs. Changed to 14.09.2011 up to 14.00 hrs. Changed to 30.09.2011 up to 14.00 hrs. Changed to 13.10.2011 up to 16.00 hrs. Changed to 24.10.2011 up to 16.00 hrs. Changed to
|
05.09.2011 at 14.30 hrs. Changed to 14.09.2011 at 14.30 hrs. Changed to 30.09.2011 at 14.30 hrs. Changed to 13.10.2011 at 16.30 hrs. Changed to 24.10.2011 at 16.30 hrs. Changed to 31.10.2011 at 16.30
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ IVS/58 dtd 17.12.11
|
02 Nos. Industrial Vacuum Sweeper
|
17.12.11
|
17.12.11
|
12.01.2012 up to 11.00 hrs.
|
12.01.2012 at 11.30 hrs.
|
Rs.28,500.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Laser Cutting & Welding/05
|
02 Nos. CNC Laser Cutting and Welding machines for RCF-RBL Project
|
11.08.11
|
11.08.11
|
09.09.2011 up to 11.00 hrs. Changed to 19.09.2011 up to 11.00 hrs. Changed to 23.09.2011 up to 11.00 hrs.
|
09.09.2011 at 11.30 hrs. Changed to 19.09.2011 at 11.30 hrs. Changed to 23.09.2011 at 11.30 hrs.
|
Rs.25,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Lathe Machines/62 & 17.02.12
|
01 No. Heavy Duty Turret Lathe & 03 Nos. Lathe Machines for RCF RBL Project.
|
17.02.12
|
17.02.12
|
15.03.2012 up to 11.00 hrs.
|
15.03.2012 at 11.30 hrs.
|
Rs.52,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Paint Plant/26 dtd. 08.09.11
|
Complete Painting System for Railway Passenger Coaches for RCF-RBL Project.
|
08.09.11
|
08.09.11
|
03.10.2011 up to 11.00 hrs.
|
03.10.2011 at 11.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Plate Straitening/16 dtd.11.08.11
|
01 No. Plate Straightening Machine for RCF-RBL Project
|
11.08.11
|
11.08.11
|
01.09.2011 up to 14:00 hrs. Changed to 13.09.2011 up to 14.00 hrs.
|
01.09.2011 up to 14:30 hrs. Changed to 13.09.2011 at 14.30 hrs.
|
Rs.4,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ RADIAL DRILL/13-RET dtd.08.09.11
|
05 Nos. Radial Drilling Machines for RCF-RBL Project.
|
08.09.11
|
08.09.11
|
30.09.2011 up to 11.00 hrs. Changed to 14.10.2011 up to 11.00 hrs.
|
30.09.2011 at 11.30 hrs. Changed to 14.10.2011 at 11.30 hrs.
|
Rs.2,45,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Spectrometer/68 & dated 21.01.12
|
01 no. Optical Emission Spectrometer for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
23.02.2012 up to 11.00 hrs.
|
23.02.2012 at 11.30 hrs.
|
Rs.22,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Spot Welding/41 dtd.08.09.11
|
01 No. CNC Robotic Spot Welding Machine for RCF-RBL Project.
|
08.09.11
|
08.09.11
|
03.10.2011 up to 14:00 hrs. Changed to 11.10.2011 up to 14.00 hrs.
|
03.10.2011 up to 14:30 hrs. Changed to 11.10.2011 at 14.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ Under Water Plasma/14 dtd.11.08.11
|
02 Nos. CNC (under water) Plasma Profile Cutting Machines for RCF-RBL Project.
|
11.08.11
|
11.08.11
|
01.09.2011 up to 11:00 hrs.
|
01.09.2011 up to 11:30 hrs.
|
Rs.5,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ WHEEL AXLE ASSY LINE/95 & 17.02.12
|
INTEGRATED WHEEL & AXLE MACHINING AND ASSEMBLY LINE WITH SYNCHRONIZED AND AUTOMATED MATERIAL HANDLING SYSTEM FOR WHEEL SHOP for RCF RBL Project.
|
17.02.12
|
17.02.12
|
09.04.2012 up to 11.00 hrs. Changed to 23.04.2012 up to 11.00 hrs.
|
09.04.2012 at 11.30 hrs. Changed to 23.04.2012 at 11.30 hrs.
|
Rs.25,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II//CNC DCGSM/63 & dated 21.01.12
|
01 no. CNC Hydraulic Double Column Guillotine Shearing Machine for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
22.02.2012 up to 11.00 hrs. Changed to 27.02.2012 up to 11.00 hrs.
|
22.02.2012 at 11.30 hrs. Changed to 27.02.2012 at 11.30 hrs.
|
Rs.30,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II//Compressed Air/28 dtd.17.12.11
|
PIPELINES FOR COMPRESSED AIR SUPPLY SYSTEM IN FINISHING, FURNISHING AND CARPENTRY SHOP
|
17.12.11
|
17.12.11
|
06.01.2012 up to 14.00 hrs.
|
06.01.2012 at 14.30 hrs.
|
Rs.1,57,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II//Hydraulic Press 50 T/84 & dated 21.01.12
|
01 No. Hydraulic Press 50 T for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
16.02.2012 up to 11.00 hrs.
|
16.02.2012 at 11.30 hrs.
|
Rs.8,100.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II//Laser Cutting/RET/06 & 17.02.12
|
02 Nos.CNC Laser Cutting Machines for RCF/RBL Project.
|
17.02.12
|
17.02.12
|
13.03.2012 up to 11.00 hrs.
|
13.03.2012 at 11.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II//Mechanical Shearing Machine/RET/54 dtd.17.12.11
|
01 No. Mechanical Shearing Machine
|
17.12.11
|
17.12.11
|
11.01.2012 up to 11.00 hrs.
|
11.01.2012 at 11.30 hrs.
|
Rs.12,500.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/3D CMM (BOGIE SHOP)/71 & 17.02.12
|
01 No. 3-D Co-ordinate Measuring Machine for Bogie Shop for RCF RBL Project.
|
17.02.12
|
17.02.12
|
23.03.2012 up to 11.00 hrs. Changed to 04.04.2012 up to 15.00 hrs. Changed to 18.04.2012 up to 11.00 hrs. Changed to 03.05.2012 up to 11.00 hrs. Changed to 16.05.2012 up to 15.00 hrs.
|
23.03.2012 at 11.30 hrs. Changed to 04.04.2012 at 15.30 hrs. Changed to 18.04.2012 at 11.30 hrs. Changed to 03.05.2012 at 11.30 hrs. Changed to 16.05.2012 at 15.30 hrs.
|
Rs.2,25,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Bogie Shot Blasting/20 & dt. 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 01 No. Bogie Shot Blasting Machine for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
29.07.2011 up to 16.00 hrs.
|
29.07.2011 at 16.30 hrs.
|
Rs.93,500.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Carbide Tip Saw Sharpening Machine & Circular Saw/52 Dated:08.10.11
|
02 Nos. Circular Saw & 01 No. Carbide Tip Saw Sharpening Machine for RCF-RBL Project.
|
08.10.11
|
08.10.11
|
31.10.2011 up to 11.00 hrs.
|
31.10.2011 at 11.30 hrs.
|
Rs.60,100.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/CNC Gas Cutting/11 & dt.07.07.2011
|
Supply AND Erection, Installation & Commissioning of 01 No. CNC Gas (oxy-acetylene) Cutting Machine for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
01.08.2011 up to 14.00 hrs.
|
01.08.2011 at 14.30 hrs.
|
Rs.35,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Cut To Length/10 dtd. 11.08.11
|
01 No.Slitter Cum Cut to Length Combination line for RCF-RBL Project
|
11.08.11
|
11.08.11
|
09.09.2011 up to 14.00 hrs. Changed to 19.09.2011 up to 14.00 hrs. Changed to 29.09.2011 up to 14.00 hrs. Changed to 13.10.2011 up to 14.00 hrs. Changed to 24.10.2011 up to 14.00 hrs. Changed to 0
|
09.09.2011 at 14.30 hrs. Changed to 19.09.2011 at 14.30 hrs. Changed to 29.09.2011 at 14.30 hrs. Changed to 13.10.2011 at 14.30 hrs. Changed to 24.10.2011 at 14.30 hrs. Changed to 08.11.2011 at 14.30
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/EOT CRANES/44 & dated 21.01.12
|
Electric Overhead Travelling Cranes (20T – 08 nos, 15T – 04 nos, 10T – 10 nos, 5T- 13 nos.)for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
21.02.2012 up to 11.00 hrs.
|
21.02.2012 at 11.30 hrs.
|
Rs.10,00,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Fork Lift/23 & dt. 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 25 nos. 3 Ton, 25 nos. 5 Ton & 2 nos. 10 Ton Diesel Fork Lift Trucks for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
28.07.2011 up to 11.00 hrs.
|
28.07.2011 at 11.30 hrs.
|
Rs.2,49,875.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Hyd.Crane & Pick & Carry Crane /53 Dated 08.10.2011
|
Road Mobile Cranes Capacity 01 no. 5 MT , 01 no. 10 MT & 01 no. 40 MT for RCF-RBL Project.
|
08.10.11
|
08.10.11
|
11.11.2011 up to 15:00
|
11.11.2011 at 15:30
|
Rs.1,27,200.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Pin Welding/91 & dated 21.01.12
|
06 Nos. Pin Welding Machines for RCF-RBL Project.
|
21.01.12
|
21.01.12
|
13.02.2012 up to 11.00 hrs. Changed to 23.02.2012 up to 11.00 hrs.
|
13.02.2012 at 11.30 hrs. Changed to 23.02.2012 at 11.30 hrs.
|
Rs.8,500/-
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Radial Drill/13 & dt.07.07.2011
|
Supply AND Erection, Installation & Commissioning of 05 nos. Radial Drilling Machines for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
28.07.2011 up to 14.00 hrs.
|
28.07.2011 at 14.30 hrs.
|
Rs.2,45,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/ROAD MOBILE CRANE/RET/53 dtd 17.12.2011
|
Road Mobile Cranes Capacity 01 no. 5 MT & 01 no. 10 MT.
|
17.12.11
|
17.12.11
|
13.01.2012 up to 11.00 hrs.
|
13.01.2012 at 11.30 hrs.
|
Rs.8,600.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/RRV/24 & 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 01 No. 600 MT Rail Cum Road Vehicle for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
29.07.2011 up to 14.00 hrs.
|
29.07.2011 at 14.30 hrs.
|
Rs.1,43,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Skin Tensioning/15 & dt.07.07.11
|
Supply AND Erection, Installation & Commissioning of 06 Nos. Skin tensioning Equipments for RCF-RBL Project.
|
07.07.11
|
07.07.11
|
01.08.2011 up to 16.00 hrs.
|
01.08.2011 at 16.30 hrs.
|
Rs.3,96,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Static Bogie Load Testing/9 & 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 02 Nos. Static Bogie Load Machines.
|
07.07.11
|
07.07.11
|
01.08.2011 up to 11.00 hrs.
|
01.08.2011 at 11.30 hrs.
|
Rs.63,800.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Turning Centre/Ret-18-A & dated 21.01.12
|
01 No. CNC Turning Centre for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
17.02.2012 up to 11:00 hrs.
|
17.02.2012 up to 11:30 hrs.
|
Rs.1,38,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBL-II/Weigh Bridge/19 dtd. 07.07.2011
|
Supply AND Erection, Installation & Commissioning of 01 no. 100 MT & 01 no. 50 MT Electronic Road Weigh Bridge
|
07.07.11
|
07.07.11
|
29.07.2011 up to 11.00 hrs.
|
29.07.2011 at 11.30 hrs.
|
Rs.81,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBLII/ Mechanical Shearing Machine/RET 1-54 & dated 21.01.12
|
01 No. Mechanical Shearing Machine for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
14.02.2012 up to 11.00 hrs.
|
14.02.2012 at 11.30 hrs.
|
Rs.12,500.00
|
|
|
IRCON/MECH/1029/ RCF.RBLII/ Mechanical Shearing Machine/54 Dated 08.10.2011
|
02 Nos. Mechanical Shearing Machines for RCF.RBL Project.
|
08.10.11
|
08.10.11
|
31.10.2011 up to 16.00 hrs.
|
31.10.2011 at 16.30 hrs.
|
Rs.19,000.00
|
|
|
IRCON/MECH/1029/ RCF.RBLII/ Radial Drill/RET II-13 & 17.02.12
|
04 Nos. of Radial Drilling Machines for RCF RBL Project.
|
17.02.12
|
17.02.12
|
09.03.2012 up to 11.00 hrs. Changed to 12.03.2012 up to 15.00 hrs.
|
09.03.2012 at 11.30 hrs. Changed to 12.03.2012 at 15.30 hrs.
|
Rs.78,000.00
|
|
|
IRCON/MECH/1029/RCF RBL/AIR PIPELINES/29
|
NOTICE INVITING TENDER (NIT) FOR SUPPLY, ERECTION, TESTING & COMMISSIONING OF COMPRESSED AIR PIPELINES (INCLUDING STRUCTURAL STEEL WORKS) FOR RAIL COACH FACTORY (RCF) PROJECT AT RAE BARELI IN UTTAR PRADESH (INDIA)
|
19.11.10
|
19.11.10
|
10.12.2010 up to 15.30 hrs.
|
10.12.2010 at 16.00 hrs.
|
20,500
|
|
|
IRCON/MECH/1029/RCF-RBL-II/Pipe Bending/17 dated 06.07.2011
|
Supply AND Erection, Installation & commissioning of 01 NO. CNC Pipe Bending M/c for RCF Rae Bareli (UP)
|
07.07.11
|
07.07.11
|
06.08.2011 up to 11.00 hrs. Changed to 23.08.2011 up to 15.30 hrs.
|
06.08.2011 at 11.30 hrs. Changed to 23.08.2011 at 16.00 hrs.
|
86,000/-
|
|
|
IRCON/MECH/1029/RCF-RBL-II/Turning Centre/18 dated 06.07.2011
|
Supply AND Erection, Installation & Commissioning of 01 No CNC Turning Centre for RCF Rae Bareli
|
07.07.11
|
07.07.11
|
06.08.2011 up to 15.30 hrs. Changed to 16.08.2011 up to 15.30 hrs. Changed to 24.08.2011 up to 15.30 hrs.
|
06.08.2011 at 16.00 hrs. Changed to 16.08.2011 at 16.00 hrs. Changed to 24.08.2011 at 16.00 hrs.
|
1,38,000/-
|
|
|
IRCON/MECH/1029/RCF-RBL/CON/02 dated 22.10.2011
|
Mechanical Consultancy Work-Stage -II for RCF-RBL Project.
|
22.10.11
|
22.10.11
|
25.11.2011 up to 15.00 hrs.
|
25.11.2011 at 15.30 hrs.
|
Rs.50,000.00
|
|
|
IRCON/MECH/1029/RCF-RBL/LIFTING TACKLE/33
|
NOTICE INVITING TENDER FOR SUPPLY, ERECTION, TESTING & COMMISSIONING OF 02 NOS LIFTING TACKLE AT RCF PROJECT, RAE BARELI IN U.P. (INDIA)
|
26.11.10
|
26.11.10
|
16.12.2010 up to 15.30 hrs.
|
16.12.2010 at 16.00 hrs.
|
5000
|
|
|
IRCON/MECH/1029/RCF-RBL/LOCKERS/RET-II/39, Dated 24.05.2011
|
Supply, testing & commissioning of 50 NOS. LOCKER CABINETS (EACH LOCKER CABINET CONSISTS 12 LOCKERS) for our Project at Rail coach factory (RCF), Rae Bareli, (UP), India
|
24.05.11
|
25.05.11
|
14.06.2011 up to 15.30 hrs. Changed to 21.06.2011 up to 15.30 hrs.
|
14.06.2011 at 16.00 hrs. Changed to 21.06.2011 at 16.00 hrs.
|
8000
|
|
|
IRCON/MECH/1029/RCF.RBL-II/ Carpentry Shop Equipment’s/52 & dated 21.01.1
|
Carpentry Shop Equipment’s (i.e. 02 nos. Circular Saw, 01 no. Carbide Tip Saw Sharpening Machine, 01 no. High Speed Table Bend Saw, 01 no. Bench Mounted Drill, 01 No. Hydraulic Cross Cut Saw)for RCF/RBL Project.
|
21.01.12
|
21.01.12
|
15.02.2012 up to 11.00 hrs.
|
15.02.2012 at 11.30 hrs.
|
Rs.18,000/-
|
|
|
IRCON/MECH/1029/RCF.RBL-II/ FOLDING/RET/08 & 17.02.12
|
02 Nos. CNC Folding Machines for RCF RBL Project.
|
17.02.12
|
17.02.12
|
12.03.2012 up to 11.00 hrs.
|
12.03.2012 at 11.30 hrs.
|
Rs.3,00,000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Bogie Painting line/75 & 17.02.12
|
Bogie Frame and Bogie Bolster Shot Blasting and Painting System for RCF RBL Project.
|
17.02.12
|
17.02.12
|
29.03.2012 up to 11.00 hrs. Changed to 12.04.2012 up to 11.00 hrs. Changed to 26.04.2012 up to 11.00 hrs. Changed to 30.04.2012 up to 11.00 hrs.
|
29.03.2012 at 11.30 hrs. Changed to 12.04.2012 at 11.30 hrs. Changed to 26.04.2012 at 11.30 hrs. Changed to 30.04.2012 at 11.30 hrs.
|
Rs.5,00,000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Box Pallets/78 dated 17.04.2012
|
5000 Nos. Box Type Pallets for RCF RBL Project.
|
17.04.12
|
17.04.12
|
16.05.2012 up to 11.00 hrs.
|
16.05.2012 at 11.30 hrs.
|
Rs.3,00,000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Load Lifting & Turning device/119 dated 17.04.2012
|
(01 No.) Load Lifting & Turning Device for RCF RBL Project.
|
17.04.12
|
19.04.12
|
15.05.2012 up to 15:00 hrs.
|
15.05.2012 up to 15:30 hrs.
|
Rs.28,000/-
|
|
|
IRCON/MECH/1029/RCF.RBL-II/locker cabinet/110 dated 17.04.2012
|
(200 Nos) Lockers Cabinet for RCF RBL Project.
|
17.04.12
|
19.04.12
|
14.05.2012 up to 15.00 hrs.
|
14.05.2012 at 15.30 hrs.
|
Rs.13,000/-
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Platform Truck/61 dated 17.12.2011
|
03 Nos. Battery Operated Platform Truck.
|
17.12.11
|
17.12.11
|
23.01.2012 up to 11.00 hrs.
|
23.01.2012 at 11.30 hrs.
|
Rs.5000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/Road Mobile Rough Terrain Crane/RET/80 dtd 17.12.2011
|
01 no. 40 MT Road Mobile Rough Terrain Crane.
|
17.12.11
|
17.12.11
|
20.01.2012 up to 11.00 hrs.
|
20.01.2012 at 11.30 hrs.
|
Rs.1,19,000.00
|
|
|
IRCON/MECH/1029/RCF.RBL-II/ROBOTIC WELDING CENTRE/43
|
Supply, Erection, Testing & Commissioning of 01 No. Robotic Welding Centre for RCF/RBL Project.
|
08.10.11
|
08.10.11
|
30.11.2011 up to 11:00 hrs. changed to 07.12.2011 up to 11:00 hrs.
|
30.11.2011 at 11:30 hrs. changed to 07.12.2011 at 11:30 hrs.
|
1000000
|
|
|
IRCON/MECH/P&E/DISPOSAL/2011/381
|
Disposal of Old/Used Plant & Machinery, Material, Waste and Scrap.
|
09.08.11
|
12.08.11
|
02.09.2011 up to 14:00 hrs.
|
02.09.2011 up to 14:30 hrs.
|
10% of total bid value
|
|
|
IRCON/MECH/P&E/DISPOSAL/89PE/394 DTD 19.12.2011
|
SALE OF PLANT & MACHINERY ON 'AS IS WHERE IS BASIS'
|
19.12.11
|
19.12.11
|
07.02.2012 up to 15.00 hrs.
|
07.02.2012 at 15.30 hrs.
|
10% of total bid value
|
|
|
IRCON/MECH/P&E/PROCURE/SL/CRA/05
|
SUPPLY, TESTING & COMMISSIONING OF
1 No PICK N CARRY CRANE FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
04.03.2011 up to 15.30 hrs.
|
04.03.2011 at 16.00 hrs.
|
Rs 6250
|
|
|
IRCON/MECH/P&E/PROCURE/SL/ECL/01
|
SUPPLY, TESTING & COMMISSIONING OF
02 NOS BACKHOE LOADER FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
01.03.2011 up to 15.30 hrs.
|
01.03.2011 at 16.00 hrs.
|
Rs 20000
|
|
|
IRCON/MECH/P&E/PROCURE/SL/FLT/04
|
SUPPLY, TESTING & COMMISSIONING OF
01 NO FORK LIFT TRUCK FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
03.03.2011 up to 15.30 hrs.
|
03.03.2011 at 16.00 hrs.
|
Rs 5500
|
|
|
IRCON/MECH/P&E/PROCURE/SL/GOLIATH CRANE/396 DTD 19.12.2011
|
Supply, Installation, Testing & Commissioning of 2 Nos. Electrically Operated Single Girder Goliath Crane for Sri Lanka Project.
|
19.12.11
|
19.12.11
|
09.01.2012 up to 15.30 hrs.
|
09.01.2012 at 16.00 hrs.
|
Rs 27,000/-
|
|
|
IRCON/MECH/P&E/PROCURE/SL/MOB/07
|
SUPPLY, TESTING & COMMISSIONING OF
01 NO MOBILE WORKSHOP FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
10.02.11
|
08.03.2011 up to 15.30 hrs.
|
08.03.2011 at 16.00 hrs.
|
Rs 23500
|
|
|
IRCON/MECH/P&E/PROCURE/SL/TIP/02
|
SUPPLY, TESTING & COMMISSIONING OF
10 NOS TIPPERS FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
09.03.2011 up to 11.30 hrs.
|
09.03.2011 at 12.00 hrs.
|
Rs 82500
|
|
|
IRCON/MECH/P&E/PROCURE/SL/TRA/03
|
SUPPLY, TESTING & COMMISSIONING OF
01 NO TRAILER FOR SRI LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
09.03.2011 up to 15.30 hrs.
|
09.03.2011 at 16.00 hrs.
|
Rs 11500
|
|
|
IRCON/MECH/P&E/PROCURE/SL/TTD/06
|
SUPPLY, TESTING & COMMISSIONING OF
01 NO TRACTOR WITH TROLLEY AND DOZER ATTACHMENT FOR SRI
LANKA RAIL PROJECT
|
07.02.11
|
09.02.11
|
07.03.2011 up to 15.30 hrs. Changed to 15.03.2011 up to 15.30 hrs.
|
07.03.2011 at 16.00 hrs. Changed to 15.03.2011 at 16.00 hrs.
|
Rs 5750
|
|
|
IRCON/MECH/P&E/PROCURE/TYRES/SL/376 dt.09.06.11
|
supply of Tyres for Vehicles and Construction Machinery on CIF
Colombo Port basis for our Rail Project in Sri Lanka
|
09.06.11
|
10.06.11
|
29.06.2011 up to 15.30 hrs.
|
29.06.2011 at 16.00 hrs.
|
60,100
|
|
|
IRCON/MECH/P&E/PROCURE/TYRES/SL/RET/380 dt.04.07.2011
|
Supply of tyres for vehicles and construction machinery on CIF colombo port basis for our Rail Project in Sri Lanka.
|
05.07.11
|
05.07.11
|
26.07.2011 up to 15:30 hrs. Changed to 01.08.2011 up to 15.30 hrs.
|
26.07.2011 up to 16:00 hrs. Changed to 01.08.2011 at 16.00 hrs.
|
60,100
|
|
|
IRCON/MECH/SLR/LOCO/WHEEL DISCS-1
|
SUPPLY OF MONO BLOCK FORGED WHEEL DISC
|
19.12.11
|
19.12.11
|
19.01.2012 up to 15:30 hrs.
|
19.01.2012 up to 16:00 hrs.
|
Rs 40,000/-
|
|
|
IRCON/SZ/BLR.PLOT/RO-BLDG/01
|
Construction of Office Buildidng cum Commercial Complex for IRCON at Plot No. 4121/Q, H.A.L. 2nd Stage, Old Airport Road, Bangalore.
|
30.10.11
|
31.10.11
|
22.11.2011 up to 15.00 hrs.
|
22.11.2011 at 15.30 hrs.
|
Rs. 55,800/-
|
|
|
IRCON/WZ/MRO/FLATS/SALE/01/Oshiwara
|
SALE of Unfurnished flat in Oshiwara, Mumbai
|
18.02.11
|
22.02.11
|
14.03.2011 up to 17.00 hrs.
|
17.03.2011 at 15.00 hrs.
|
10%
|
|
|
IRCON/WZ/MRO/FLATS/SALE/01/Parel
|
SALE of Unfurnished flat in Parel, Mumbai
|
18.02.11
|
22.02.11
|
14.03.2011 up to 17.00 hrs.
|
15.03.2011 at 15.00 hrs.
|
10%
|
|
|
IRCON/WZ/MRO/FLATS/SALE/01/Sanpada
|
SALE of Unfurnished flat in Sanpada, Mumbai
|
18.02.11
|
22.02.11
|
14.03.2011 up to 17.00 hrs.
|
16.03.2011 at 15.00 hrs.
|
10%
|
|
|
IRCONISL/LEASE/MFC/East/01
|
Leasing of Multi Functional Complexes (MFCs) in the State of West Bengal-Operation & Maintenanace.
|
17.01.11
|
18.01.11
|
09.02.2011 up to 15:00 hrs. Changed to 14.02.2011 up to 15.00 hrs. Changed to 18.02.2011 up to 15.00 hrs.
|
09.02.2011 up to 15:30 hrs. Changed to 14.02.2011 at 15.30 hrs. Changed to 18.02.2011 at 15.30 hrs.
|
as per Tender NIT
|
|
|
IRCONISL/LEASE/MFC/East/02
|
Leasing of Multi Functional Complexes (MFCs) in the state of West Bengal: Operation and Maintenance
|
12.07.11
|
14.07.11
|
04.08.2011 up to 15.00 hrs. Changed to 11.08.2011 up to 15.00 hrs.
|
04.08.2011 at 15.30 hrs. Changed to 11.08.2011 at 15.30 hrs.
|
As per NIT.
|
|
|
NIT IRCON/1008/J&K-DLI/Quarters-Anantnag/Q-6 Dt. 07.02.2011
|
Construction Of RPF Quarters Type-II, III and IV units at Anantnag on Qazigund - Baramulla New BG Rail Line Project(J&K) (Package: Q - 6)
|
07.02.11
|
09.02.11
|
01.03.2011 up to 15.00 hrs.
|
01.03.2011 at 15.30 hrs.
|
243000
|
|
|
NIT IRCON/1008/J&K-DLI/Quarters-Budgam/Q-7 Dt. 09.02.2011
|
Construction Of RPF Quarters Type-II, III and IV units at Budgam on Qazigund - Baramulla New BG Rail Line Project(J&K) (Package: Q - 7)
|
09.02.11
|
10.02.11
|
03.03.2011 up to 15.00 hrs.
|
03.03.2011 at 15.30 hrs.
|
405000
|
|
|
NIT IRCON/1008/J&K-DLI/Quarters-Srinagar/Q-8 Dt. 11.02.2011
|
Construction Of RPF Quarters Type-II, III IV and V units at Srinagar on Qazigund - Baramulla New BG Rail Line Project(J&K) (Package: Q - 8
|
11.02.11
|
11.02.11
|
08.03.2011 up to 15.00 hrs.
|
08.03.2011 at 15.30 hrs.
|
415000
|
|
|
NIT No: IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-23 Dated 04.11.2011
|
Construction of External Sewerage, Drainage and Water supply works including Overhead Water Tanks for the Rail coach Factory Raebareli complex at Lalganj
|
04.11.11
|
08.11.11
|
30.11.2011 up to 12.00 hrs.
|
30.11.2011 at 12.30 hrs.
|
1000000
|
|
|
No IRCON/CC/TN/SR/11/ 623 Dt. 05.04.2011
|
Detailed Design Consultancy, 3D Monitoring & Supervision of Tunnel T-5 (Between Km 11+671 to Km 13+764) & Tunnel T-6 (Between Km 14+934 to Km 18+884 ) in connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) new Single line BG Railway Line Project.
|
06.04.11
|
13.04.11
|
11.05.2011 up to 15.00 hrs. Changed to 31.05.2011 up to 15.00 hrs.
|
11.05.2011 at 15.30 hrs. Changed to 31.05.2011 at 15.30 hrs.
|
Rs. 5,00,000.00
|
|
|
No IRCON/CC/TN/SR/11/622 Dt. 18.03.2011
|
Detailed Design Consultancy, 3D Monitoring & Construction Supervision of Tunnel T-3 (Between Km 5+917 & 7+174) & Tunnel T-4 (Between Km ( 7+360 & 11+326 ) in connection with Construction of Sivok (West Bengal) to Rangpo (Sikkim) new BG Railway Line Project.
|
18.03.11
|
24.03.11
|
18.04.2011 up to 15.00 hrs. Changed to 29.04.2011 up to 15.00 hrs.
|
18.04.2011 at 15.30 hrs. Changed to 29.04.2011 at 15.30 hrs.
|
Rs 5,00,000.00
|
|
|
No. IRCON/ELECT/1029/RCF-RBL/DT-750/21
|
SUPPLY OF 750kVA, 11/0.433kV, DISTRIBUTION TRANSFORMERS FOR RAIL COACH FACTORY, RAE BARELI (UP).
|
02.09.11
|
02.09.11
|
26.09.2011 up to 15.00 hrs.
|
26.09.2011 at 15.30 hrs.
|
Rs.1,05,000/-
|
|
|
No. IRCON/CC/TN/SR/11/625 Dated 06.05.2011
|
Geotechnical investigation including drilling of Boreholes, testing of sample etc for construction of Sivok-Rangpo New BG Rail line Project”
|
06.05.11
|
10.05.11
|
30.05.2011 up to 15.00 hrs.
|
30.05.2011 at 15.30 hrs.
|
Rs 1,74,000.00
|
|
|
NO. IRCON/Elect./1029/RCF-RBL/TOWNSHIP & CSS/17
|
Supply and erection of HT, LT Power supply distribution system, Cabling & street lighting etc. for RCF, Rae Bareli (UP).
|
21.04.11
|
21.04.11
|
09.05.2011 up to 15.00 hrs.
|
09.05.2011 at 15.30 hrs.
|
RS.1,30,000/-
|
|
|
NO. IRCON/Elect./1029/RCF-RBL/Train Ltg & Stores/15
|
SUPPLY AND ERECTION OF ELECTRICAL EQUIPMENTS FOR COMPLETE ELECTRIFICATION OF TRAIN LIGHTING & CARPENTRY SHOPS, GENERAL STORE , MAIN FURNISHING AND SHELL STORE INCLUDING PART OF STREET LIGHTING IN WORKSHOP AREA AT RCF, RAEBARELI, (UP)
|
18.04.11
|
19.04.11
|
02.05.2011 up to 15.00 hrs.
|
02.05.2011 at 15.30 hrs.
|
Rs. 45,000/-
|
|
|
No. IRCON/ELECT/5013/CUNCOLIM/FIRE PROTECTION/36
|
Supply, installation, testing and commissioning of Fire Protection System for 220/33 kV, 3X50 MVA Substation at Cuncolim for Goa Electricity Department
|
26.12.11
|
26.12.11
|
16.01.2012 up to 15.00 hrs. Changed to 23.01.2012 up to 15.00 hrs.
|
16.01.2012 at 15.30 hrs. Changed to 23.01.2012 at 15.30 hrs.
|
Rs. 42,000/-
|
|
|
No.: IRCON/CC/TN/ROB-RAJ/CONSULT-III/3015/11/634 Date: 21.07.2011
|
Carrying out Consultancy work for Road over Bridge including detail design, estimate, BOQ working drawing, quality control complete as desired in scope of work for 7 ROBs of Rajasthan i.e ROB at LC No.160 at Jodhpur, ROB at LC No. C-2 at Jodhpur, ROB at LC No. 168 at Jodhpur, ROB at LC No. 18 at Jodhpur, ROB at LC No. 165 at Jodhpur, ROB at LC No.95 at Suratgarh, ROB at LC No. 119 at Sri Ganganagar.
|
21.07.11
|
21.07.11
|
12.08.2011 up to 15.00 hrs. Changed to 18.08.2011 up to 15.00 hrs.
|
12.08.2011 at 15.30 hrs. Changed to 18.08.2011 at 15.30 hrs.
|
3,25,000
|
|
|
No.:IRCON/3015/TN/ROB-Kota-Foundation/11/05 Date: 02.08.2011
|
Tender for Carrying out Pile foundations, bored cast-in- situ RCC piles of 1.2m dia, using piling rig for execution of via-duct spans of Road over Bridge of Kota in lieu of LC. No. 108, including load testing of piles as per codal provisions.
|
03.08.11
|
05.08.11
|
19.08.2011 up to 15.00 hrs.
|
19.08.2011 at 15.30 hrs.
|
150000
|
|
|
NO.IRCON/J&K-Cell/JAT/ 15/1014/CABLES/T-80(Package- CS-II) DATE: 18/10/11
|
“SUPPLY OF 1CX95 SQ. MM, 11KV HT , XLPE,COPPER,
CABLES N2XHS(F)2Y TYPE” FOR POWER SUPPLY ARRANGEMENT INSIDE OF TUNNEL T-80 ,11/0.433 KV,500 KVA SUB-STATION OF USBRL PROJECT AT BANIHAL,DIST.-RAMBAN (J&K).
|
18.10.11
|
24.10.11
|
14.11.2011 up to 15.00 hrs.
|
14.11.2011 at 15.30 hrs.
|
Rs 3.88 Lacs
|
|
|
Tender No: IRCON/Civil/1029/RCF-RBL/ASS-CIVIL/OT/7000/07 Dt. 29.09.2011
|
Construction of Auxiliary Sub-Station Buildings in Factory Area in connection with construction of Rail Coach Factory Raebareli, at Lalganj, Raebareli, (UP).
|
29.09.11
|
01.10.11
|
21.10.2011 up to 15.00 hrs.
|
21.10.2011 at 15.30 hrs.
|
2,90,000
|
|
|
Tender No: IRCON/Civil/1029/RCF-RBL/Comp. Room/7000/OT/04
|
Construction of Compressor rooms in Factory area for Rail Coach Factory at Lalganj, Raebareli, (UP).
|
26.07.11
|
27.07.11
|
23.08.2011 up to 15.00 hrs.
|
23.08.2011 at 15.30 hrs.
|
40000
|
|
|
Tender No: IRCON/Civil/1029/RCF-RBL/T & P BLOCK/7000/OT/03
|
Construction of Toilet cum Parking Blocks & Time Office in Factory area for Rail Coach Factory at Lalganj, Raebareli, (UP).
|
21.07.11
|
26.07.11
|
17.08.2011 up to 15:00 hrs.
|
17.08.2011 up to 15:30 hrs.
|
120000
|
|
|
Tender No:IRCON/Civil/1029/RCF-RBL/Compr.Room/7000/OT/06
|
Construction of Compressor rooms in Factory area for Rail Coach Factory at Lalganj, Raebareli, (UP).
|
21.09.11
|
23.09.11
|
18.10.2011 up to 15.00 hrs.
|
18.10.2011 at 15.30 hrs.
|
40000
|
|
|
Tender No. IRCON/1014/J&K-CELL/TL-1/ dated 12.12.11
|
Assembling, laying & linking of broad gauge railway track from Km 150/000 to Km 152/550 (South Portal of T-80) and Km 163/720 to Km 167/988(North Portal of T-80 to Qazigund dead end) with 60Kg/52Kg (110UTS/90UTS) New rails including loop lines, siding, Trap points and Points & Crossings, Ballasting, Transportation Rail/Rail panels, Transportation of sleepers, Ballast packing of linking BG Track to make it fit for rail traffic, fixing of guard rails and other allied P-way works in connection with
|
12.12.11
|
13.12.11
|
05.01.2012 up to 15.00 hrs.
|
05.01.2012 at 15.30 hrs.
|
2.20 lacs
|
|
|
Tender No.: IRCON/1008/J&K-DLI/ GRP Barracks -Kakpora/GRP-10R1/ Dt.16.07.2011
|
Construction of 42 Bedded GRP Barracks and other miscellaneous works such as Compound wall, Chain Link Fencing etc., at Kakpora Railway Station Yard (GRP-10R1) on Qazigund - Baramulla New BG Rail Line Project (J&K
|
16.07.11
|
26.07.11
|
11.08.2011 up to 15.00 hrs.
|
11.08.2011 at 15.30 hrs.
|
256000
|
|
|
Tender No.: IRCON/1014/J&K-DQ/S&T/LSZH Cables/01 dated 17-02-2012
|
Supply of PVC Insulated Armoured, Unscreened, Underground Railway Signalling Cable, 19 Core x 1.5 Sq.mm Copper Conductor as per RDSO Spec. no. IRS: S-63/2007 (Amd.-2) or latest and Underground Railway Jelly Filled 6 Quad Cables 1.4 mm dia Copper Conductor as per RDSO Spec. No. RDSO/SPN/TC 72/2007 with Amd. No. 1 or latest with add on specifications regarding outer sheathing conforming to International standards ISO 4589-2-1999 OR LATEST& NFPA 270 to cater for Low Smoke Zero Halogen features at B
|
17.02.12
|
18.02.12
|
13.03.2012 up to 15.00 hrs.
|
13.03.2012 at 15.30 hrs.
|
Rs. 2.21 lacs
|
|
|
Tender No.: IRCON/J&K Cell/JAT/14/1014/D-Q/ Pedest.Xing-Zone-VI/FOB-2R
|
Construction of One Foot-Over- Bridge for pedestrians crossing at Km 164/820 in Zone-VI, Distt. Anantnag, on Dharam–Qazigund Section of USBRL Project (J&K) (Package: FOB-2R)
|
19.12.11
|
21.12.11
|
17.01.2012 up to 15.00 hrs. Changed to 25.01.2012 up to 15.00 hrs. Changed to 02.02.2012 up to 15.00 hrs.
|
17.01.2012 at 15.30 hrs. Changed to 25.01.2012 at 15.30 hrs. Changed to 02.02.2012 at 15.30 hrs.
|
178000
|
|
|
Tender No.: IRCON/J&K-CELL/JAT/14/7004/03/
|
Construction of Multi Functional Complex (MFC) comprising of Rail Yatri Niwas & Passenger Amenities Center at Jammu Tawi Railway Station, Jammu & Kashmir
|
12.03.12
|
15.03.12
|
10.04.2012 up to 15.00 hrs.
|
10.04.2012 at 15.30 hrs.
|
527000
|
|
|
Tender No.: IRCON/J&K-Cell/JAT/15/1014/T-80/Telecontrol Date: 24.11.2011
|
‘’Supply, Erection, Testing & Commissioning of Tele control System i.e. SCADA system for control & Monitoring of complete T-80 Tunnel ventilation, tunnel illumination, safety system, protection system, Telecommunication system, Tunnel sub stations & Portal sub stations etc. complete in all respect required for Tunnel T-80 Ventilation & safety electro mechanical installations on Dharam-Qazigund section of USBRL Project (Package: SCADA system )”
|
24.11.11
|
09.12.11
|
30.12.2011 up to 15.00 hrs. Changed to 17.01.2012 up to 15.00 hrs. Changed to 24.01.2012 up to 15.00 hrs. Changed to 02.02.2012 up to 15.00 hrs.
|
30.12.2011 at 15.30 hrs. Changed to 17.01.2012 at 15.30 hrs. Changed to 24.01.2012 at 15.30 hrs. Changed to 02.02.2012 at 15.30 hrs.
|
Rs 6.80 Lacs
|
|
|
Tender No.:IRCON/1008/J&K-DLI/Senior Sub-Ordinate Rest House-Srinagar/OB-24 Date: 20.01.2011
|
Construction of Senior Sub-Ordinate Rest House & Miscellaneous works at Railway Holiday Home Complex at Tulsi bagh, Srinagar on Qazigund-Baramulla New BG Rail Line Project (J&K) (Package: OB-24)
|
20.01.11
|
20.01.11
|
10.02.2011 up to 15.00 hrs.
|
10.02.2011 at 15.30 hrs.
|
383500
|
|
|
Tender No.:IRCON/J&K-Cell/JAT/15/1014/D-Q/T-80/11KVSystem Date: 22.11.2011
|
“Supply ,Erection, Testing & Commissioning of 11 KV Electro Mechanical System consisting of 5 Nos. 11/0.433 KV, 500 KVA Sub-station, switchgears with 11 KV Cables etc. and other related equipments complete in connection with T-80 Tunnel Ventilation system on Dharam-Qazigund Section of USBRL project (J&K) (Package T-80, 11 KV )”.
|
22.11.11
|
30.11.11
|
21.12.2011 up to 15.00 hrs. changed to 06.01.2012 up to 15.00 hrs. Changed to 17.01.2012 up to 15.00 hrs. Changed to 24.01.2012 up to 15.00 hrs. Changed to 02.02.2012 up to 15.00 hrs.
|
21.12.2011 at 15.30 hrs. changed to 06.01.2012 at 15.30 hrs. Changed to 17.01.2012 at 15.30 hrs. Changed to 24.01.2012 at 15.30 hrs. Changed to 02.02.2012 at 15.30 hrs.
|
14.25 lacs
|
|
|
Tender No.:IRCON/J&K-Cell/JAT/15/1014/D-Q/T-80/E&M System Date: 30.11.2011
|
“Supply ,Erection, Testing & Commissioning of Electro Mechanical (E&M) System consisting of LV power supply, emergency power supply, earthing, tunnel lighting & fittings, fire detection, building electrification, HVAC etc. and other related equipments complete in connection with T-80 Tunnel Ventilation & safety system on Dharam-Qazigund Section of USBRL project (J&K) (Package T-80, E&M )”.
|
30.11.11
|
20.12.11
|
17.01.2012 up to 15.00 hrs. Changed to 25.01.2012 up to 15.00 hrs. Changed to 03.02.2012 up to 15.00 hrs.
|
17.01.2012 at 15.30 hrs. Changed to 25.01.2012 at 15.30 hrs. Changed to 03.02.2012 at 15.30 hrs.
|
Rs 23.75 lacs
|
|
|
Tender No.:IRCON/J&K-Cell/JAT/15/1014/T-80/Ventilation Date: 23.11.2011
|
Supply ,Erection, Testing & Commissioning of Tunnel Ventilation and Control System consisting of 1.6 M diameter Jet Fans , 0.65 M diameter Axial Fans etc. and Air Control & Ventilation Control system and other related equipments etc. complete for the Tunnel T-80 Ventilation System on Dharam- Qazigund Section of USBRL Project (J&K) (Package T-80, Ventilation System)”.
|
23.11.11
|
05.12.11
|
05.01.2012 up to 15.00 hrs. Changed to 17.01.2012 up to 15.00 hrs. Changed to 25.01.2012 up to 15.00 hrs. Changed to 03.02.2012 up to 15.00 hrs.
|
05.01.2012 at 15.30 hrs. Changed to 17.01.2012 at 15.30 hrs. Changed to 25.01.2012 at 15.30 hrs. Changed to 03.02.2012 at 15.30 hrs.
|
Rs. 10.40 lacs
|
|
|
Tender No: IRCON/3015/TN/ROB-RAJ/JDPR-RUB-71B- KPR2/12/20 Dated: 23.02.2012
|
Design and Construction of Two Lane Road Under Bridge (RUB) by Cut & Cover Technique comprising Two Boxes for each lane size (1x 5.75 x 3.60)+(1 x 4.75 x 3.60) m including it’s approaches, Design, Casting & Placing box segments, Drainage, Allied Road works & Junction Development etc. complete, as per Specifications & Drawings, Maintaining all Quality Control Standards complete near existing underpass bridge 71 B at Khatarnak Puliya on Jodhpur Pali Section of NW Railways, near DRM Office, Jodhpu
|
23.02.12
|
17.03.12
|
19.03.2012 up to 15.00 hrs. Changed to 27.03.2012 up to 15.00 hrs. Changed to 31.03.2012 up to 15.00 hrs.
|
19.03.2012 at 15.30 hrs. Changed to 27.03.2012 at 15.30 hrs. Changed to 31.03.2012 at 15.30 hrs.
|
500000
|
|
|
Tender No: IRCON/Civil/1029/RCF-RBL/10/Tender/3/OT-19 Dt.20.09.2011
|
Construction of Wheel shop, Bogie Shop,
Paint Shop, Garnet Blasting Shop, Machine
Shop, Transport Shop & Shell Store of RCF
Raebareli including Architectural &
Structural Design, Fabrication, Supply and Erection of Pre-Engineered Steel Buildings
|
20.09.11
|
21.09.11
|
20.10.2011 up to 15.00 hrs. Changed to 01.11.2011 up to 15.00 hrs.
|
20.10.2011 at 15.30 hrs. Changed to 01.11.2011 at 15.30 hrs.
|
2500000
|
|
|
Tender No: IRCON/J&K-Cell/JAT/14/1014/D-Q/CMS Crossing/TS-6/ Date: 02.1.2012
|
Manufacturing & Supply of CMS Crossing for B.G 60 Kg (UIC), 90 UTS rails for 1 in 12 Turn outs on PSC Sleeper as per relevant RDSO Drawings including Loading, Leading, Unloading & Proper stacking at Banihal Yard for Dharam- Quazigund New BG Rail Line Project.(J&K) (Package TS-6)
|
02.01.12
|
03.01.12
|
23.01.2012 up to 15:00 hrs.
|
23.01.2012 up to 15:30 hrs.
|
Rs. 48,000/-
|
|
|
Tender No: IRCON/J&K-Cell/JAT/14/1014/D-Q/Fish Plates/TS-5/200 Date: 23.12.2011
|
Manufacturing & Supply of Joggled Fish Plate, Combination Fish Plate and Fish Plate 1 Mtr Long with Nuts & Bolts for B.G 60 Kg (UIC) rails as per relevant RDSO Drawings including Loading, Leading, Unloading & Proper stacking at Banihal Yard for Dharam- Quazigund New BG Rail Line Project.(J&K)
|
23.12.11
|
03.01.12
|
17.01.2012 up to 15.00 hrs.
|
17.01.2012 at 15.30 hrs.
|
Rs.26,000/-
|
|
|
Tender No: IRCON/J&K-Cell/JAT/14/1014/D-Q/SEJ’s/T-4/215 Date: 23.12.2011
|
Manufacturing & Supply of Improved Switch Expansion Joints (Straight) for LWR with fittings for B.G 60Kg on PSC Sleeper as per relevant RDSO Drawings including Loading, Leading, Unloading & Proper stacking at Banihal Yard for Dharam- Quazigund New BG Rail Line Project.(J&K)
|
23.12.11
|
03.01.12
|
17.01.2012 up to 15.00 hrs. Changed to 24.01.2012 up to 15.00 hrs.
|
17.01.2012 at 15.30 hrs. Changed to 24.01.2012 at 15.30 hrs.
|
Rs.53,000/-
|
|
|
Tender No: IRCON/J&K-Cell/JAT/15/1008/Q-B/11kV Feeder Line/144, Date: 29.03.2012
|
“Construction of 11kV Feeder
Line for illumination of major bridges, duty huts & L.C. Gates, including
construction of pole-mounted electrical substations/isolation points along the
Railway track on Qazigund-Baramulla Section of USBRL Project (J&K),
(Package-11 kV Feeder)”
|
29.03.12
|
04.04.12
|
25.04.2012 up to 15.00 hrs. Changed to 09.05.2012 up to 15.00 hrs.
|
25.04.2012 at 15.30 hrs. Changed to 09.05.2012 at 15.30 hrs.
|
Rs 4.08 lacs
|
|
|
Tender No:IRCON/J&K Cell/JAT/1014/TR-01/
|
“Transportation of 60 Kg (UIC) Head Hardened Rails (13 meter long) from Mumbai Port to Banihal, Dist: Ramban in Jammu & Kashmir, including Custom Clearance, Loading, Leading, Unloading & Stacking in connection with Construction of Dharam – Quazigund Section (Package TR-01)”
|
20.09.11
|
20.09.11
|
13.10.2011 up to 15.00 hrs.
|
13.10.2011 at 15.30 hrs.
|
267000
|
|