Supply of Modern, High Speed, Lightweight Passenger Cars To Suit Railways Specifications And Needs.
|
|
Coaches manufactured by world class manufacturing units of Indian Railways equipped with state-of-the-art machines having laser and plasma technology, robotic welding and spot welding machines.
|
Use of computer aided design and manufacturing process (CAD/CAM).
|
Over 50 CNC machines .
|
Large range of passenger cars to chose from : A/c First Class, A/c Executive Chair Car, A/c Chair Car, Second Class Sleeper and Day Car to suit any track gauge.
|
|
Supply of Diesel Electric Locomotives To Suit Customers Specifications And Operating Requirement.
|
|
Wide body, air-conditioned dual cab.
|
Locomotives range from 1350 Hp to 4000 Hp having transmission of DC/DC or AC/DC.
|
Speed upto 160 Kmph .
|
Fuel efficient turbo charge engines of ALCO and General Motors design.
|
|
Leasing And Maintenance Of Diesel Locomotives
|
|
Supply of new or old diesel locomotives on lease basis.
|
Carry out comprehensive maintenance of locomotives including supply of expert technicians and spare parts.
|
Give assured 'AVAILABILITY' (of over 80%) and 'RELIABILITY' of locomotives by IRCON.
|
|
Supply of Plant & Machinery For Workshops
|
|
Identification, Selection, Procurement, Supply, Installation & Commissioning of plant and machinery for workshops.
|
|
Salient features of Completed Projects
|
|
Jordon
|
|
Setting up of Diesel Locomotive Maintenance Railway Workshop at Aqaba for Aqaba Railway Corporation including supply, erection and commissioning of Plant and Machinery at a cost of US$ 4 million in 1987-89.
|
|
Saudi Arabia
|
|
Setting up of a major Railway Maintenance Workshop for Saudi Railways Organization (SRO) at Dammam including supply, erection and commissioning of Plant and Machinery at a cost of US$ 26 million in 1984-87.
|
|
Malaysia
|
|
Refurbishment and major overhaul of 12 Nos. of Class 22 (Hitachi Make) Diesel locomotives of Malaysian Railways at a cost of RM 1.87 million 1996-97.
|
Maintenance of 13 Nos. of diesel locomotives of Malaysian Railways at a cost of RM 5.8 million in 1997-98.
|
Wet Lease (Supply and Comprehensive maintenance) of 25 meter Gauge(1000 mm) diesel locomotives to KTMB , Malaysian Railway at a total cost of USD 6.988 million per annum:-
Salient features :
Assured availability : Minimum 86.3%.
Assured Reliability : Max. 1 failure per 50,000 Kms. of locomotive run.
Comprehensive maintenance by IRCON including supervision, expert technicians and supply of all spare parts required for loco maintenance.
|
|
Our Valued Clients
|
|
Malaysian Railway - Keretapi Tanah Melayu Behad.
|
Saudi Railway Organization, Dammam, Saudi Arabia.
|
Aqaba Railway Corporation, Jordon.
|
Bangladesh Railway.
|